--- id: RAPP-PLAYWRIGHT-WP-0001 type: workplan title: "Establish intent, delivery plans and State Hub integration" domain: infotech repo: rapp-playwright topic_slug: stack status: finished flavor: planning owner: codex created: "2026-10-13" updated: "2026-10-13" reuse_check: "Extend capability.infotech.headless-browser with a provider; preserve existing source-reuse evidence." state_hub_workstream_id: "a97c6998-4d20-5929-a9b1-8c396f679607" --- # Establish the provider planning baseline The requested stopping point is documentation, registration and notification. Service implementation belongs to the subsequent proposed workplans. ## Review demand and establish intent ```task id: RAPP-PLAYWRIGHT-WP-0001-T01 status: done priority: high state_hub_task_id: "3f004442-f597-5305-8055-93b3d36c4864" ``` Reviewed CONTENT-WP-0000-T04, REUSE-IN-0001 and the existing capability record. Recorded evidence and adopted sibling structures in `docs/demand-and-reuse.md`. Authored `INTENT.md` and `SCOPE.md` with delivery ownership, consumer boundaries, testable success criteria and planned availability. Sent the initial reuse-surface update; no runtime availability was claimed. ## Establish integration files and staged workplans ```task id: RAPP-PLAYWRIGHT-WP-0001-T02 status: done priority: high state_hub_task_id: "4f62cfc3-2886-5edc-8354-40caab59d239" ``` Review registration-generated AGENTS.md and offline brief. Document the actual planning-only developer workflow. Verify the three proposed workplans cover contract, reproducible service/package, and independent consumer proof with dependencies and acceptance criteria. Validate links, work-record shape and absence of unresolved template placeholders. Completed 2026-10-13: reviewed generated integration files and added the actual planning-only workflow to AGENTS.md. Classification validation, all Markdown links, four workplan frontmatters and 13 fenced task records passed checks. The consistency audit regenerated WORK-RECORDS.md and the offline brief. ## Register, verify projection and notify reuse-surface ```task id: RAPP-PLAYWRIGHT-WP-0001-T03 status: done priority: high state_hub_task_id: "24dd7ac3-ae89-5530-8b85-1673e9ac247a" ``` Register rapp-playwright under infotech/stack with its actual checkout and Forge remote. Synchronize all four workplans and their tasks, and verify repository, host path and work records in State Hub. Notify reuse-surface with provider docs, workplan references and the planned-only availability boundary. Retain receipts in `docs/evidence/`. Stop after this handoff. Completed 2026-10-13: repository `23355f26-7ee1-4036-8c63-3ae78e3072bf` registered under infotech/stack with tooling classification, Forge remote and host path. Repo Manager published and reconciled source revision `7331360` on primary railiance01; separate API readback verified all four plans and 13 task states. State Hub notification `b6a965ed-c02b-49f2-9272-c234e7c8f6a1` persisted the final reuse-surface handoff after the earlier TAMQ message remained pending. See `docs/evidence/2026-10-13-bootstrap.md` and the notification receipt. WP-0002 through WP-0004 retain the unstarted delivery work; there is no runtime claim and no transfer of content-explorer's task ownership.