@ -4,11 +4,11 @@ type: workplan
title: "Generation 3 serves from the host being decommissioned"
domain: infotech
repo: prj-state-hub-retirement
status: proposed
owner: unassigned
status: active
owner: codex
topic_slug: state-hub-retirement
created: "2026-08-20"
updated: "2026-08-20"
updated: "2026-09-04"
state_hub_workstream_id: "53f42c0c-3a35-53b0-99c8-8eaee7b17354"
---
@ -43,6 +43,15 @@ The lesson is the opposite of the one first drafted: **generation 2 was retired
well.** What nobody checked was whether the successor's runtime was standing on
durable ground.
## Re-baseline — 2026-09-04
The immediate runtime risk has been resolved. `CORE-WP-0011` moved Core Hub to
railiance01, its tasks are complete, and the project decision record documents
the corrected generation-2 history and the CoulombCore exit. The project must
still finish the cross-generation inventory and guardrails: the generation-2
disposition file and repository-reality ledger do not yet exist, `G-GEN` has not
been adopted, and live legacy package/access references remain.
## What was observed, 2026-08-20
| Generation | Position | Observed |
@ -86,7 +95,7 @@ identifier.
```task
id: SHR-WP-0002-T01
status: todo
status: done
priority: high
state_hub_task_id: "8c54ea9b-8a92-55bc-80ce-8425678f3efe"
```
@ -96,10 +105,8 @@ production cutover gates on 2026-07-03; `CORE-WP-0007` retired the Haskell/IHP
infrastructure by 2026-07-08 with operator approval and a stabilization window.
The `0/0` rollback deployment is the designed end state.
Remaining sub-task: record this in `DECISIONS.md` **with the correction**, so
the project's own record shows that the first reading was wrong and why. A
retirement project that misreads a completed retirement as an attrition should
keep the evidence trail for the next reader.
**Completed 2026-09-04.** `DECISIONS.md` records the correction and its evidence,
so the project's own record shows that the first reading was wrong and why.
```task
id: SHR-WP-0002-T02
@ -124,7 +131,7 @@ estate intended to have, does not have, and has not decided to do without.
```task
id: SHR-WP-0002-T03
status: todo
status: done
priority: high
state_hub_task_id: "06119690-312f-5d14-aee0-2fc4dac1e89e"
```
@ -177,6 +184,12 @@ Eleven days. See `DECISIONS.md`. On that constraint the project recommends the
interim move — an architecture decision plus a production migration inside
eleven days is not a plan. The choice remains core-hub's.
**Completed 2026-09-04.** Core Hub chose and completed the interim move under
`CORE-WP-0011`. Production now runs on railiance01, the CoulombCore Deployments
were scaled to zero after stabilization, and the sequence and disposition are
recorded in `DECISIONS.md`. `CORE-WP-0010` remains historical context, not the
vehicle that ultimately resolved this task.
```task
id: SHR-WP-0002-T04
status: todo
@ -196,7 +209,7 @@ files from here — the project's authority is the ledger, not the prose.
```task
id: SHR-WP-0002-T05
status: todo
status: progress
priority: medium
state_hub_task_id: "c2957182-4bb3-5aa9-9940-656956cfe52d"
```
@ -216,6 +229,11 @@ jobs whose subject is a retired or lapsed generation. Route retirements to owner
record the sweep here so the next generation change has a checklist rather than a
memory.
**Progress 2026-09-04.** The sweep has enumerated SSH, registry, credential, and
runner lanes, but closure is incomplete. In particular,
`inter-hub-bootstrap-ssh` remains an active high-risk catalog lane and needs an
owner decision rather than silent deletion.
```task
id: SHR-WP-0002-T06
status: todo
@ -236,7 +254,7 @@ decision route rather than adding it unilaterally.
```task
id: SHR-WP-0002-T07
status: todo
status: progress
priority: high
state_hub_task_id: "a89cf85d-d613-5434-92cb-11f850889b08"
```
@ -252,6 +270,13 @@ Nothing breaks on decommission day, because running pods already hold their
images. It breaks at the next restart, reschedule or scale-up, as
`ImagePullBackOff`.
**Progress update 2026-09-04.** `REUSE-WP-0020` and `KAIZEN-WP-0010` are
finished, and Core Hub has moved. Closure is still blocked by live legacy
surfaces: the `whynot-design-npm-publish` lane targets the old npm registry,
`issue-core` retains its legacy Gitea PyPI upload target, and the platform ArgoCD
bootstrap allow-list still admits Gitea repositories. Route and verify those
residuals before marking this task done.
**The two are not equally urgent** (corrected 2026-08-20 after checking each
reference's liveness):