132 lines
6 KiB
Markdown
132 lines
6 KiB
Markdown
|
|
---
|
|||
|
|
repo: prj-unattended-progress-company
|
|||
|
|
repo_flavor: project
|
|||
|
|
project_status: active
|
|||
|
|
started: "2026-08-09"
|
|||
|
|
reviewed: "2026-08-09"
|
|||
|
|
---
|
|||
|
|
|
|||
|
|
# Project goal
|
|||
|
|
|
|||
|
|
## Outcome
|
|||
|
|
|
|||
|
|
Make **Binky Hedgehog GmbH** a **profitable, self-organizing company** that
|
|||
|
|
advances with **minimal founder time and governance** from Bernd Worsch as
|
|||
|
|
CEO/Geschäftsführer.
|
|||
|
|
|
|||
|
|
"Self-organizing" means the company can detect what needs doing, prepare safe
|
|||
|
|
next steps, execute high-autonomy work unattended, and surface only the
|
|||
|
|
decisions that must remain human — without stalling when the founder is offline.
|
|||
|
|
|
|||
|
|
"Minimal time and governance" means the default CEO load is roughly **1–3 hours
|
|||
|
|
per day outside business hours** plus about **two office-hour days per month**,
|
|||
|
|
with attention spent on approve/reject packages, risk acceptance, and strategic
|
|||
|
|
direction — not on routine coordination, status chasing, or ad-hoc firefighting.
|
|||
|
|
|
|||
|
|
This project **coordinates** the cross-repo operating model, company
|
|||
|
|
reactivation, offer/revenue path, and autonomy stack. Production
|
|||
|
|
implementation, company canon, and durable product code live in participating
|
|||
|
|
repositories (especially `binky-control` and ecosystem pillars), not in this
|
|||
|
|
project repo.
|
|||
|
|
|
|||
|
|
## Strategic framing
|
|||
|
|
|
|||
|
|
Binky Hedgehog GmbH is the commercial vessel for the operational-knowledge
|
|||
|
|
ecosystem (Coulomb / Net Kingdom / Railiance / OK). Long-term identity:
|
|||
|
|
**Operational Knowledge GmbH**. This project's job is not brand mythology; it
|
|||
|
|
is to reach **profitable unattended progress** as a solo-founder company OS.
|
|||
|
|
|
|||
|
|
## Invariants
|
|||
|
|
|
|||
|
|
1. **Human-on-the-loop, not human-in-the-loop.** "Ask Bernd" is never the
|
|||
|
|
default. Agents continue with the safest useful next step; uncertainty
|
|||
|
|
triggers research, comparison, or a prepared decision package.
|
|||
|
|
2. **Autonomy lanes are binding.** Green/Blue proceed unattended; Yellow is
|
|||
|
|
prepared for review; Orange batches to office hours; Red stays human-only
|
|||
|
|
(signing, bank/payment execution, contracts, sensitive legal/HR/security,
|
|||
|
|
external company commitments, risk acceptance).
|
|||
|
|
3. **Local files remain authoritative.** Workplans, decisions, and company
|
|||
|
|
records originate in repos; State Hub is a read/index model synced from
|
|||
|
|
files — never the reverse.
|
|||
|
|
4. **This repo does not host production implementation** of company systems or
|
|||
|
|
product code. It owns goal, gates, sequencing, dependency map, risks, and
|
|||
|
|
consolidated evidence.
|
|||
|
|
5. **Founder attention is budgeted.** Briefs and decision cards are
|
|||
|
|
evidence-backed with approve/reject options; open-ended dumps are out of
|
|||
|
|
bounds.
|
|||
|
|
6. **Secrets never land in this repo** (or chat, workplans, evidence dumps).
|
|||
|
|
Route credentials through ops-warden / OpenBao patterns.
|
|||
|
|
7. **Profitability is real cash**, not ecosystem vanity metrics alone — first
|
|||
|
|
paid revenue and a path to repeatable contribution margin matter before
|
|||
|
|
rename or category claims.
