# Loose-end review — September 27, 2026 Reviewed every unfinished source workplan, terminal/archived task states, the empty unread inbox and human-needed Hub records, with current owner sources and read-only cluster evidence. No new workplan or task was created. Historical `cancelled` task statuses in the superseded baseline are terminal, not open work. Retired Hub aliases are not additional source obligations. ## Completed work - Closed RPF-WP-0027-T05 from the newer NK-WP-0033 operator ruling and attended September 23 receipt. KEY-WP-0011 already records the other credential classes. Predecessor denial remains NOT-PROVEN; the operator accepted the unavailable predecessor's disposition explicitly. Source commits and hashes are in `docs/evidence/2026-09-27-keycape-incident-owner-return.json`. No rotation was repeated. Historical custody routing still needs its complete accepted contract. - Implemented the WP-0036-T03 full-primary archive assurance adapter. It requires an ordered, hash-bound transfer/decryption/recovery chain, verified versioned download, full profile, application/database/repository/package proof and cleanup. New primary receipts preserve the archive profile. Undated historical receipts, essentials-only restores, failures and mismatched chains cannot pass. No fresh live archive receipt or recurring cadence is claimed by these fixture tests. - Completed WP-0044-T06 repository preparation: all 20 ESO CRDs receive `Prune=false,Delete=false` in the inactive draft. Chart 0.16.1 renders 39 objects; server-side diff contains exactly those 20 annotation additions and no spec changes. Evidence: `docs/evidence/2026-09-27-eso-adoption-preparation.json`. - Prepared the concrete phase C retirement sequence under WP-0044-T08 at `docs/argocd-coulombcore-retirement.md`. Live inventory still cannot finish: coulombcore SSH succeeds but Kubernetes returns Unauthorized, including with the explicit host-local k3s kubeconfig. No credential rotation or restart was attempted as a workaround. - Corrected the current index, custody incident status and stale assurance documentation. Platform accepts policy-nexus's proposed chart/values ownership split in principle; railiance-apps still must accept and publish its values path/revision. No cross-owner agreement is fabricated. ## Live observations and remaining gates `docs/evidence/2026-09-27-argocd-loose-end-status.json` records six Applications. Openbao-secretstore and target-revenue are Synced/Healthy, with September 21 healthy transition times; their original observation periods have elapsed. Their remaining promotion/owner gates now show `wait` instead of `progress`. All 25 ClusterSecretStores are Valid and issue-core-runtime is SecretSynced. Activity-core is Synced/Healthy; its required observation cannot end before September 28 at 16:06:22 Berlin. Its scoped broker/admission remains separate. Bao-notice is Healthy but OutOfSync; this review did not sync unrelated apps. `docs/evidence/2026-09-27-service-assurance.json` preserves the current observation and evaluation: 18 healthy, five missing and one stale signal. The stale receipt is the old OpenBao snapshot. Missing signals are platform-pg/platform-pg-2 restore, OpenBao restore and offsite upload/restore. The archive adapter is ready for fresh reviewed receipts; the existing undated September 6 evidence is not re-dated. Transport remains unmonitored. Q2 has a local contract and selected rapp-telemetry package; RTEL-WP-0002-T04 still owns actual mapping/delivery/absence acceptance. All eight unfinished workplans now explicitly say `blocked`; their 23 remaining tasks say `wait`. They retain the concrete unblocks in their September 27 entries. The open work is dominated by native owner acceptance, protected attended actions, fresh recovery evidence, inventory access and the time-bound observation gate. No blanket approval request, duplicate task, new schedule, credential read, backup expiration, production rollout or owner message was introduced. ## Validation The repository suite passed 418 tests with one skip before the additional three profile-propagation cases. The final focused archive suite passed all 70 tests, including those three cases. Admission matches the reviewed baseline; live metadata capture succeeds. The assurance evaluator correctly exits nonzero for the disclosed missing/stale evidence. ESO render assertions and the exact metadata-only diff passed. Commit and Repo Manager synchronization receipts are recorded in the session close progress event. The generated legacy aliases remain WP-0036-T06's scoped projection-owner dependency and are not silently repaired by changing UUIDs.