Complete UPC-WP-0001 foundation: gate map, inventory, next WPs.
Deliver G1–G9 gate-to-evidence and child-workplan maps, baseline inventory from binky-control, and proposed UPC-WP-0002–0004 for vessel, load, and revenue clusters. Mark foundation finished with DoD-Ok.
This commit is contained in:
parent
c74fec94a6
commit
0fb5c7a8b5
8 changed files with 509 additions and 54 deletions
|
|
@ -4,16 +4,20 @@ type: workplan
|
|||
title: "Project foundation and gate map"
|
||||
domain: infotech
|
||||
repo: prj-unattended-progress-company
|
||||
status: active
|
||||
status: finished
|
||||
owner: bernd
|
||||
topic_slug: infotech
|
||||
repo_goal_id: "79a2b057-b765-47ad-b5d9-c1bbc49eba43"
|
||||
created: "2026-08-09"
|
||||
updated: "2026-08-09"
|
||||
updated: "2026-08-11"
|
||||
quality_dor: DoR-Ok
|
||||
quality_dor_at: "2026-08-09"
|
||||
quality_dor_by: "grok"
|
||||
quality_dor_note: "Foundation plan maps GOAL.md gates G1–G9 to evidence and child repos; no production code in this WP."
|
||||
quality_dod: DoD-Ok
|
||||
quality_dod_at: "2026-08-11"
|
||||
quality_dod_by: "grok"
|
||||
quality_dod_note: "Gate map, baseline inventory, child map, and three next UPC-WP drafts (0002–0004) delivered; residuals are live proposed workplans."
|
||||
state_hub_workstream_id: "8dad7f23-9b0a-4b0e-9dfb-c59ae6d9c86f"
|
||||
---
|
||||
|
||||
|
|
@ -66,96 +70,73 @@ the active repo goal from `GOAL.md`.
|
|||
|
||||
```task
|
||||
id: UPC-WP-0001-T02
|
||||
status: todo
|
||||
status: done
|
||||
priority: high
|
||||
state_hub_task_id: "dee415cd-7eb0-4698-98bb-e1d437c27d2e"
|
||||
```
|
||||
|
||||
Produce `architecture/gate-map.md` (or `inventory/gate-map.yaml` if more
|
||||
machine-friendly) covering every success gate G1–G9:
|
||||
machine-friendly) covering every success gate G1–G9.
|
||||
|
||||
| Column | Content |
|
||||
| --- | --- |
|
||||
| Gate | G1…G9 id + short title from `GOAL.md` |
|
||||
| Owning repo(s) | Where implementation and evidence live |
|
||||
| Known child workplans / loops | Stable IDs only (e.g. BINKY-WP-*) |
|
||||
| Evidence path or missing | File/URL or `missing` |
|
||||
| Status | `open` / `partial` / `met` |
|
||||
| Blockers | Human-only / external / dependency |
|
||||
|
||||
Do not copy task lists from child repos. Link by ID only.
|
||||
**Result (2026-08-11):** `architecture/gate-map.md` — G1–G9 with owners,
|
||||
child IDs, evidence pointers, status (`open`/`partial`/`met`), blockers, and
|
||||
cluster sequencing (vessel / unattended+load / revenue / governance).
|
||||
|
||||
## Inventory current company state against G1–G9
|
||||
|
||||
```task
|
||||
id: UPC-WP-0001-T03
|
||||
status: todo
|
||||
status: done
|
||||
priority: high
|
||||
state_hub_task_id: "34155b30-2ebb-4093-9bed-2d6f590072c2"
|
||||
```
|
||||
|
||||
From `binky-control` (and only other repos when the gate demands it), write a
|
||||
baseline snapshot under `inventory/`:
|
||||
baseline snapshot under `inventory/`.
|
||||
|
||||
- Admin / legal / tax / banking posture (G1)
|
||||
- Company OS artefacts in force (G2)
|
||||
- Autopilot / dogfood / executor evidence (G3)
|
||||
- Founder-load measurement approach or gap (G4)
|
||||
- Offer and revenue path status (G5–G7)
|
||||
- Decision / office-hour queue thinness (G8)
|
||||
|
||||
Prefer pointers into existing `binky-control` docs
|
||||
(`CompanyReactivationPlan.md`, `SuccessMilestones.md`, workplans
|
||||
BINKY-WP-0001…0007, audits) over rewriting canon here.
