Complete UPC-WP-0001 foundation: gate map, inventory, next WPs.
Deliver G1–G9 gate-to-evidence and child-workplan maps, baseline inventory from binky-control, and proposed UPC-WP-0002–0004 for vessel, load, and revenue clusters. Mark foundation finished with DoD-Ok.
This commit is contained in:
parent
c74fec94a6
commit
0fb5c7a8b5
8 changed files with 509 additions and 54 deletions
107
workplans/UPC-WP-0002-company-vessel-closeout.md
Normal file
107
workplans/UPC-WP-0002-company-vessel-closeout.md
Normal file
|
|
@ -0,0 +1,107 @@
|
|||
---
|
||||
id: UPC-WP-0002
|
||||
type: workplan
|
||||
title: "Company vessel close-out (G1 + residual G2/G8)"
|
||||
domain: infotech
|
||||
repo: prj-unattended-progress-company
|
||||
status: proposed
|
||||
owner: bernd
|
||||
topic_slug: infotech
|
||||
repo_goal_id: "79a2b057-b765-47ad-b5d9-c1bbc49eba43"
|
||||
created: "2026-08-11"
|
||||
updated: "2026-08-11"
|
||||
quality_dor: DoR-Ok
|
||||
quality_dor_at: "2026-08-11"
|
||||
quality_dor_by: "grok"
|
||||
quality_dor_note: "Coordinates G1 OH drain and evidence only; no production code; Orange/Red work stays human or batched."
|
||||
---
|
||||
|
||||
# Company vessel close-out (G1 + residual G2/G8)
|
||||
|
||||
## Goal
|
||||
|
||||
Drive **G1 (administratively clean)** to met or clearly residual-owned, and
|
||||
shrink the Orange decision surface (**G8**) by completing the prepared
|
||||
office-hour batch in `binky-control`.
|
||||
|
||||
Parent repo goal: `79a2b057-b765-47ad-b5d9-c1bbc49eba43`
|
||||
Baseline: `inventory/baseline-g1-g9.md`, `architecture/gate-map.md`.
|
||||
|
||||
This workplan **coordinates and records evidence**. Founder executes Red/Orange
|
||||
actions; agents prepare packages and update maps.
|
||||
|
||||
## Linked child records (do not duplicate tasks)
|
||||
|
||||
| Record | Repo | Role |
|
||||
| --- | --- | --- |
|
||||
| OH-2026-001 | binky-control | StB mandate JA 2025+ |
|
||||
| OH-2026-002 | binky-control | DUO backlog / license transition |
|
||||
| OH-2026-003 | binky-control | Qonto cost/access review |
|
||||
| OH-2026-004 | binky-control | Handelsregister / address / purpose verify |
|
||||
| OH-2026-005 | binky-control | Stripe stale webhook cleanup |
|
||||
| CompanyReactivationPlan.md Phase 1 | binky-control | Checklist authority |
|
||||
| SuccessMilestones.md S1 | binky-control | Founder milestone mark |
|
||||
| Optional BINKY-WP-0008 | binky-control | Only if OH campaign needs a durable WP shell |
|
||||
|
||||
## Track OH batch completion in project evidence
|
||||
|
||||
```task
|
||||
id: UPC-WP-0002-T01
|
||||
status: todo
|
||||
priority: high
|
||||
```
|
||||
|
||||
For each of OH-2026-001…005, record in `evidence/g1-oh-batch.md` (create when
|
||||
first item moves): id, date closed or deferred, outcome pointer into
|
||||
`binky-control`, residual if any (`origin: residual`). Do not copy OH body
|
||||
text.
|
||||
|
||||
## Keep gate map and Reactivation checklist aligned
|
||||
|
||||
```task
|
||||
id: UPC-WP-0002-T02
|
||||
status: todo
|
||||
priority: high
|
||||
```
|
||||
|
||||
After each OH close (or weekly), update `architecture/gate-map.md` G1/G8 rows
|
||||
and confirm `binky-control/CompanyReactivationPlan.md` Phase 1 checkboxes
|
||||
match evidence. Flag any Red-lane residual explicitly.
|
||||
|
||||
## Request S1 milestone update when vessel is clean enough
|
||||
|
||||
```task
|
||||
id: UPC-WP-0002-T03
|
||||
status: todo
|
||||
priority: medium
|
||||
```
|
||||
|
||||
When G1 evidence supports “administratively clean,” prepare a Yellow decision
|
||||
package for founder to mark S1 in `SuccessMilestones.md` (or document residual
|
||||
exceptions). Link package id from this project.
|
||||
|
||||
## Hand off non-G1 residuals
|
||||
|
||||
```task
|
||||
id: UPC-WP-0002-T04
|
||||
status: todo
|
||||
priority: medium
|
||||
```
|
||||
|
||||
Anything remaining after vessel close-out that is not G1 (domain inventory
|
||||
AWQ-003, ecosystem cartography, etc.) must become a live residual in
|
||||
`binky-control` or a later UPC-WP — not prose-only in this WP.
|
||||
|
||||
## Acceptance evidence expected back here
|
||||
|
||||
- `evidence/g1-oh-batch.md` with all five OH items closed or residual-owned
|
||||
- Updated gate-map G1 status (`met` or `partial` with explicit residuals)
|
||||
- Pointer to S1 decision or residual exceptions
|
||||
- No open “ask Bernd because unsure” items for Phase 1 admin — only packaged
|
||||
Red/Orange leftovers
|
||||
|
||||
## Out of scope
|
||||
|
||||
- Publishing the OK Audit offer (→ UPC-WP-0004 / binky Yellow package)
|
||||
- Founder-load 30-day measurement (→ UPC-WP-0003)
|
||||
- Production code or secret handling in this repo
|
||||