# ADR-0006: Reef Production Admission Date: 2026-07-26 Status: Accepted ## Context Fabric topology can say that a reef hosts a rail or binds a workload, but that does not demonstrate capacity, isolation, recoverability, or approval for a critical internet-facing service. ## Decision Rail and `rapp` bindings use explicit readiness states: `declared`, `installed`, `verified`, `production-approved`, and `deprecated`. Critical workloads require machine-readable conformance evidence plus explicit acceptance of residual risks that cannot be automated. Mixed-rail reefs use defined split triggers. The detailed contract is [`docs/reef-production-readiness-contract.md`](../reef-production-readiness-contract.md). ## Consequences - `hosts_rail` and `binds_rapp` no longer imply deployability. - `reef-railiance` may host Knative in wave 2, but Qonto cannot be called production-approved solely from that declaration. - Repeated evidence collection should become functional automation.