|
||||
**Result (2026-08-11):** `inventory/baseline-g1-g9.md` — G1 partial (OH batch);
|
||||
G2 near met; G3 strong/partial; G4 open (no measurement); G5–G7 open (offer
|
||||
drafted only); G8 partial; G9 endgame. Top leverage: drain OH batch, then
|
||||
publish offer, measure load, package G3 acceptance.
|
||||
|
||||
## Establish the child-workplan map
|
||||
|
||||
```task
|
||||
id: UPC-WP-0001-T04
|
||||
status: todo
|
||||
status: done
|
||||
priority: high
|
||||
state_hub_task_id: "26017f0a-9df9-4994-9c2b-fd1963ed460e"
|
||||
```
|
||||
|
||||
Create `architecture/child-workplan-map.md` listing:
|
||||
Create `architecture/child-workplan-map.md` listing existing children, gaps,
|
||||
and recommended next streams.
|
||||
|
||||
1. **Existing** child workplans that already advance G1–G9 (status + gate
|
||||
tags).
|
||||
2. **Gaps** — gates with no live child workplan or residual.
|
||||
3. **Recommended next child streams** (one line each; create files only in
|
||||
the owning repo, not here).
|
||||
|
||||
Initial known participants: `binky-control`, `ops-warden`, ecosystem pillars
|
||||
as referenced by offers/delivery. Update `SCOPE.md` participating table if
|
||||
the map adds repos.
|
||||
**Result (2026-08-11):** `architecture/child-workplan-map.md` — BINKY-WP-0001…0007
|
||||
mapped to gates; OH/AWQ live surfaces; gaps for vessel close-out WP, G4 metric,
|
||||
offer publish, G3 acceptance pack. SCOPE participating table unchanged.
|
||||
|
||||
## Scope the next project coordination workplans
|
||||
|
||||
```task
|
||||
id: UPC-WP-0001-T05
|
||||
status: todo
|
||||
status: done
|
||||
priority: medium
|
||||
state_hub_task_id: "29f71041-ca6a-4e39-8090-aa59fa1d93d2"
|
||||
```
|
||||
|
||||
Based on T02–T04, draft (as `proposed` files under `workplans/`, or as a
|
||||
single sequencing note if one cluster dominates) the next `UPC-WP-*` plans
|
||||
for open gate clusters, for example:
|
||||
Based on T02–T04, draft the next `UPC-WP-*` plans for open gate clusters.
|
||||
|
||||
- Company vessel close-out (G1–G2 residuals)
|
||||
- Unattended dogfood + load envelope (G3–G4)
|
||||
- First external offer and paid revenue (G5–G6)
|
||||
**Result (2026-08-11):** Live proposed workplans (residuals of this foundation):
|
||||
|
||||
Each draft must name the parent repo goal, linked child IDs, and acceptance
|
||||
evidence expected back into this project — still without owning production
|
||||
implementation.
|
||||
| ID | Cluster | Status |
|
||||
| --- | --- | --- |
|
||||
| UPC-WP-0002 | Company vessel close-out (G1 + residual G2/G8) | proposed |
|
||||
| UPC-WP-0003 | Unattended dogfood + founder-load (G3–G4) | proposed |
|
||||
| UPC-WP-0004 | First offer and paid revenue (G5–G6) | proposed |
|
||||
|
||||
## Done when
|
||||
|
||||
- T01 remains done and hub/file IDs stay consistent after `statehub
|
||||
fix-consistency`.
|
||||
- Gate map, baseline inventory, and child-workplan map exist and cover G1–G9.
|
||||
- At least one next `UPC-WP-*` (or explicit sequencing decision) is ready for
|
||||
review so foundation can finish without leaving an unowned vacuum.
|
||||
- Residuals from this workplan are live work records (next WPs or intakes),
|
||||
not prose-only leftovers.
|
||||
- [x] T01 done; hub/file IDs consistent after fix-consistency.
|
||||
- [x] Gate map, baseline inventory, and child-workplan map cover G1–G9.
|
||||
- [x] Next UPC-WP-* drafted so foundation leaves no unowned vacuum.
|
||||
- [x] Residuals are live workplans (0002–0004), not prose-only leftovers.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue