# Evidence basis — where we know, and where we guess
|
||
|
|
|
||
|
|
A counted object and an assumed hourly rate are both numbers. They are not both
|
||
|
|
knowledge. Every quantity in this repository declares **how it was obtained**,
|
||
|
|
so a decision can be graded by the weakest thing it actually rests on.
|
||
|
|
|
||
|
|
Vocabulary and propagation: `tools/basis.py`.
|
||
|
|
|
||
|
|
## The scale
|
||
|
|
|
||
|
|
Ordered strongest to weakest. The order is the point — it is what makes
|
||
|
|
"weakest input wins" computable.
|
||
|
|
|
||
|
|
| Basis | Meaning | Example here |
|
||
|
|
|---|---|---|
|
||
|
|
| `invoiced` | A booked financial fact, authoritative from fin-hub | none yet |
|
||
|
|
| `measured` | Directly observed from the authoritative system | 8 objects, 6 604 031 B in the backup prefix |
|
||
|
|
| `quoted` | Stated by a provider or counterparty in a citable source | Scaleway €0.01606/GB-month |
|
||
|
|
| `derived` | Computed from other values by a stated rule | €7.35/month infrastructure |
|
||
|
|
| `projected` | Interpolated between, or extrapolated beyond, observations | 457.968 GB stored at month 12 |
|
||
|
|
| `estimated` | Human judgement, neither observed nor computed | apps-pg 6 operator-hours setup |
|
||
|
|
| `assumed` | A modelling constant we chose | €60/hour operator rate |
|
||
|
|
| `unknown` | No value exists | railiance01 monthly price |
|
||
|
|
|
||
|
|
`invoiced`, `measured`, and `quoted` are **evidenced**: they assert an observed
|
||
|
|
or contracted fact. Everything below them is inference.
|
||
|
|
|
||
|
|
## The propagation rule
|
||
|
|
|
||
|
|
> A derived value is only as strong as its weakest input.
|
||
|
|
|
||
|
|
Without this rule a precise-looking figure launders weak assumptions. The
|
||
|
|
monthly labour line for the backup store is €60.00, which reads like a
|
||
|
|
measurement. It is `derived` from an `assumed` operator-hour allowance and an
|
||
|
|
`assumed` hourly rate, so it resolves to **`assumed`** — the weakest class of
|
||
|
|
input we have.
|
||
|
|
|
||
|
|
Deriving in the other direction is not penalised: GB computed from measured
|
||
|
|
bytes resolves to `measured`, because both inputs are.
|
||
|
|
|
||
|
|
## Two orthogonal qualifiers
|
||
|
|
|
||
|
|
**`proxy_for`** — the value is a genuine measurement of a *different* quantity
|
||
|
|
than the one being reasoned about. It does not weaken the measurement; it
|
||
|
|
weakens the inference. The apps-pg allocation driver measures database bytes
|
||
|
|
accurately, and one of those databases has never recorded a transaction, so as
|
||
|
|
a driver for cost it is a proxy whose validity is separate from its precision.
|
||
|
|
|
||
|
|
**`observed_at`** — a measurement has an age. A single sample from a
|
||
|
|
four-hour-old resource is `measured` and still thin.
|
||
|
|
|
||
|
|
## Unknown is never zero
|
||
|
|
|
||
|
|
A value with basis `unknown` carries no quantity and must name the gap and its
|
||
|
|
owner. A value with any other basis must carry a quantity. Zero means "measured
|
||
|
|
and none"; unknown means "not measured". The validator enforces both directions.
|
||
|
|
|
||
|
|
## Decision grades
|
||
|
|
|
||
|
|
`decision_grade(values)` reports the distribution, the weakest basis, the
|
||
|
|
evidenced ratio, and a grade:
|
||
|
|
|
||
|
|
| Grade | Condition |
|
||
|
|
|---|---|
|
||
|
|
| `evidenced` | Every load-bearing value is invoiced, measured, or quoted |
|
||
|
|
| `projected` | The conclusion rests on values projected from observations |
|
||
|
|
| `indicative` | The conclusion is no stronger than an estimated or assumed value |
|
||
|
|
| `insufficient` | At least one load-bearing value is unknown |
|
||
|
|
|
||
|
|
### The first real application
|
||
|
|
|
||
|
|
The provider comparison that selected Scaleway over Hetzner — a €29.14/month
|
||
|
|
difference stated to the cent — grades **`indicative`**:
|
||
|
|
|
||
|
|
```
|
||
|
|
by_basis: {quoted: 1, projected: 1, assumed: 2}
|
||
|
|
weakest: assumed
|
||
|
|
evidenced_ratio: 0.25
|
||
|
|
```
|
||
|
|
|
||
|
|
One of four load-bearing values is evidenced. The two labour figures, which are
|
||
|
|
what actually inverted the ranking, are both `assumed` on top of `assumed`.
|
||
|
|
|
||
|
|
This does not overturn the decision. The direction is robust — Hetzner needs
|
||
|
|
more operator time under any plausible rate, and the alternative was five times
|
||
|
|
dearer. But it does say plainly that the *magnitude* is a model output, not a
|
||
|
|
measurement, and that the cheapest way to strengthen it is to record real
|
||
|
|
operator hours rather than to refine the arithmetic.
|
||
|
|
|
||
|
|
That is the whole purpose of the scale: to make the difference between a firm
|
||
|
|
conclusion and a confident-looking one visible before it is acted on.
|
||
|
|
|
||
|
|
## Where it applies today
|
||
|
|
|
||
|
|
- `data/capability/*.json` — every consumption row and evidence item.
|
||
|
|
- Provider comparisons carried in a capability restatement.
|
||
|
|
|
||
|
|
Not yet retrofitted: `data/actuals/`, `data/control-cycle/`, and the option
|
||
|
|
fields of `data/optimization/`. Those already distinguish known from unknown and
|
||
|
|
carry `measurement_gaps` and `uncertainty` notes, but they do not yet grade a
|
||
|
|
present value. That is the next step, and it is the one that would let
|
||
|
|
`make thresholds` report a breach alongside the strength of the evidence
|
||
|
|
producing it.
|