--- id: UPC-WP-0002 type: workplan title: "Company vessel close-out (G1 + residual G2/G8)" domain: infotech repo: prj-unattended-progress-company status: active owner: bernd topic_slug: infotech repo_goal_id: "79a2b057-b765-47ad-b5d9-c1bbc49eba43" created: "2026-08-11" updated: "2026-08-16" quality_dor: DoR-Ok quality_dor_at: "2026-08-11" quality_dor_by: "grok" quality_dor_note: "Coordinates G1 OH drain and evidence only; no production code; Orange/Red work stays human or batched." state_hub_workstream_id: "8d47ba5f-0608-5f83-8b4b-7dee53ada6f6" --- # Company vessel close-out (G1 + residual G2/G8) ## Goal Drive **G1 (administratively clean)** to met or clearly residual-owned, and shrink the Orange decision surface (**G8**) by completing the prepared office-hour batch in `binky-control`. Parent repo goal: `79a2b057-b765-47ad-b5d9-c1bbc49eba43` Baseline: `inventory/baseline-g1-g9.md`, `architecture/gate-map.md`. This workplan **coordinates and records evidence**. Founder executes Red/Orange actions; agents prepare packages and update maps. ## Linked child records (do not duplicate tasks) | Record | Repo | Role | | --- | --- | --- | | OH-2026-001 | binky-control | StB mandate JA 2025+ | | OH-2026-002 | binky-control | DUO backlog / license transition | | OH-2026-003 | binky-control | Qonto cost/access review | | OH-2026-004 | binky-control | Handelsregister / address / purpose verify | | OH-2026-005 | binky-control | Stripe stale webhook cleanup | | CompanyReactivationPlan.md Phase 1 | binky-control | Checklist authority | | SuccessMilestones.md S1 | binky-control | Founder milestone mark | | Optional BINKY-WP-0008 | binky-control | Only if OH campaign needs a durable WP shell | ## Track OH batch completion in project evidence ```task id: UPC-WP-0002-T01 status: progress priority: high state_hub_task_id: "ab714cd3-9457-5386-8b3c-056702c234e4" ``` For each of OH-2026-001…005, record in `evidence/g1-oh-batch.md` (create when first item moves): id, date closed or deferred, outcome pointer into `binky-control`, residual if any (`origin: residual`). Do not copy OH body text. **Progress (2026-08-12):** Tracker created at `evidence/g1-oh-batch.md` with preflight for all five items (still 0/5 closed). Linked command-day runbook `binky-control/officehour/2026-08-command-day-runbook.md`. Update rows as OH items close in binky-control. **Progress (2026-08-16):** Verified against binky-control — all five OH items still `prepared`, no commits there since 2026-08-08, so the planned command-day window (first half of August) lapsed with 0/5 drained. Tracker refreshed to record the slip explicitly rather than letting a stale date imply progress. Closed the batch's one prep gap: **OH-2026-004 `prepared_material` was `[]` and is now filled** — free handelsregister.de retrieval path (no paid reseller), the four fields to verify, the `2binky/` filing rule keeping personal data out of repo evidence, and the explicit Orange/Red boundary (reading is Orange, any notary-lane change is Red and must not be started on the day). All five items now have usable prep; batch is founder-blocked, not preparation-blocked. **Progress (2026-08-16, later):** Founder scheduled the command day for **Sunday 2026-08-16 afternoon**. Runbook rescheduled and resequenced for a Sunday: the Bohle-Horsmann office is closed, so OH-2026-001 loses its phone option and becomes an *email dispatched first* (to land Monday morning) rather than an item that closes on the day. Expected result is **4/5 closed + 001 awaiting reply**, RISK-006 to “awaiting counterparty” rather than mitigated, with a Tue 2026-08-18 follow-up slot for call-or-fallback. OH-2026-005 was missing from the runbook's must-do list and has been added. ## Keep gate map and Reactivation checklist aligned ```task id: UPC-WP-0002-T02 status: progress