--- id: UPC-WP-0001 type: workplan title: "Project foundation and gate map" domain: infotech repo: prj-unattended-progress-company status: finished owner: bernd topic_slug: infotech repo_goal_id: "79a2b057-b765-47ad-b5d9-c1bbc49eba43" created: "2026-08-09" updated: "2026-08-11" quality_dor: DoR-Ok quality_dor_at: "2026-08-09" quality_dor_by: "grok" quality_dor_note: "Foundation plan maps GOAL.md gates G1–G9 to evidence and child repos; no production code in this WP." quality_dod: DoD-Ok quality_dod_at: "2026-08-11" quality_dod_by: "grok" quality_dod_note: "Gate map, baseline inventory, child map, and three next UPC-WP drafts (0002–0004) delivered; residuals are live proposed workplans." state_hub_workstream_id: "8dad7f23-9b0a-4b0e-9dfb-c59ae6d9c86f" --- # Project foundation and gate map ## Goal Stand up this `prj-` repository as the coordination surface for the active repo goal: make **Binky Hedgehog GmbH** a profitable, self-organizing company with minimal CEO time and governance. Deliverables of this workplan: 1. Project files and State Hub registration are complete and consistent. 2. A gate map links every `GOAL.md` success gate (G1–G9) to evidence homes and participating repos — without duplicating child task lists. 3. A child-workplan map records existing and missing implementation streams (especially in `binky-control`). 4. The next coordination workplans are scoped so unattended progress can start against open gates. Implementation remains in participating repositories. This workplan only coordinates. ## Register project and establish GOAL as hub goal ```task id: UPC-WP-0001-T01 status: done priority: high state_hub_task_id: "2bec18da-5407-4048-9238-c7998253e580" ``` Create `GOAL.md` (prj-flavor), `.repo-classification.yaml`, `SCOPE.md`, `AGENTS.md`, and genesis history. Register the repo in State Hub and create the active repo goal from `GOAL.md`. **Result (2026-08-09):** - Repo slug `prj-unattended-progress-company` registered (`01cc54ec-178d-4547-b17d-24bd97997987`), domain `infotech`, category `project`. - Active repo goal `79a2b057-b765-47ad-b5d9-c1bbc49eba43` — *Profitable self-organizing Binky Hedgehog GmbH with minimal CEO time and governance*. - Progress event recorded for registration + goal create. ## Build the gate-to-evidence map ```task id: UPC-WP-0001-T02 status: done priority: high state_hub_task_id: "dee415cd-7eb0-4698-98bb-e1d437c27d2e" ``` Produce `architecture/gate-map.md` (or `inventory/gate-map.yaml` if more machine-friendly) covering every success gate G1–G9. **Result (2026-08-11):** `architecture/gate-map.md` — G1–G9 with owners, child IDs, evidence pointers, status (`open`/`partial`/`met`), blockers, and cluster sequencing (vessel / unattended+load / revenue / governance). ## Inventory current company state against G1–G9 ```task id: UPC-WP-0001-T03 status: done priority: high state_hub_task_id: "34155b30-2ebb-4093-9bed-2d6f590072c2" ``` From `binky-control` (and only other repos when the gate demands it), write a baseline snapshot under `inventory/`. **Result (2026-08-11):** `inventory/baseline-g1-g9.md` — G1 partial (OH batch); G2 near met; G3 strong/partial; G4 open (no measurement); G5–G7 open (offer drafted only); G8 partial; G9 endgame. Top leverage: drain OH batch, then publish offer, measure load, package G3 acceptance. ## Establish the child-workplan map ```task id: UPC-WP-0001-T04 status: done priority: high state_hub_task_id: "26017f0a-9df9-4994-9c2b-fd1963ed460e" ``` Create `architecture/child-workplan-map.md` listing existing children, gaps, and recommended next streams. **Result (2026-08-11):** `architecture/child-workplan-map.md` — BINKY-WP-0001…0007 mapped to gates; OH/AWQ live surfaces; gaps for vessel close-out WP, G4 metric, offer publish, G3 acceptance pack. SCOPE participating table unchanged. ## Scope the next project coordination workplans ```task id: UPC-WP-0001-T05 status: done priority: medium state_hub_task_id: "29f71041-ca6a-4e39-8090-aa59fa1d93d2" ``` Based on T02–T04, draft the next `UPC-WP-*` plans for open gate clusters. **Result (2026-08-11):** Live proposed workplans (residuals of this foundation): | ID | Cluster | Status | | --- | --- | --- | | UPC-WP-0002 | Company vessel close-out (G1 + residual G2/G8) | proposed | | UPC-WP-0003 | Unattended dogfood + founder-load (G3–G4) | proposed | | UPC-WP-0004 | First offer and paid revenue (G5–G6) | proposed | ## Done when - [x] T01 done; hub/file IDs consistent after fix-consistency. - [x] Gate map, baseline inventory, and child-workplan map cover G1–G9. - [x] Next UPC-WP-* drafted so foundation leaves no unowned vacuum. - [x] Residuals are live workplans (0002–0004), not prose-only leftovers.