Commit graph

2 commits

Author SHA1 Message Date
040ccccc8e WP-0005: T12 prep checklist, backup gate 4/7, doc refresh
Update workplan with Jul 9 cron success (4/7 gate, ETA Jul 12), add Gitea
retirement dependency scan and operator checklist, and align deploy-stack,
restore-drill evidence, and migration inventory with post-cutover state.
2026-07-09 10:34:44 +02:00
2d7e0101bc feat(infra): UFW k3s routing + full deploy runbook
- base role: allow UFW routing direction (required for k3s flannel
  pod networking to function across nodes)
- docs/deploy-stack.md: full S1→S5 ordered deploy runbook with
  pre-conditions checklist and layer-by-layer steps

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-27 02:28:51 +01:00