prj-unattended-progress-com.../inventory/baseline-g1-g9.md

108 lines
5.5 KiB
Markdown
Raw Normal View History

---
id: UPC-INV-0001
type: inventory
repo: prj-unattended-progress-company
parent_workplan: UPC-WP-0001
created: "2026-08-11"
as_of: "2026-08-11"
---
# Baseline inventory — company state vs G1G9
Snapshot of Binky Hedgehog GmbH operating state for the unattended-progress
project. Prefer **pointers** into `binky-control` over rewriting canon.
Source root: `/home/worsch/binky-control` (hub slug `binky-control`).
## G1 — Administratively clean (S1 / Phase 1)
| Area | Snapshot | Pointer |
| --- | --- | --- |
| Legal vessel | Exists since 2019 (S0 done) | `SuccessMilestones.md` S0 |
| Handelsregister / address / purpose | **Verify pending** (OH prepared) | `OfficeHourQueue.md` OH-2026-004; `CompanyReactivationPlan.md` Legal |
| StB mandate JA 2025+ | **In progress** — inquiry Bohle-Horsmann; follow-up prepared | OH-2026-001; RISK-006 |
| Filings history | Current through JA 2024 | Reactivation Plan Tax checklist |
| Bookkeeping / DATEV DUO | Transition + receipt backlog open | OH-2026-002; RISK-007 |
| Banking | Qonto **active**; cost/access review prepared | OH-2026-003; BINKY-WP-0005 evidence |
| Cost / run-rate | Table v2 with Qonto-verified rows | `finance/CostRunRate.md`, `finance/qonto-first-pull-2026-07-21.json` |
| Domains / email | `binky-hedgehog.com` owned; company email exists; NK/OpenBao integration residual | AWQ-003, AWQ-007 history; Reactivation digital presence |
| Website | Minimal public page **missing** | Reactivation digital presence |
| Contracts / IP ownership | Inventory incomplete; needed before selling ecosystem products | Reactivation Contracts & IP |
**Verdict:** **partial**. Orange-lane OH batch is the main G1 execution path.
## G2 — Company OS active (S2)
| Artefact | State | Pointer |
| --- | --- | --- |
| Company canon | **v1.0 ratified** 2026-07-16 (DEC-2026-001) | `INTENT.md`, DecisionQueue |
| Autonomy policy | Present; lanes used in queues/WPs | `AutonomyPolicy.md` |
| Decision queue | Live; recent decisions resolved | `DecisionQueue.md` |
| Office-hour queue | Live; 5 prepared items | `OfficeHourQueue.md` |
| Autopilot queue | Live; high-leverage items largely closed/promoted | `AutopilotWorkQueue.md` |
| Operating rhythm | Daily brief + queue hygiene defined; briefs through early Aug 2026 | `OperatingRhythm.md`, `briefs/` |
| Control loops / dogfood policy | Present | `ControlLoopCatalog.md`, `DogfoodPolicy.md` |
| State Hub integration | Bootstrap done | BINKY-WP-0001 |
**Verdict:** **partial → near met** operationally. Reactivation Plan still lists
some governance checkboxes open; treat as checklist lag vs lived OS.
## G3 — Dogfood loop closed (S3)
| Loop | State | Pointer |
| --- | --- | --- |
| OK Audit dogfood | v0 run on Binky 2026-07-16 | `audits/OK-Audit-v0-binky.md` |
| Autopilot + rhythm | WPs 0003 finished | BINKY-WP-0003 |
| Workstation-independent executor | Finished 2026-07-21 | BINKY-WP-0004 |
| Railiance llm-connect rhythm (no host coding agent) | Finished | BINKY-WP-0006 |
| Weekly founder review via llm-connect | Production proof 2026-08-08 | AWQ-011 → REIN-A-0003; ops_run `ad0b05c4-8ad8-40c7-9985-75481728ae30` |
| Qonto as agent-readable finance | Integration finished | BINKY-WP-0005, BINKY-WP-0007 |
**Verdict:** **partial / strong**. Unattended loops exist with evidence; S3
milestone not yet founder-marked; project still needs a single acceptance
evidence pack under `evidence/` when claiming G3 met.
## G4 — Founder load within budget
| Item | State |
| --- | --- |
| Target envelope | 13 h/day outside business hours + ~2 OH days/month (`GOAL.md`, `INTENT.md`) |
| Measurement | **Gap** — no sustained time log or automated load KPI for ≥30 days |
| Qualitative signal | Office-hour batching and decision packaging reduce random interrupts; load not proven |
**Verdict:** **open**.
## G5G7 — Profitability path
| Gate | State | Pointer |
| --- | --- | --- |
| G5 Offer published | Flagship **Operational Knowledge Audit** drafted; status `drafted` — publish is Yellow | `OfferCatalog.md` |
| G6 First paid revenue | No booked external sale of the offer; incidental/sublet credits ≠ product revenue | CostRunRate “Known recurring income” |
| G7 Repeatable path | Not started as productized delivery | — |
**Verdict:** G5G7 **open**; G5 is the immediate commercial unlock after G1 OH drain and publish decision.
## G8 — Decision surface thin
| Queue | Open surface (as of scan) |
| --- | --- |
| DecisionQueue | Template allows prepared/resolved/deferred; recent structured decisions resolved |
| OfficeHourQueue | **5 prepared** (StB, DUO, Qonto, Handelsregister, Stripe webhook) — correctly Orange-batched |
| AutopilotWorkQueue | Optional/open residuals: AWQ-012, AWQ-002, AWQ-003, AWQ-006 (low urgency cartography/domain) |
**Verdict:** **partial**. Surface is packaged (not ad-hoc), but G1 OH load means
the company is not yet “thin” on founder business-hour demand.
## G9 — Residuals owned outside project
Not claimable until project retirement. Residual **pattern** is already
established in `binky-control` (AWQ intakes with `origin: residual` +
`origin_ref`). Each finishing UPC-WP must hand residuals as live records.
## Top leverage (baseline conclusion)
1. **Drain prepared OH batch (G1 / G8)** — highest leverage for vessel clean + thinner founder surface.
2. **Yellow decision: publish OK Audit offer (G5)** — once vessel is credible.
3. **Define G4 measurement** — so “minimal CEO time” is evidence, not aspiration.
4. **Package G3 acceptance** — declare S3 with linked ops_run/audit evidence.