--- id: UPC-WP-0001 type: workplan title: "Project foundation and gate map" domain: infotech repo: prj-unattended-progress-company status: active owner: bernd topic_slug: infotech repo_goal_id: "79a2b057-b765-47ad-b5d9-c1bbc49eba43" created: "2026-08-09" updated: "2026-08-09" quality_dor: DoR-Ok quality_dor_at: "2026-08-09" quality_dor_by: "grok" quality_dor_note: "Foundation plan maps GOAL.md gates G1–G9 to evidence and child repos; no production code in this WP." --- # Project foundation and gate map ## Goal Stand up this `prj-` repository as the coordination surface for the active repo goal: make **Binky Hedgehog GmbH** a profitable, self-organizing company with minimal CEO time and governance. Deliverables of this workplan: 1. Project files and State Hub registration are complete and consistent. 2. A gate map links every `GOAL.md` success gate (G1–G9) to evidence homes and participating repos — without duplicating child task lists. 3. A child-workplan map records existing and missing implementation streams (especially in `binky-control`). 4. The next coordination workplans are scoped so unattended progress can start against open gates. Implementation remains in participating repositories. This workplan only coordinates. ## Register project and establish GOAL as hub goal ```task id: UPC-WP-0001-T01 status: done priority: high ``` Create `GOAL.md` (prj-flavor), `.repo-classification.yaml`, `SCOPE.md`, `AGENTS.md`, and genesis history. Register the repo in State Hub and create the active repo goal from `GOAL.md`. **Result (2026-08-09):** - Repo slug `prj-unattended-progress-company` registered (`01cc54ec-178d-4547-b17d-24bd97997987`), domain `infotech`, category `project`. - Active repo goal `79a2b057-b765-47ad-b5d9-c1bbc49eba43` — *Profitable self-organizing Binky Hedgehog GmbH with minimal CEO time and governance*. - Progress event recorded for registration + goal create. ## Build the gate-to-evidence map ```task id: UPC-WP-0001-T02 status: todo priority: high ``` Produce `architecture/gate-map.md` (or `inventory/gate-map.yaml` if more machine-friendly) covering every success gate G1–G9: | Column | Content | | --- | --- | | Gate | G1…G9 id + short title from `GOAL.md` | | Owning repo(s) | Where implementation and evidence live | | Known child workplans / loops | Stable IDs only (e.g. BINKY-WP-*) | | Evidence path or missing | File/URL or `missing` | | Status | `open` / `partial` / `met` | | Blockers | Human-only / external / dependency | Do not copy task lists from child repos. Link by ID only. ## Inventory current company state against G1–G9 ```task id: UPC-WP-0001-T03 status: todo priority: high ``` From `binky-control` (and only other repos when the gate demands it), write a baseline snapshot under `inventory/`: - Admin / legal / tax / banking posture (G1) - Company OS artefacts in force (G2) - Autopilot / dogfood / executor evidence (G3) - Founder-load measurement approach or gap (G4) - Offer and revenue path status (G5–G7) - Decision / office-hour queue thinness (G8) Prefer pointers into existing `binky-control` docs (`CompanyReactivationPlan.md`, `SuccessMilestones.md`, workplans BINKY-WP-0001…0007, audits) over rewriting canon here. ## Establish the child-workplan map ```task id: UPC-WP-0001-T04 status: todo priority: high ``` Create `architecture/child-workplan-map.md` listing: 1. **Existing** child workplans that already advance G1–G9 (status + gate tags). 2. **Gaps** — gates with no live child workplan or residual. 3. **Recommended next child streams** (one line each; create files only in the owning repo, not here). Initial known participants: `binky-control`, `ops-warden`, ecosystem pillars as referenced by offers/delivery. Update `SCOPE.md` participating table if the map adds repos. ## Scope the next project coordination workplans ```task id: UPC-WP-0001-T05 status: todo priority: medium ``` Based on T02–T04, draft (as `proposed` files under `workplans/`, or as a single sequencing note if one cluster dominates) the next `UPC-WP-*` plans for open gate clusters, for example: - Company vessel close-out (G1–G2 residuals) - Unattended dogfood + load envelope (G3–G4) - First external offer and paid revenue (G5–G6) Each draft must name the parent repo goal, linked child IDs, and acceptance evidence expected back into this project — still without owning production implementation. ## Done when - T01 remains done and hub/file IDs stay consistent after `statehub fix-consistency`. - Gate map, baseline inventory, and child-workplan map exist and cover G1–G9. - At least one next `UPC-WP-*` (or explicit sequencing decision) is ready for review so foundation can finish without leaving an unowned vacuum. - Residuals from this workplan are live work records (next WPs or intakes), not prose-only leftovers.