From 9c7caf507605186a2603e9333fb220b8596fcbe6 Mon Sep 17 00:00:00 2001 From: tegwick Date: Tue, 29 Sep 2026 00:00:25 +0200 Subject: [PATCH] Record DEC-2026-006 approval in G5 tracker, UPC-WP-0004, gate map Co-Authored-By: Claude Sonnet 5.5 Assistant: claude-code Assistant-Model: sonnet Assistant-Process: 293620@bnt-lap001 Assistant-Session: 50ae9ffb-1cc3-48ec-8cfe-1941bcf2f2fb --- architecture/gate-map.md | 2 +- evidence/g5-publish.md | 2 +- workplans/UPC-WP-0004-first-offer-and-revenue.md | 4 ++-- 3 files changed, 4 insertions(+), 4 deletions(-) diff --git a/architecture/gate-map.md b/architecture/gate-map.md index 4b45eb4..6e73235 100644 --- a/architecture/gate-map.md +++ b/architecture/gate-map.md @@ -22,7 +22,7 @@ Status vocabulary: `open` | `partial` | `met`. | **G2** | Company OS active | `binky-control` | BINKY-WP-0001…0003 (done); OperatingRhythm; DecisionQueue; OfficeHourQueue; AutopilotWorkQueue; ControlLoopCatalog | `INTENT.md` v1.0 ratified DEC-2026-001; `AutonomyPolicy.md`; daily briefs through 2026-08-08; queues live | **partial** → near met | Policy “in force” is operationally true; formal checklist still marks some governance boxes open in Reactivation Plan | | **G3** | Dogfood loop closed | `binky-control`, Railiance/`activity-core`/`llm-connect` | BINKY-WP-0003…0006 (finished); REIN-A-0003 weekly review | OK-Audit v0 dogfood; rhythm on Railiance without host coding agent; ops_run `ad0b05c4-…` weekly review proof 2026-08-08 | **partial** → strong | Evidence pack now at `evidence/g3-dogfood-acceptance.md` (2026-09-28); rhythm output pushed and timers re-enabled 2026-09-28; await a few clean days, then S3 request; S3 still ⬜ (founder) | | **G4** | Founder load within budget | `binky-control` (measure), this project (gate evidence) | *none dedicated* | Design draft `architecture/founder-load-measurement.md` (2026-09-28); log `binky-control/briefs/load-log.csv`, owner AWQ-014 (no entries yet) | **open** | Design + measure load; requires definition of what counts as “routine company ops” vs Red exceptions | -| **G5** | External offer published | `binky-control` (+ website/domain as needed) | BINKY-WP-0002-T04 (draft done); OfferCatalog flagship | `OfferCatalog.md` — OK Audit **drafted**, publish decision package DEC-2026-006 prepared, awaiting founder (`evidence/g5-publish.md`) | **open** | Yellow decision to publish; domain/website residual (AWQ-003, Reactivation digital presence) | +| **G5** | External offer published | `binky-control` (+ website/domain as needed) | BINKY-WP-0002-T04 (draft done); OfferCatalog flagship | `OfferCatalog.md` — OK Audit **drafted**, DEC-2026-006 approved 2026-09-28 (preparation only) (`evidence/g5-publish.md`) | **open** | Yellow decision to publish; domain/website residual (AWQ-003, Reactivation digital presence) | | **G6** | First paid revenue | `binky-control`, finance path | BINKY-WP-0005/0007 (Qonto read path finished) | Qonto evidence of costs/credits; Binect-related credit noted — **no booked external product/service sale** | **open** | Depends on G5 + delivery; Red for contracts/payment setup if needed | | **G7** | Repeatable path | product/service repos after first delivery | *gap* | **missing** unit economics / productized delivery after first sale | **open** | Premature until G5–G6; residual to durable product repos | | **G8** | Decision surface thin | `binky-control` | DecisionQueue hygiene; OH batching; AutonomyPolicy lanes; UPC-WP-0002 | OH: 5 prepared (all five now with usable `prepared_material` — OH-2026-004 gap closed 2026-08-16), tracked in `evidence/g1-oh-batch.md`; surface is packaged not ad-hoc | **partial** | Thinness waits on G1 OH drain (command day) | diff --git a/evidence/g5-publish.md b/evidence/g5-publish.md index 624f572..8c519de 100644 --- a/evidence/g5-publish.md +++ b/evidence/g5-publish.md @@ -11,7 +11,7 @@ as_of: "2026-09-28" | Item | Pointer | Status | | --- | --- | --- | -| Yellow decision package | `binky-control/DecisionQueue.md` **DEC-2026-006** | prepared, awaiting founder | +| Yellow decision package | `binky-control/DecisionQueue.md` **DEC-2026-006** | **resolved 2026-09-28: approved as recommended** (1.500 EUR pilot; solo founders / small GmbHs; own-domain one-pager + outreach). Preparation only | | Offer definition | `binky-control/OfferCatalog.md` (flagship, `drafted`) | drafted | | Website copy | `binky-control/website/one-pager-draft.md` | draft, no public pricing | | Public page / equivalent | — | not live | diff --git a/workplans/UPC-WP-0004-first-offer-and-revenue.md b/workplans/UPC-WP-0004-first-offer-and-revenue.md index 0ffed8f..772ecd7 100644 --- a/workplans/UPC-WP-0004-first-offer-and-revenue.md +++ b/workplans/UPC-WP-0004-first-offer-and-revenue.md @@ -71,8 +71,8 @@ durable repo residual. **T01 done (2026-09-28):** DEC-2026-006 prepared in binky-control; tracker `evidence/g5-publish.md`. -**Blocked (2026-09-28):** T02/T03 wait on the founder's DEC-2026-006 and the -publish gates (IP, domain, Impressum, G1 via UPC-WP-0002). +**Blocked (2026-09-28):** DEC-2026-006 was **approved as recommended** on 2026-09-28 (preparation +only). T02/T03 now wait only on the publish gates (IP, domain, Impressum, G1 via UPC-WP-0002). ## Acceptance