priority: high state_hub_task_id: "0d10e613-a92e-5f3a-8152-d24e25c8aeae" ``` After each OH close (or weekly), update `architecture/gate-map.md` G1/G8 rows and confirm `binky-control/CompanyReactivationPlan.md` Phase 1 checkboxes match evidence. Flag any Red-lane residual explicitly. **Progress (2026-08-12):** Gate map G1/G8 evidence column points at `evidence/g1-oh-batch.md` and active UPC-WP-0002. Full Reactivation checklist sync waits on first OH closes. ## Request S1 milestone update when vessel is clean enough ```task id: UPC-WP-0002-T03 status: progress priority: medium state_hub_task_id: "ac7e4972-d6bc-5e35-b34e-c51bfbcedf2b" ``` When G1 evidence supports “administratively clean,” prepare a Yellow decision package for founder to mark S1 in `SuccessMilestones.md` (or document residual exceptions). Link package id from this project. **Progress (2026-08-16):** Package drafted at `evidence/s1-decision-package.md` (`UPC-EVID-S1-PKG-0001`, status `draft`). Structure is complete — decision question, three named options, evidence table keyed to the five OH ids, and the gate rule that OH-2026-005 (Stripe hygiene) is not a G1 blocker while 001–004 are. Only the verdict cells are empty; they fill from `evidence/g1-oh-batch.md` once the command day runs. Deliberately **not** presented to the founder yet — a decision package with an empty evidence column is exactly the open-ended dump invariant 5 prohibits. T03 stays `progress` until the batch drains. ## Hand off non-G1 residuals ```task id: UPC-WP-0002-T04 status: progress priority: medium state_hub_task_id: "7fff1007-5283-5d3b-8408-d8a504b9542f" ``` Anything remaining after vessel close-out that is not G1 (domain inventory AWQ-003, ecosystem cartography, etc.) must become a live residual in `binky-control` or a later UPC-WP — not prose-only in this WP. **Progress (2026-08-16) — pre-close-out sweep.** Ran the ownership sweep early (it does not depend on the OH batch) against `inventory/baseline-g1-g9.md`, `architecture/gate-map.md`, and `binky-control/CompanyReactivationPlan.md`: | Non-G1 obligation | Owner | Verdict | | --- | --- | --- | | Domain inventory, cartography, Eigenentwicklung IP evidence, open-weights retarget | AWQ-003, 006, 002, 012 | Live records already ✔ | | Website / digital presence | UPC-WP-0004 (linked children) | Owned ✔ | | G4 load measurement | UPC-WP-0003 (tasks proposed, not activated) | Owned ✔ | | G3 acceptance evidence pack | UPC-WP-0003 | Owned ✔ | | **Contracts / IP ownership (GmbH vs Bernd privately)** | — | **Gap → new `AWQ-013`** | One real gap. The Reactivation Plan calls IP ownership clarification “needed before selling ecosystem products,” but it existed only as an unchecked checklist box with no work record — and it gates G5/G6, the immediate commercial move after the G1 drain. Now `binky-control` `AWQ-013` (`origin: residual`, `origin_ref: UPC-WP-0002-T04`). It is distinct from AWQ-002: that assembles IP *evidence*, this is the *determination* consuming it. Inventory table is green-lane; the allocation/transfer itself is Red (contracts, plausibly tax-relevant — worth an StB question once OH-2026-001 lands). T04 stays `progress`: the sweep is a pre-pass, and the task closes only after vessel close-out, when whatever the command day throws off is also routed. ## Acceptance evidence expected back here - `evidence/g1-oh-batch.md` with all five OH items closed or residual-owned - Updated gate-map G1 status (`met` or `partial` with explicit residuals) - Pointer to S1 decision or residual exceptions - No open “ask Bernd because unsure” items for Phase 1 admin — only packaged Red/Orange leftovers ## Out of scope - Publishing the OK Audit offer (→ UPC-WP-0004 / binky Yellow package) - Founder-load 30-day measurement (→ UPC-WP-0003) - Production code or secret handling in this repo