chore(consistency): sync task status from DB [auto]
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s

Updated by fix-consistency on 2026-10-09:
  - update .custodian-brief.md for railiance-platform

Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 469992@bnt-lap001
Assistant-Session: e4b8e420-df0a-441d-83ae-7f19130594d9
This commit is contained in:
custodian-sync 2026-10-09 11:47:32 +02:00
parent b77cb41275
commit 2b14d41d0a

View file

@ -2,19 +2,28 @@
# Custodian Brief — railiance-platform
**Domain:** financials
**Last synced:** 2026-10-08 22:32 UTC
**Last synced:** 2026-10-09 09:47 UTC
**State Hub:** http://127.0.0.1:8000 *(adjust if running on a remote machine)*
## Active Workstreams
### Coordinate audit-core temporary custody and recovery exercises
Progress: 2/4 done | workplan_id: `f4640325-e89c-591d-b58e-ec6b087900ac`
### Coordinate KeyCape live Secret exposure recovery
Progress: 4/6 done | workplan_id: `b2c25a01-4a80-55c1-90cf-8538000f7e0e`
**Open tasks:**
- ! T02 — Define the runtime database lease recovery exercise `fda4262a`
*(wait: Value-safe lease revoke/expire exercise must be coordinated with rapp-postgres and audit-core.)*
- ! T03 — Define the coordinated railiance01 reboot exercise `ba729d18`
*(wait: Single-node outage exercise needs operator access and a declared restart order coordinated with railiance-infra, railiance-cluster, audit-core and the OpenBao package owner.)*
- ! T03 — Collect exact owner acknowledgements `714ae011`
*(wait: Attended resolver run: postchecks outstanding; NetKingdom asked to package the complete sequence as one receipt-producing command for the next attended session.)*
- ! T06 — Publish the Railiance/OpenBao custody handoff `3b9748c4`
*(wait: Platform/OpenBao owner must publish the non-secret routing receipt for both lanes through the attended handoff; values are never inferred.)*
### Onboard rapp-policy-nexus to the ArgoCD production lane
Progress: 3/5 done | workplan_id: `ec41a4bd-df18-5b07-9b63-ccb80d9f001c`
**Open tasks:**
- ! Adopt policy-nexus (live, founder go-ahead) `8638fa73`
*(wait: Founder go-ahead: the merge is a live production change (CONSTRUCT @ railiance-platform, activation=APPROVED); also needs the root automation restored in RPF-WP-0044-T07.)*
- ! Prepare the Application and the dry-run evidence `2afb1aac`
*(wait: Draft is prepared. The attended read-only helm history / kubectl diff remains. This session did not touch the cluster.)*
### ArgoCD phase B: adopt the four existing Applications on railiance01
Progress: 2/8 done | workplan_id: `98140775-3b9a-5cf9-9af6-722502d487dc`
@ -40,15 +49,6 @@ Progress: 3/4 done | workplan_id: `7beec1a7-aa82-5a36-9a66-6b60008a2455`
- ! Establish primary full-archive delivery and application recovery `a4807df0`
*(wait: Operator chooses the independent archive prefix and confirms retention/caller contract and bounded worker credential delivery before the primary archive retrieval.)*
### Coordinate KeyCape live Secret exposure recovery
Progress: 4/6 done | workplan_id: `b2c25a01-4a80-55c1-90cf-8538000f7e0e`
**Open tasks:**
- ! T03 — Collect exact owner acknowledgements `714ae011`
*(wait: Attended resolver run: postchecks outstanding; NetKingdom asked to package the complete sequence as one receipt-producing command for the next attended session.)*
- ! T06 — Publish the Railiance/OpenBao custody handoff `3b9748c4`
*(wait: Platform/OpenBao owner must publish the non-secret routing receipt for both lanes through the attended handoff; values are never inferred.)*
### Close S3 service assurance and ownership gaps
Progress: 4/7 done | workplan_id: `ca639c3d-3a87-5fa4-ad13-6f2e014b0c84`
@ -67,6 +67,15 @@ Progress: 2/3 done | workplan_id: `b8cf2fc2-60c2-5d4e-a60a-55f1304d9f54`
- ! Observe adoption and enforce bounded promotion readiness `63b44949`
*(wait: 24h soak after adoption, then founder confirmation of the scoped identity and checks before automated sync; ACTIVITY-WP-0041 owns publication and the promotion guard.)*
### Coordinate audit-core temporary custody and recovery exercises
Progress: 2/4 done | workplan_id: `f4640325-e89c-591d-b58e-ec6b087900ac`
**Open tasks:**
- ! T02 — Define the runtime database lease recovery exercise `fda4262a`
*(wait: Value-safe lease revoke/expire exercise must be coordinated with rapp-postgres and audit-core.)*
- ! T03 — Define the coordinated railiance01 reboot exercise `ba729d18`
*(wait: Single-node outage exercise needs operator access and a declared restart order coordinated with railiance-infra, railiance-cluster, audit-core and the OpenBao package owner.)*
### Prepare generated attended windows and explicit value-custody choice
Progress: 3/4 done | workplan_id: `0c7e3b0c-1c36-568c-af51-b06f912a0f1d`
@ -91,15 +100,6 @@ Progress: 3/9 done | workplan_id: `975db491-5412-5e27-8e34-14a2417bb039`
- ! Founder approval of the CCR-2026-0033 custody child `7c753be6`
*(wait: Waits for founder approvals: A1 ops-mason design (keycape-secrets-engine-openbao-client-custody, MASON-WP-0009); A2 revised CCR-2026-0033 plus sibling operator reader CCR-2026-0034 (platform-owner, key-cape-owner, net-kingdom-owner reviews; bound claims confirmed for both readers incl. groups=net-kingdom-admins and /assurance/level=aal2); A3 the exact custody-child decision id recorded in the CCR-2026-0033 review (not boundary decision 632a8893). secrets-engine D1-D4 are superseded (no consumer copy).)*
### Onboard rapp-policy-nexus to the ArgoCD production lane
Progress: 3/5 done | workplan_id: `ec41a4bd-df18-5b07-9b63-ccb80d9f001c`
**Open tasks:**
- ! Adopt policy-nexus (live, founder go-ahead) `8638fa73`
*(wait: Founder go-ahead: the merge is a live production change (CONSTRUCT @ railiance-platform, activation=APPROVED); also needs the root automation restored in RPF-WP-0044-T07.)*
- ! Prepare the Application and the dry-run evidence `2afb1aac`
*(wait: Draft is prepared. The attended read-only helm history / kubectl diff remains. This session did not touch the cluster.)*
### Coordinate KeyCape live Secret exposure recovery
Progress: 4/6 done | workplan_id: `038bc3c0-4492-5b91-95eb-ae515ca205df`
@ -124,10 +124,6 @@ Progress: 2/3 done | workplan_id: `6f8a6cbc-c076-5f0a-ade2-281a7ec71360`
**Open tasks:**
- ! T03 — Complete the attended operator cutover `99f8b41f`
## Inbox Hygiene
**Missing thread_id:** 2 unread message(s) lack supersession chains.
---
## MCP Orientation (when available)