resource-control/workplans/RESOURCE-WP-0007-state-hub-release-margin.md

33 lines
953 B
Markdown
Raw Normal View History

---
id: RESOURCE-WP-0007
type: workplan
title: "Fold State Hub 10m MCP request into reef-railiance-k3s without calling 105m admission"
domain: financials
repo: resource-control
status: proposed
owner: codex
topic_slug: railiance
origin: residual
origin_ref: STATE-WP-0091
created: "2026-09-14"
updated: "2026-09-14"
related: [RESOURCE-WP-0003, STATE-WP-0091, RCLUSTER-WP-0014]
---
Residual from STATE-WP-0091. State Hub lowered the MCP CPU request 50m → 10m
after partial telemetry (p99 2.35m, peak 30.45m, 1,078 samples, not a full
week). Node remaining became 105m, which is not reef admission and does not
authorize procurement or scaling.
## Update portfolio evidence, do not admit capacity
```task
id: RESOURCE-WP-0007-T01
status: todo
priority: medium
```
Record the MCP request change as workload-owned demand on
`reef-railiance-k3s`. Keep booked financial authority in fin-hub. Do not
mark the 105m remainder as available shared capacity.