Record completed bootstrap and durable reuse-surface handoff

Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a13590-a16f-7f60-be60-fd71627bc99d
This commit is contained in:
tegwick 2026-10-13 16:16:07 +02:00
parent 7331360666
commit 4efabd60ec
5 changed files with 123 additions and 24 deletions

View file

@ -1,27 +1,28 @@
<!-- custodian-brief: generated by statehub register; fix-consistency may replace this file -->
# Custodian Brief - rapp-playwright
<!-- custodian-brief: generated by fix-consistency — do not edit manually -->
# Custodian Brief — rapp-playwright
**Project:** rapp-playwright
**Domain:** infotech
**State Hub:** http://127.0.0.1:8000
**Topic ID:** `595afc64-bd28-47bf-aafb-ba230b28371b`
**Domain:** infotech
**Last synced:** 2026-10-13 14:13 UTC
**State Hub:** http://127.0.0.1:8000 *(adjust if running on a remote machine)*
## Open Workplans
## Active Workstreams
### Bootstrap State Hub integration
### Establish intent, delivery plans and State Hub integration
Progress: 1/3 done | workplan_id: `a97c6998-4d20-5929-a9b1-8c396f679607`
Workplan file: `workplans/RAPP-PLAYWRIGHT-WP-0001-statehub-bootstrap.md`
**Open tasks:**
- ► Establish integration files and staged workplans `4f62cfc3`
- · Register, verify projection and notify reuse-surface `24dd7ac3`
Open tasks:
- T01 - Review generated integration files
- T02 - Verify local developer workflow
- T03 - Seed first real workplan
## Inbox Hygiene
## Session Start
**Stale unread:** 2 message(s) older than 3 day(s) — triage at session start.
**Missing thread_id:** 2 unread message(s) lack supersession chains.
1. Read `INTENT.md`, `SCOPE.md`, and `AGENTS.md`.
2. Check inbox: `GET /messages/?to_agent=rapp-playwright&unread_only=true`.
3. Scan `workplans/`.
4. Update task statuses in workplan files as work progresses.
---
## MCP Orientation (when available)
Last generated: 2026-10-13
If the state-hub MCP server is reachable, call:
`get_domain_summary("infotech")`
This provides richer cross-domain context.
If the MCP call fails, use this file as your orientation source.

View file

@ -61,6 +61,10 @@ is `proposed`/`todo`; bootstrap completion is not implementation completion.
An initial TAMQ update to reuse-surface was queued as
`m-dccbea4a-ac16-410e-a167-2d2dd8cc27a6`, confirming delivery ownership and planned
status. The final handoff will carry the registration and workplan references.
status. TAMQ had no active service/endpoints, so that message remains pending.
The final handoff was persisted in State Hub as
`b6a965ed-c02b-49f2-9272-c234e7c8f6a1`, with the registration, published source
and workplan references; see the [receipt](evidence/2026-10-13-reuse-surface-notification.json).
Reuse-surface remains the canonical record maintainer; no duplicate registry
entry is created here.
entry is created here. Notification persistence does not imply owner
acknowledgment or a registry edit already performed by that owner.

View file

@ -0,0 +1,62 @@
# Planning and registration evidence — 2026-10-13
## Requested boundary
Reviewed content-explorer demand, recorded the provider intent and sibling-derived
workplans, registered this repository, and notified reuse-surface. Implementation
and deployment remain future work. No browser trial was run or represented as run.
## Registration and projection
- Repository: `rapp-playwright`, UUID `23355f26-7ee1-4036-8c63-3ae78e3072bf`.
- Domain/topic: `infotech/stack`, topic UUID
`595afc64-bd28-47bf-aafb-ba230b28371b`.
- Classification: tooling; secondary domain agents. Validated against the current
custodian allowed-values file and read back from State Hub after registration.
- Forge remote: `forgejo-remote:coulomb/rapp-playwright`.
- Host observation: `bnt-lap001` → `/home/worsch/rapp-playwright`.
- Initial published planning revision: `73313606665e9c18b32d3c933b11af5e46ef856d`.
`rmgr sync --push` returned `applied`, primary/railiance01, with identical
expected and derived commits, four created plans, three resolved dependency
edges, no refused records and no unresolved edges. No local-only projection
was accepted as a substitute.
- Independent REST readback matched all four plan IDs, repository bindings and
statuses and all 13 task IDs/states against local files. The initial bootstrap
was active during this readback; final completion is synchronized separately.
## Checks
- Parsed all frontmatter and fenced task YAML; verified unique IDs and expected
repo/domain/topic values. All ten future delivery tasks remain `todo` in three
`proposed` plans.
- Validated classification without errors or warnings, checked local Markdown
links including cited sibling evidence, checked template expansion and ran
`git diff --check`.
- A separate `statehub fix-consistency --repo rapp-playwright --json` audit found
zero failures and zero automation errors. It regenerated the missing index and
refreshed the offline brief. Two standing notices were subsequently read and
acknowledged. Its generated-only commit was rejected by the local hook;
generated files are included with the substantive bootstrap completion record.
- No install/build/runtime tests apply to this planning-only checkout.
## Reuse-surface notification
Initial TAMQ message: `m-dccbea4a-ac16-410e-a167-2d2dd8cc27a6`. Inspection showed
`pending`, no active service or endpoint, and no delivery acknowledgment.
Final State Hub message: `b6a965ed-c02b-49f2-9272-c234e7c8f6a1`, from
`rapp-playwright` to `reuse-surface`. Its [persisted receipt](2026-10-13-reuse-surface-notification.json)
contains the provider references, repository UUID, proposed workplan UUIDs,
published revision and the explicit planned-only availability boundary.
The message asks reuse-surface to retain the existing capability ID and evidence
vector, attach the provider plans, and retain ownership of registry relevance
defects. Delivery to the persistent inbox is verified; owner acknowledgment and
subsequent registry edits are not claimed.
## Remaining delivery
WP-0002: contract and trial design. WP-0003: service and package implementation.
WP-0004: managed runtime and independent consumer verification, followed by an
evidence-backed discovery update. Content-explorer retains acceptance of its own
screenshot/keyboard task. These are proposed follow-on work, outside the requested
bootstrap stopping point.

