CUST-WP-0055 T06/T07: workplan prose in active workplans and archive notes
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 3s

Fix remaining workstream prose in active RREG workplans; add archive
grandfather notes fleet-wide in this repo.
This commit is contained in:
tegwick 2026-07-08 20:26:24 +02:00
parent 4a2a6cb408
commit ebe4ff35e3
2 changed files with 3 additions and 3 deletions

View file

@ -158,7 +158,7 @@ Priority order for the refresh:
analysis in repo-scoping first) analysis in repo-scoping first)
3. Repos with approved characteristics but stale SCOPE.md (C5b/C5c warn) 3. Repos with approved characteristics but stale SCOPE.md (C5b/C5c warn)
Log each write as a progress event on the custodian workstream. Log each write as a progress event on the custodian workplan.
Acceptance: `make check-doi` across all reachable repos reports no C5a Acceptance: `make check-doi` across all reachable repos reports no C5a
failures; C5b/C5c warns are reduced to repos genuinely awaiting curator input. failures; C5b/C5c warns are reduced to repos genuinely awaiting curator input.

View file

@ -162,7 +162,7 @@ coverage. Full repo test suite passed locally with `.venv/bin/python -m pytest`
its resolver. its resolver.
Closeout note 2026-05-16: all repo-scoping-side WP-0012 tasks are done, and the Closeout note 2026-05-16: all repo-scoping-side WP-0012 tasks are done, and the
State Hub workstream should remain closed. Any follow-up activity-core resolver State Hub workplan should remain closed. Any follow-up activity-core resolver
work is tracked in the activity-core workplans rather than this provider work is tracked in the activity-core workplans rather than this provider
contract workplan. contract workplan.
@ -182,4 +182,4 @@ contract workplan.
existing Markdown `/scope` endpoint, define `/scope/context`, and normalize existing Markdown `/scope` endpoint, define `/scope/context`, and normalize
ADR-001 task blocks. ADR-001 task blocks.
- v0.3 (2026-05-16): Closed repo-scoping provider workplan; downstream - v0.3 (2026-05-16): Closed repo-scoping provider workplan; downstream
activity-core follow-up is no longer a blocker for this repo's workstream. activity-core follow-up is no longer a blocker for this repo's workplan.