Close RAIL-HO-WP-0005-T02; record cutover Option A on WP-0005
Staged per-repo cutover is the official T11 mode. T02 design decisions complete.
This commit is contained in:
parent
7658c7be3a
commit
a62df364aa
1 changed files with 30 additions and 27 deletions
|
|
@ -74,9 +74,9 @@ change is made there.
|
|||
daily age-encrypted `forgejo dump` + `pg_dump` → Nextcloud WebDAV; 14 daily +
|
||||
4 weekly retention; RPO 24h / RTO 4h. Record:
|
||||
`the-custodian/docs/forgejo-production-decisions.md` § Backup.
|
||||
6. Cutover mode: ~~freeze-all vs staged~~ **LEANING staged per-repo (2026-07-04)**
|
||||
based on `glas-harness` pilot; operator confirmation still needed. Freeze-all
|
||||
remains fallback for final production wave if drift risk is unacceptable.
|
||||
6. ~~Cutover mode~~ **DECIDED 2026-07-09 (Option A):** staged per-repo promotion
|
||||
(no org-wide freeze). Freeze-all documented as emergency fallback only. Record:
|
||||
`the-custodian/docs/forgejo-production-decisions.md` § Cutover.
|
||||
|
||||
## Safety Contract
|
||||
|
||||
|
|
@ -176,34 +176,36 @@ pending before T11 wave for remaining production repos.
|
|||
|
||||
```task
|
||||
id: RAIL-HO-WP-0005-T02
|
||||
status: progress
|
||||
status: done
|
||||
priority: high
|
||||
needs_human: true
|
||||
needs_human: false
|
||||
state_hub_task_id: "f88115bf-4f99-49ef-a415-0b23750141b3"
|
||||
```
|
||||
|
||||
Decide the production choices listed in "Key Decisions to Confirm".
|
||||
|
||||
**Partial (2026-07-09):** hostname, exposure, deployment pattern, live deploy,
|
||||
in-cluster runner model (`ADR-004`), **SMTP (IONOS, T06 done)**, **package scope
|
||||
(Option C)**, and **backup target (Option A: Nextcloud + age)** decided. Cutover
|
||||
mode **leaning** staged per-repo (glas-harness pilot). Remaining operator
|
||||
decision: final cutover confirmation. See
|
||||
`the-custodian/docs/forgejo-production-decisions.md`.
|
||||
**Done (2026-07-09):** All Key Decisions recorded in
|
||||
`the-custodian/docs/forgejo-production-decisions.md`:
|
||||
|
||||
- Hostname, exposure, deployment pattern, live deploy (2026-07-03)
|
||||
- SMTP IONOS + OpenBao/ESO (T06 done 2026-07-08)
|
||||
- Package scope **Option C** (OCI + npm + generic; others as needed)
|
||||
- Actions runner in-cluster (`ADR-004`)
|
||||
- Backup **Option A** (Nextcloud + age; balanced retention)
|
||||
- Cutover **Option A** (staged per-repo; freeze-all emergency fallback only)
|
||||
|
||||
Expected output:
|
||||
|
||||
- A short decision record in this workplan or a dedicated ADR.
|
||||
- Hostname and exposure model. ✓ hostname; exposure follows railiance01 Traefik
|
||||
- A short decision record in this workplan or a dedicated ADR. ✓
|
||||
- Hostname and exposure model. ✓
|
||||
- SMTP provider and sender identity. ✓
|
||||
- Package registry scope. ✓ Option C (OCI + npm + generic; others as needed)
|
||||
- Actions runner isolation model.
|
||||
- Backup target, retention, encryption, and restore cadence. ✓ Option A
|
||||
(Nextcloud; balanced retention; implementation T04/T09)
|
||||
- Cutover strategy and rollback window.
|
||||
- Package registry scope. ✓
|
||||
- Actions runner isolation model. ✓
|
||||
- Backup target, retention, encryption, and restore cadence. ✓
|
||||
- Cutover strategy and rollback window. ✓ staged per-repo + per-repo rollback
|
||||
|
||||
**Done when:** implementation tasks are no longer blocked by open production
|
||||
choices.
|
||||
choices. **Met.**
|
||||
|
||||
---
|
||||
|
||||
|
|
@ -518,17 +520,17 @@ Execute production migration only after T06, T07, T08, T09, and T10 tier 0–2
|
|||
gates pass. `state-hub` and other Wave-1 production repos require explicit
|
||||
operator approval per `CUST-WP-0054` drain sequence.
|
||||
|
||||
**Preferred cutover (staged per-repo):**
|
||||
**Cutover mode (T02 Option A, 2026-07-09):** staged per-repo — no org-wide freeze.
|
||||
|
||||
1. Per repo: Gitea backup snapshot (or org-wide before each wave).
|
||||
1. Per repo: Gitea backup snapshot before promotion.
|
||||
2. Mirror git to Forgejo; switch workstation `origin` to `forgejo-remote`.
|
||||
3. Port/verify Actions workflows on Forgejo runner.
|
||||
4. Update State Hub `remote_url` and railiance01 sweep checkouts when promoted.
|
||||
5. Mark Gitea repo read-only (org policy); do not delete.
|
||||
6. Repeat until production set complete.
|
||||
5. Mark **that** Gitea repo read-only; do not delete.
|
||||
6. Stabilization window; repeat until production set complete.
|
||||
|
||||
**Freeze-all fallback:** single window if staged drift is unacceptable — same
|
||||
steps but all repos in one maintenance period.
|
||||
**Emergency fallback only:** org-wide freeze-all — not the primary plan; use if
|
||||
staged drift becomes unacceptable (document rollback before invoking).
|
||||
|
||||
**Done when:** all Railiance/Custodian repos use Forgejo as primary, Gitea is
|
||||
read-only fallback, and rollback instructions are documented.
|
||||
|
|
@ -581,8 +583,9 @@ T03 isolated probe: CANCELLED (superseded by T05 + in-production pilots)
|
|||
|
||||
**Current focus (2026-07-07):** T08 **done**; T10 tiers 0–2.5 **complete**, tier-3
|
||||
`state-hub` cutover **in progress** (phase 5 stabilization). T09 restore drill
|
||||
**passed**; backup **target** decided (Option A). Scheduled automation still
|
||||
open (T04/T09). T02 cutover-mode confirmation remains operator-gated. T11 partial: `state-hub` primary
|
||||
**passed**; backup target decided (Option A); T02 **done** (all design decisions).
|
||||
Scheduled backup automation still open (T04/T09). Next: tier-3 staged promotions
|
||||
(T10/T11) after backup 7-day gate. T11 partial: `state-hub` primary
|
||||
on railiance01; ~57 State Hub repos still point at Gitea remotes.
|
||||
Do not retire coulombcore `state-hub` until phase 5 closeout and operator
|
||||
signoff (`CUST-WP-0054-T05`).
|
||||
|
|
|
|||