# RESOURCE-WP-0003 fin-hub contract preflight Date: 2026-08-11 Resource-control task: `RESOURCE-WP-0003-T02` Fin-hub tasks: `FIN-WP-0004-T01`, `T02`, `T03`, `T07`, `T08`, `T09` Fin-hub commit: `0034330` ## Result Resource-control accepts the authority and schema boundary in the joint v0.1 contract. Fin-hub's remediation was reviewed against the timestamped assessment and its full suite passed: ```text 46 passed, 1 third-party deprecation warning ``` Resource-control's suite passed after adding its producer-owned schema, forecast exporter, booked-cost consumer validation, and reconciliation seam: ```text 13 passed resource-control declarations: valid ``` ## Cross-repository check The live immutable backup forecast `data/forecasts/platform-audit-storage-scaleway-base-2026-08.json` was processed through both implementations using: - resource-control `tools/financial_exchange.py::forecast_records`; and - fin-hub `fin_hub.services.exchange::ingest_resource_forecast`. Observed result: ```json { "producer_consumer_records": 12, "idempotent_store_rows": 12, "payloads_equal": true, "booked_cost_gate": "awaits attributable provider fact" } ``` Replaying the same forecast did not add rows. All canonical record payloads matched, including IDs, periods, cost breakdown, attribution, assumptions, and provenance reference. ## Residual acceptance gate This preflight proves the planning direction; it is not evidence of purchased storage or actual spend. `FIN-WP-0004-T05` remains waiting until `RESOURCE-WP-0002` produces a real provider financial fact attributable to `platform:audit-storage`. That round trip must then demonstrate: 1. exactly one authoritative booked fact in fin-hub; 2. a non-ledger projection consumed by resource-control; 3. a join to the immutable forecast and technical observation; 4. infrastructure-cost variance with the financial fact ID preserved; and 5. duplicate delivery and any correction leaving effective totals correct. Synthetic records remain suitable for automated contract tests but cannot satisfy this operational gate.