Establish project goal, register scaffolding, and draft UPC-WP-0001.
Add GOAL.md for profitable self-organizing Binky Hedgehog GmbH with minimal CEO governance, prj-flavor SCOPE/AGENTS/classification, and foundation workplan UPC-WP-0001 to map gates G1–G9 and child streams.
This commit is contained in:
parent
cbbee4e15a
commit
0dd1da1366
7 changed files with 523 additions and 2 deletions
131
GOAL.md
Normal file
131
GOAL.md
Normal file
|
|
@ -0,0 +1,131 @@
|
|||
---
|
||||
repo: prj-unattended-progress-company
|
||||
repo_flavor: project
|
||||
project_status: active
|
||||
started: "2026-08-09"
|
||||
reviewed: "2026-08-09"
|
||||
---
|
||||
|
||||
# Project goal
|
||||
|
||||
## Outcome
|
||||
|
||||
Make **Binky Hedgehog GmbH** a **profitable, self-organizing company** that
|
||||
advances with **minimal founder time and governance** from Bernd Worsch as
|
||||
CEO/Geschäftsführer.
|
||||
|
||||
"Self-organizing" means the company can detect what needs doing, prepare safe
|
||||
next steps, execute high-autonomy work unattended, and surface only the
|
||||
decisions that must remain human — without stalling when the founder is offline.
|
||||
|
||||
"Minimal time and governance" means the default CEO load is roughly **1–3 hours
|
||||
per day outside business hours** plus about **two office-hour days per month**,
|
||||
with attention spent on approve/reject packages, risk acceptance, and strategic
|
||||
direction — not on routine coordination, status chasing, or ad-hoc firefighting.
|
||||
|
||||
This project **coordinates** the cross-repo operating model, company
|
||||
reactivation, offer/revenue path, and autonomy stack. Production
|
||||
implementation, company canon, and durable product code live in participating
|
||||
repositories (especially `binky-control` and ecosystem pillars), not in this
|
||||
project repo.
|
||||
|
||||
## Strategic framing
|
||||
|
||||
Binky Hedgehog GmbH is the commercial vessel for the operational-knowledge
|
||||
ecosystem (Coulomb / Net Kingdom / Railiance / OK). Long-term identity:
|
||||
**Operational Knowledge GmbH**. This project's job is not brand mythology; it
|
||||
is to reach **profitable unattended progress** as a solo-founder company OS.
|
||||
|
||||
## Invariants
|
||||
|
||||
1. **Human-on-the-loop, not human-in-the-loop.** "Ask Bernd" is never the
|
||||
default. Agents continue with the safest useful next step; uncertainty
|
||||
triggers research, comparison, or a prepared decision package.
|
||||
2. **Autonomy lanes are binding.** Green/Blue proceed unattended; Yellow is
|
||||
prepared for review; Orange batches to office hours; Red stays human-only
|
||||
(signing, bank/payment execution, contracts, sensitive legal/HR/security,
|
||||
external company commitments, risk acceptance).
|
||||
3. **Local files remain authoritative.** Workplans, decisions, and company
|
||||
records originate in repos; State Hub is a read/index model synced from
|
||||
files — never the reverse.
|
||||
4. **This repo does not host production implementation** of company systems or
|
||||
product code. It owns goal, gates, sequencing, dependency map, risks, and
|
||||
consolidated evidence.
|
||||
5. **Founder attention is budgeted.** Briefs and decision cards are
|
||||
evidence-backed with approve/reject options; open-ended dumps are out of
|
||||
bounds.
|
||||
6. **Secrets never land in this repo** (or chat, workplans, evidence dumps).
|
||||
Route credentials through ops-warden / OpenBao patterns.
|
||||
7. **Profitability is real cash**, not ecosystem vanity metrics alone — first
|
||||
paid revenue and a path to repeatable contribution margin matter before
|
||||
rename or category claims.
|
||||
|
||||
## Success gates
|
||||
|
||||
The project goal is achieved only when all of the following are true (with
|
||||
evidence linked from this repo):
|
||||
|
||||
### Company vessel
|
||||
|
||||
- [ ] **G1 — Administratively clean.** Handelsregister, address, tax/StB
|
||||
mandate, bookkeeping workflow, and banking access are current and usable
|
||||
for ordinary operations (binky-control Phase 1 / S1).
|
||||
- [ ] **G2 — Company OS active.** Canon, autonomy policy, decision queue,
|
||||
office-hour rhythm, and control loops are in force so work does not
|
||||
depend on ad-hoc founder memory (binky-control S2).
|
||||
|
||||
### Unattended progress
|
||||
|
||||
- [ ] **G3 — Dogfood loop closed.** At least one end-to-end internal loop runs
|
||||
unattended under Green/Blue policy and produces auditable progress
|
||||
without founder mid-flight steering (S3).
|
||||
- [ ] **G4 — Founder load within budget.** Measured over a sustained window
|
||||
(recommended: ≥30 calendar days), CEO time stays within the 1–3 h/day +
|
||||
~2 office-hour days/month envelope for routine company ops, with Red-lane
|
||||
exceptions logged rather than becoming the default.
|
||||
|
||||
### Profitability
|
||||
|
||||
- [ ] **G5 — External offer published.** At least one concrete offer is public
|
||||
and sellable (S4).
|
||||
- [ ] **G6 — First paid revenue.** At least one external customer payment is
|
||||
received and booked (S5).
|
||||
- [ ] **G7 — Repeatable path.** A productized service or software-supported
|
||||
delivery path exists with unit economics that can cover run costs without
|
||||
perpetual founder heroics (S6–S7 directionally; full multi-customer scale
|
||||
is residual to durable product repos).
|
||||
|
||||
### Governance minimum
|
||||
|
||||
- [ ] **G8 — Decision surface is thin.** Outstanding Yellow/Orange items are
|
||||
packaged; Red items are few and explicit; no material company work is
|
||||
blocked solely because "nobody asked Bernd."
|
||||
- [ ] **G9 — Residuals owned outside this project.** Every unfinished
|
||||
obligation has a live work record in a permanent repo (or cancelled with
|
||||
rationale).
|
||||
|
||||
## Non-goals (this project)
|
||||
|
||||
- Becoming a permanent portfolio database or second company canon (that is
|
||||
`binky-control` and durable product repos).
|
||||
- Hosting production services, SaaS deployables, or customer data.
|
||||
- Renaming to Operational Knowledge GmbH or pursuing ok.com-level brand
|
||||
outcomes (those are later milestones beyond this project's gates).
|
||||
- Maximizing agent activity for its own sake without revenue or load reduction.
|
||||
|
||||
## Project retirement
|
||||
|
||||
This repository is temporary. It may be completed and archived when:
|
||||
|
||||
1. every success gate above has accepted evidence;
|
||||
2. residuals have live owners and work records outside this repository;
|
||||
3. durable operating policies, offers, and architecture decisions are promoted
|
||||
into permanent homes (`binky-control`, product repos, or canon);
|
||||
4. project workplans are finished, cancelled with rationale, or handed off;
|
||||
5. a completion record exists under `history/` listing evidence, participating
|
||||
repos, promoted artefacts, and remaining operational obligations;
|
||||
6. `project_status` is set to `completed` then `archived`, and the forge copy
|
||||
is made read-only.
|
||||
|
||||
Retirement means archival, not deletion. The repository remains the provenance
|
||||
record for how the unattended-progress company model was established.
|
||||