--- id: RAIL-BS-WP-0010 type: workplan title: "Weekly legacy-meter review rollout (STATE-WP-0069)" domain: financials repo: railiance-cluster status: ready owner: railiance-cluster topic_slug: railiance created: "2026-07-08" updated: "2026-07-08" state_hub_workstream_id: "d2286123-feaf-40ae-bf5e-6b620885d729" --- # Weekly legacy-meter review rollout (STATE-WP-0069) ## Context State Hub suggestion `05da5540-e7cd-41fb-a511-3c1572e4604f` (origin `weekly-legacy-meter-review-railiance-rollout`, STATE-WP-0069): deploy the `weekly-legacy-meter-review` ActivityDefinition on railiance01 so legacy-meter retirement gating receives automated weekly evidence from production activity-core. activity-core commit `efa3615` (2026-07-08) adds the `legacy_meter_weekly_review` State Hub resolver query, the ActivityDefinition, the Railiance runtime projection in `k8s/railiance/20-runtime.yaml`, and the `legacy_meter_weekly_review` progress sink. Code is merged on main; cluster reconcile is pending. **Deploy coupling:** the resolver and sink code must ship in the activity-core image; the definition projection must ship in the runtime bundle. Apply both before calling `POST /admin/sync`. This is not a ConfigMap-only change. **Prereqs:** - activity-core checkout on railiance01 at `efa3615` or later - `actcore-state-hub-bridge` reachable at `127.0.0.1:18000` (State Hub tunnel) - `kubectl` access: `export KUBECONFIG=~/.kube/config-hosteurope` **Pattern reuse:** RAIL-BS-WP-0008 revision-gated image reconcile; RAIL-BS-WP-0009 no-restart admin sync. Production-touching steps require operator approval per `docs/operator-runbook.md`. ## Reconcile activity-core image to efa3615+ ```task id: RAIL-BS-WP-0010-T01 status: todo priority: high state_hub_task_id: "d0dda77e-a236-48f9-a3ba-54c2183e848e" ``` Rebuild and import `activity-core:railiance01-prod` from activity-core main at `efa3615` or later into the railiance01 k3s containerd store. Sync the remote activity-core repo (with `.git` metadata for revision gating). Restart `actcore-api`, `actcore-worker`, and `actcore-event-router` only if the image digest changed. ## Apply runtime bundle with weekly-legacy-meter-review ```task id: RAIL-BS-WP-0010-T02 status: todo priority: high state_hub_task_id: "9b11485a-2a9d-4e45-a358-b2c7318c387f" ``` Apply `k8s/railiance/20-runtime.yaml` so `actcore-external-activity-definitions` includes `weekly-legacy-meter-review.md` with: - cron `30 8 * * 1` Europe/Berlin - context query `legacy_meter_weekly_review` (`days: 7`) - evidence sink `legacy_meter_weekly_review` linked to workplan `923bb94a-d16c-422c-b81e-16328bd7b60c` (STATE-WP-0069) ## No-restart admin sync ```task id: RAIL-BS-WP-0010-T03 status: todo priority: high state_hub_task_id: "b5906fd2-2f39-4379-af2f-8bc0f7cbeb1f" ``` After ConfigMap apply, wait ~60s for API pod volume propagation (see `activity-core/docs/runbook.md` and `scripts/smoke_admin_sync_no_restart.py`). Call `POST /admin/sync?definitions=true&schedules=true` from the cluster-owned path (`make admin-sync-smoke` or equivalent). Confirm worker pod UID and restart count are unchanged. ## Verify definition and Temporal schedule ```task id: RAIL-BS-WP-0010-T04 status: todo priority: medium state_hub_task_id: "f47e4ab2-04fc-4441-8983-f45060afcd10" ``` Confirm `weekly-legacy-meter-review` is `enabled=true` in the activity-core DB and that a Temporal schedule exists for `30 8 * * 1` Europe/Berlin. Query via the activity-core API or `actcore-api` exec. ## Manual trigger acceptance smoke ```task id: RAIL-BS-WP-0010-T05 status: todo priority: high state_hub_task_id: "7f4c3a15-75b6-48c5-9f5f-594f693a688a" ``` Manually trigger `weekly-legacy-meter-review` once (do not wait for Monday). Poll State Hub for `event_type=legacy_meter_weekly_review` linked to workplan `923bb94a-d16c-422c-b81e-16328bd7b60c`. Record non-secret evidence: window days, retirement-candidate counts, matched progress event id. Closes the functional acceptance gate for suggestion `05da5540`. ## First scheduled Monday run watch ```task id: RAIL-BS-WP-0010-T06 status: wait priority: low state_hub_task_id: "c3011200-1bfc-4da6-ac15-05702617eeeb" ``` After T05 passes, leave the schedule enabled. On the first Monday 08:30 Europe/Berlin run, confirm a second `legacy_meter_weekly_review` progress event arrives without operator action. This proves production cadence, not only manual trigger.