Commit graph

13 commits

Author SHA1 Message Date
fb07daef3a Record T02 package scope decision (Option C) on WP-0005
All checks were successful
CI Smoke / host-smoke (push) Successful in 3s
CI Smoke / container-smoke (push) Successful in 42s
OCI plus npm and generic at launch; PyPI/Go/Maven/Helm as inventory proves.
T07 scope updated; T02 backup and cutover decisions remain open.
2026-07-07 16:47:15 +02:00
d27bcb1a59 Mark RAIL-HO-WP-0005-T06 done after SMTP delivery verified
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 3s
IONOS mail via OpenBao/ESO and smtp.ionos.de STARTTLS confirmed with operator
test email and forgot-password delivery.
2026-07-07 16:40:12 +02:00
1cfc5d7b81 Record IONOS SMTP decision for RAIL-HO-WP-0005 T02/T06
All checks were successful
CI Smoke / host-smoke (push) Successful in 1s
CI Smoke / container-smoke (push) Successful in 2s
Operator confirmed IONOS mail for coulomb.social; update workplan gates and
point implementation to railiance-apps Forgejo mailer docs.
2026-07-07 02:04:33 +02:00
48610117c7 Update RAIL-HO-WP-0005 with Forgejo cutover progress and mark T08 done
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 2s
Sync the workplan file with State Hub (fix-consistency backing link), record
2026-07-06 state-hub tier-3 cutover evidence, refresh the Forgejo org
inventory snapshot, and close T08 now that Actions criteria are met.
2026-07-07 01:50:57 +02:00
3e992d2551 RAIL-HO-WP-0005: link tier-3 remote_url sweep playbook
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s
Playbook drafted in the-custodian; tier-3 execution still gated on state-hub
promotion and scheduled backups.
2026-07-04 13:21:41 +02:00
c664aebd1d RAIL-HO-WP-0005: record tier 2.5 railiance stack Forgejo promotion
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s
Inventory and workplan updates for enablement templates, tegwick SSH, and
railiance-* repos canonical on forgejo-remote.
2026-07-04 12:51:05 +02:00
092315895f RAIL-HO-WP-0005-T09: Forgejo backup/restore drill assets and evidence
Add isolated-namespace restore drill (CNPG cluster, PVC, orchestration script)
and document successful 2026-07-04 run: production forgejo dump restored with
health 200 and pilot repos visible via API. Scheduled backups remain open.
2026-07-04 11:26:50 +02:00
2d62317ada RAIL-HO-WP-0005-T10: tier-2 key-cape image pilot complete
Records successful key-cape Forgejo migration, image CI workflow, and
railiance01 registry pull; tiers 0-2 of migration ladder now satisfied.
2026-07-04 10:26:28 +02:00
67b259f6dc Adapt RAIL-HO-WP-0005 for production Forgejo and staged repo ladder
Reflects live railiance01 deploy, cancels isolated probe T03 in favor of
in-production pilots, marks T08/T10 progress (forgejo-actions-probe,
glas-harness), and documents tier 0-3 migration sequencing before state-hub.
2026-07-04 01:02:42 +02:00
6b0ededee2 ADR-004: Forgejo in-cluster Actions runner on railiance01
Decides long-lived runner Deployment with DinD sidecar; updates
RAIL-HO-WP-0005 runner model decision.
2026-07-03 22:29:28 +02:00
723f23d05d Normalize agent instructions and workplan frontmatter (STATE-WP-0067)
- Align agent files with on-disk workplan prefixes (infer from workplan ids)
- Set workplan domain to registered domain_slug; add topic_slug where applicable
- Repair frontmatter delimiter formatting; migrate legacy task status literals
- Regenerate AGENTS.md, CLAUDE.md, and .claude/rules from State Hub templates
2026-06-22 23:16:28 +02:00
2ad38b4a1a docs: start Forgejo migration inventory 2026-06-04 01:34:33 +02:00
dd1787f511 New workplan to migrate from gitea to forgejo 2026-05-14 14:55:28 +02:00