View file

@ -0,0 +1,17 @@
{
"id": "b6a965ed-c02b-49f2-9272-c234e7c8f6a1",
"from_agent": "rapp-playwright",
"to_agent": "reuse-surface",
"subject": "rapp-playwright planning and State Hub bootstrap complete; service remains planned",
"body": "Provider planning is established and published at https://forgejo.coulomb.social/coulomb/rapp-playwright (planning source 73313606665e9c18b32d3c933b11af5e46ef856d). INTENT.md defines provider/consumer/platform ownership; docs/demand-and-reuse.md traces REUSE-IN-0001 and CONTENT-WP-0000-T04 and the sibling rapp conventions; SCOPE.md explicitly records planning-only availability.\n\nState Hub repository 23355f26-7ee1-4036-8c63-3ae78e3072bf is registered as tooling, infotech/stack, with Forge remote and bnt-lap001 checkout. Primary railiance01 reconciled the published revision; all 4 workplans and 13 tasks were independently read back. WP-0001 is the bootstrap; proposed WP-0002 (98fb515e-9239-57d5-9ffa-8a5c5a86ed90) defines the agent contract/trial, WP-0003 (8e662d81-cdcb-5d8c-9222-1faaa92fc307) implements the reproducible service/package, and WP-0004 (f9280c40-201e-59b5-a6f0-1aace8e0e2e2) verifies deployment and independent consumer use. See workplans/README.md.\n\nThe intended agent path includes availability/preflight, explicit remote target reachability, version-compatible Playwright/Chromium, desktop and narrow screenshots, keyboard interaction assertions, machine-readable receipts/artifact retrieval, isolation and cleanup. Transport, endpoint and versions remain contract decisions. No browser service, endpoint, client command or launch receipt exists yet. The user requested stopping after this planning/registration handoff; implementation has not begun.\n\nPlease attach these provider intent and workplan references to the existing capability.infotech.headless-browser record and REUSE-IN-0001 while preserving the evidenced D3/A2/C2/R2 source-reuse assessment. Do not create a second capability or upgrade availability from planning evidence. Content-explorer owns its task closure. Registry relevance and false-new behavior remain reuse-surface concerns. Future availability promotion requires WP-0004 runtime and consumer receipts.\n\nAn earlier TAMQ planning message m-dccbea4a-ac16-410e-a167-2d2dd8cc27a6 is still pending because TAMQ has no active service/endpoints; this State Hub message is the durable final handoff. Only bootstrap completion bookkeeping remains in this session.",
"thread_id": null,
"read_at": null,
"archived_at": null,
"created_at": "2026-10-13T14:14:41.362488Z",
"kind": "message",
"expires_at": null,
"supersedes_id": null,
"reader": null,
"delivered_at": null,
"acknowledged_at": null
}

View file

@ -5,7 +5,7 @@ title: "Establish intent, delivery plans and State Hub integration"
domain: infotech
repo: rapp-playwright
topic_slug: stack
status: active
status: finished
flavor: planning
owner: codex
created: "2026-10-13"
@ -38,7 +38,7 @@ reuse-surface update; no runtime availability was claimed.
```task
id: RAPP-PLAYWRIGHT-WP-0001-T02
status: progress
status: done
priority: high
state_hub_task_id: "4f62cfc3-2886-5edc-8354-40caab59d239"
```
@ -49,11 +49,16 @@ contract, reproducible service/package, and independent consumer proof with
dependencies and acceptance criteria. Validate links, work-record shape and
absence of unresolved template placeholders.
Completed 2026-10-13: reviewed generated integration files and added the actual
planning-only workflow to AGENTS.md. Classification validation, all Markdown
links, four workplan frontmatters and 13 fenced task records passed checks.
The consistency audit regenerated WORK-RECORDS.md and the offline brief.
## Register, verify projection and notify reuse-surface
```task
id: RAPP-PLAYWRIGHT-WP-0001-T03
status: todo
status: done
priority: high
state_hub_task_id: "24dd7ac3-ae89-5530-8b85-1673e9ac247a"
```
@ -63,3 +68,13 @@ remote. Synchronize all four workplans and their tasks, and verify repository,
host path and work records in State Hub. Notify reuse-surface with provider docs,
workplan references and the planned-only availability boundary. Retain receipts
in `docs/evidence/`. Stop after this handoff.
Completed 2026-10-13: repository `23355f26-7ee1-4036-8c63-3ae78e3072bf` registered
under infotech/stack with tooling classification, Forge remote and host path.
Repo Manager published and reconciled source revision `7331360` on primary
railiance01; separate API readback verified all four plans and 13 task states.
State Hub notification `b6a965ed-c02b-49f2-9272-c234e7c8f6a1` persisted the final
reuse-surface handoff after the earlier TAMQ message remained pending.
See `docs/evidence/2026-10-13-bootstrap.md` and the notification receipt.
WP-0002 through WP-0004 retain the unstarted delivery work; there is no runtime
claim and no transfer of content-explorer's task ownership.