--- id: UPC-INV-0001 type: inventory repo: prj-unattended-progress-company parent_workplan: UPC-WP-0001 created: "2026-08-11" as_of: "2026-08-11" --- # Baseline inventory — company state vs G1–G9 Snapshot of Binky Hedgehog GmbH operating state for the unattended-progress project. Prefer **pointers** into `binky-control` over rewriting canon. Source root: `/home/worsch/binky-control` (hub slug `binky-control`). ## G1 — Administratively clean (S1 / Phase 1) | Area | Snapshot | Pointer | | --- | --- | --- | | Legal vessel | Exists since 2019 (S0 done) | `SuccessMilestones.md` S0 | | Handelsregister / address / purpose | **Verify pending** (OH prepared) | `OfficeHourQueue.md` OH-2026-004; `CompanyReactivationPlan.md` Legal | | StB mandate JA 2025+ | **In progress** — inquiry Bohle-Horsmann; follow-up prepared | OH-2026-001; RISK-006 | | Filings history | Current through JA 2024 | Reactivation Plan Tax checklist | | Bookkeeping / DATEV DUO | Transition + receipt backlog open | OH-2026-002; RISK-007 | | Banking | Qonto **active**; cost/access review prepared | OH-2026-003; BINKY-WP-0005 evidence | | Cost / run-rate | Table v2 with Qonto-verified rows | `finance/CostRunRate.md`, `finance/qonto-first-pull-2026-07-21.json` | | Domains / email | `binky-hedgehog.com` owned; company email exists; NK/OpenBao integration residual | AWQ-003, AWQ-007 history; Reactivation digital presence | | Website | Minimal public page **missing** | Reactivation digital presence | | Contracts / IP ownership | Inventory incomplete; needed before selling ecosystem products | Reactivation Contracts & IP | **Verdict:** **partial**. Orange-lane OH batch is the main G1 execution path. ## G2 — Company OS active (S2) | Artefact | State | Pointer | | --- | --- | --- | | Company canon | **v1.0 ratified** 2026-07-16 (DEC-2026-001) | `INTENT.md`, DecisionQueue | | Autonomy policy | Present; lanes used in queues/WPs | `AutonomyPolicy.md` | | Decision queue | Live; recent decisions resolved | `DecisionQueue.md` | | Office-hour queue | Live; 5 prepared items | `OfficeHourQueue.md` | | Autopilot queue | Live; high-leverage items largely closed/promoted | `AutopilotWorkQueue.md` | | Operating rhythm | Daily brief + queue hygiene defined; briefs through early Aug 2026 | `OperatingRhythm.md`, `briefs/` | | Control loops / dogfood policy | Present | `ControlLoopCatalog.md`, `DogfoodPolicy.md` | | State Hub integration | Bootstrap done | BINKY-WP-0001 | **Verdict:** **partial → near met** operationally. Reactivation Plan still lists some governance checkboxes open; treat as checklist lag vs lived OS. ## G3 — Dogfood loop closed (S3) | Loop | State | Pointer | | --- | --- | --- | | OK Audit dogfood | v0 run on Binky 2026-07-16 | `audits/OK-Audit-v0-binky.md` | | Autopilot + rhythm | WPs 0003 finished | BINKY-WP-0003 | | Workstation-independent executor | Finished 2026-07-21 | BINKY-WP-0004 | | Railiance llm-connect rhythm (no host coding agent) | Finished | BINKY-WP-0006 | | Weekly founder review via llm-connect | Production proof 2026-08-08 | AWQ-011 → REIN-A-0003; ops_run `ad0b05c4-8ad8-40c7-9985-75481728ae30` | | Qonto as agent-readable finance | Integration finished | BINKY-WP-0005, BINKY-WP-0007 | **Verdict:** **partial / strong**. Unattended loops exist with evidence; S3 milestone not yet founder-marked; project still needs a single acceptance evidence pack under `evidence/` when claiming G3 met. ## G4 — Founder load within budget | Item | State | | --- | --- | | Target envelope | 1–3 h/day outside business hours + ~2 OH days/month (`GOAL.md`, `INTENT.md`) | | Measurement | **Gap** — no sustained time log or automated load KPI for ≥30 days | | Qualitative signal | Office-hour batching and decision packaging reduce random interrupts; load not proven | **Verdict:** **open**. ## G5–G7 — Profitability path | Gate | State | Pointer | | --- | --- | --- | | G5 Offer published | Flagship **Operational Knowledge Audit** drafted; status `drafted` — publish is Yellow | `OfferCatalog.md` | | G6 First paid revenue | No booked external sale of the offer; incidental/sublet credits ≠ product revenue | CostRunRate “Known recurring income” | | G7 Repeatable path | Not started as productized delivery | — | **Verdict:** G5–G7 **open**; G5 is the immediate commercial unlock after G1 OH drain and publish decision. ## G8 — Decision surface thin | Queue | Open surface (as of scan) | | --- | --- | | DecisionQueue | Template allows prepared/resolved/deferred; recent structured decisions resolved | | OfficeHourQueue | **5 prepared** (StB, DUO, Qonto, Handelsregister, Stripe webhook) — correctly Orange-batched | | AutopilotWorkQueue | Optional/open residuals: AWQ-012, AWQ-002, AWQ-003, AWQ-006 (low urgency cartography/domain) | **Verdict:** **partial**. Surface is packaged (not ad-hoc), but G1 OH load means the company is not yet “thin” on founder business-hour demand. ## G9 — Residuals owned outside project Not claimable until project retirement. Residual **pattern** is already established in `binky-control` (AWQ intakes with `origin: residual` + `origin_ref`). Each finishing UPC-WP must hand residuals as live records. ## Top leverage (baseline conclusion) 1. **Drain prepared OH batch (G1 / G8)** — highest leverage for vessel clean + thinner founder surface. 2. **Yellow decision: publish OK Audit offer (G5)** — once vessel is credible. 3. **Define G4 measurement** — so “minimal CEO time” is evidence, not aspiration. 4. **Package G3 acceptance** — declare S3 with linked ops_run/audit evidence.