|
|||
|
|
|
|||
|
|
## Success gates
|
|||
|
|
|
|||
|
|
The project goal is achieved only when all of the following are true (with
|
|||
|
|
evidence linked from this repo):
|
|||
|
|
|
|||
|
|
### Company vessel
|
|||
|
|
|
|||
|
|
- [ ] **G1 — Administratively clean.** Handelsregister, address, tax/StB
|
|||
|
|
mandate, bookkeeping workflow, and banking access are current and usable
|
|||
|
|
for ordinary operations (binky-control Phase 1 / S1).
|
|||
|
|
- [ ] **G2 — Company OS active.** Canon, autonomy policy, decision queue,
|
|||
|
|
office-hour rhythm, and control loops are in force so work does not
|
|||
|
|
depend on ad-hoc founder memory (binky-control S2).
|
|||
|
|
|
|||
|
|
### Unattended progress
|
|||
|
|
|
|||
|
|
- [ ] **G3 — Dogfood loop closed.** At least one end-to-end internal loop runs
|
|||
|
|
unattended under Green/Blue policy and produces auditable progress
|
|||
|
|
without founder mid-flight steering (S3).
|
|||
|
|
- [ ] **G4 — Founder load within budget.** Measured over a sustained window
|
|||
|
|
(recommended: ≥30 calendar days), CEO time stays within the 1–3 h/day +
|
|||
|
|
~2 office-hour days/month envelope for routine company ops, with Red-lane
|
|||
|
|
exceptions logged rather than becoming the default.
|
|||
|
|
|
|||
|
|
### Profitability
|
|||
|
|
|
|||
|
|
- [ ] **G5 — External offer published.** At least one concrete offer is public
|
|||
|
|
and sellable (S4).
|
|||
|
|
- [ ] **G6 — First paid revenue.** At least one external customer payment is
|
|||
|
|
received and booked (S5).
|
|||
|
|
- [ ] **G7 — Repeatable path.** A productized service or software-supported
|
|||
|
|
delivery path exists with unit economics that can cover run costs without
|
|||
|
|
perpetual founder heroics (S6–S7 directionally; full multi-customer scale
|
|||
|
|
is residual to durable product repos).
|
|||
|
|
|
|||
|
|
### Governance minimum
|
|||
|
|
|
|||
|
|
- [ ] **G8 — Decision surface is thin.** Outstanding Yellow/Orange items are
|
|||
|
|
packaged; Red items are few and explicit; no material company work is
|
|||
|
|
blocked solely because "nobody asked Bernd."
|
|||
|
|
- [ ] **G9 — Residuals owned outside this project.** Every unfinished
|
|||
|
|
obligation has a live work record in a permanent repo (or cancelled with
|
|||
|
|
rationale).
|
|||
|
|
|
|||
|
|
## Non-goals (this project)
|
|||
|
|
|
|||
|
|
- Becoming a permanent portfolio database or second company canon (that is
|
|||
|
|
`binky-control` and durable product repos).
|
|||
|
|
- Hosting production services, SaaS deployables, or customer data.
|
|||
|
|
- Renaming to Operational Knowledge GmbH or pursuing ok.com-level brand
|
|||
|
|
outcomes (those are later milestones beyond this project's gates).
|
|||
|
|
- Maximizing agent activity for its own sake without revenue or load reduction.
|
|||
|
|
|
|||
|
|
## Project retirement
|
|||
|
|
|
|||
|
|
This repository is temporary. It may be completed and archived when:
|
|||
|
|
|
|||
|
|
1. every success gate above has accepted evidence;
|
|||
|
|
2. residuals have live owners and work records outside this repository;
|
|||
|
|
3. durable operating policies, offers, and architecture decisions are promoted
|
|||
|
|
into permanent homes (`binky-control`, product repos, or canon);
|
|||
|
|
4. project workplans are finished, cancelled with rationale, or handed off;
|
|||
|
|
5. a completion record exists under `history/` listing evidence, participating
|
|||
|
|
repos, promoted artefacts, and remaining operational obligations;
|
|||
|
|
6. `project_status` is set to `completed` then `archived`, and the forge copy
|
|||
|
|
is made read-only.
|
|||
|
|
|
|||
|
|
Retirement means archival, not deletion. The repository remains the provenance
|
|||
|
|
record for how the unattended-progress company model was established.
|