# RMGR-WP-0005 batch 0007 fleet-completion cutover Date: 2026-08-31 Decision: `RMGR-DEC-2026-006` Source plan SHA-256: `ab8ae2e55470553f105c6209d6aa4c7b828085bd6c71cec7b16173b8a19bef7b` Approved batch SHA-256: `c0cc496a06d9535a40840a0c7488cf365d8e47c5c58cc29aca72fb6d98273700` ## Outcome Bernd Worsch approved the decision as written. Batch 0007 completed all 85 identifier replacements across its ten named repositories, with zero assignments and no rollback. Each repository passed source, Git, primary identity, and projection preconditions immediately before execution. The railiance01 projection transaction completed before the atomic file rewrite; each repository was then committed, pushed, reconciled from the exact Forgejo commit, and checked for legacy=404, deterministic=200, and matching canonical record identity. | Repository | Replaced | Commit | Reconcile | | --- | ---: | --- | --- | | `fin-hub` | 13 | `bbfa2d6` | applied, zero refused | | `net-kingdom` | 16 | `ce198fc` | applied, zero refused | | `prj-canon-federation` | 13 | `921f007` | applied, zero refused | | `prj-forgejo-org-refactor` | 6 | `b9e9b73` | applied, zero refused | | `prj-state-hub-retirement` | 8 | `354e13d` | applied, zero refused | | `prj-unattended-progress-company` | 13 | `2901cc9` | applied, zero refused | | `railiance-master` | 3 | `51747ca` | applied, zero refused | | `railiance-telemetry` | 4 | `aa59e80` | applied, zero refused | | `rapp-qonto` | 4 | `1a6fa41` | applied, zero refused | | `soul-frame` | 5 | `7e4ed86` | applied, zero refused | `rapp-qonto` exercised the guarded duplicate-convergence path deployed in State Hub commit `a7c91a6`: one legacy workplan migrated normally and three exact, unreferenced task duplicates were coalesced transactionally. All four legacy endpoints now return 404 and all four deterministic endpoints retain the canonical record identity. ## Bounded sync-wrapper finding After `net-kingdom` was pushed, the high-level `rmgr sync` wrapper refused its pre-projection identity scan because archived historical id `NK-WP-0003-T08a` is noncanonical. This was not source drift, a migrated record, or a projection failure. The underlying guarded forge-derived reconcile accepted the exact pushed commit, updated the projection with zero refusals, and direct verification passed all 16 mapped records. The checkout is clean and synchronized. Residual `RMGR-IN-0003` tracks scoping normal sync validation so unrelated historical conformance findings do not block canonical work. ## Fleet closure proof The fresh post-cutover plan is `docs/evidence/RMGR-WP-0005-fleet-postcutover-2026-08-31.json`, sealed as `9dbe8b9dd43997fc80617d18070e7359394b6473c06b54b03ace5288a321b263`. It reports: - 42 repositories eligible, zero skipped; - 306 live work records; - 306 unchanged deterministic identifiers; - zero replacements and zero assignments. ## Interim-rule retirement State Hub commit `5dd04dc` removes the C-06/C-11/C-32 single-writer registrar guard. Its convergence test runs two independent hub stores against identical repository sources with `STATEHUB_REGISTRAR=0`, proves byte-identical UUID writeback, verifies each store contains exactly one workplan and one task, and proves a second pass creates no duplicate or byte change. The complete State Hub suite passes (828 tests) and the dashboard production build succeeds. The exact image `main-5dd04dc` is live on railiance01 as Helm revision 55. The deployment rollout succeeded; live health reports `primary/railiance01` with schema `a4d5e6f7b8c9` current. State Hub commit `d8e1810` pins the chart and values declaration to the deployed image. No migration rollback was required.