# fin-hub ↔ resource-control contract v0.1 — resource-control ratification Status: authority and schema boundary accepted on 2026-08-11 Fin-hub implementation reviewed: commit `0034330` Workplans: `RESOURCE-WP-0003-T02`, `FIN-WP-0004` The jointly reviewed contract is maintained in fin-hub at `docs/fin-resource-authority-contract-v0.1.md`. This record is the resource-control-side ratification and identifies the artifacts for which this repository is authoritative. ## Authority - fin-hub owns booked financial facts and corrections, tax and currency treatment, budgets, commitments, burn, runway, and viability signals. - resource-control owns resource identity and lifecycle, technical usage, allocation evidence, demand and cost forecasts, and optimization evidence. - workload and platform repositories remain authoritative for native workload identity, service requirements, provisioning, operation, and source telemetry. - neither repository approves contracts, executes payment, or turns planning evidence into booked spend. ## Artifacts - `schemas/planning-evidence.schema.json` is the authoritative resource-control outbound schema. - `tools/financial_exchange.py forecast` converts the existing immutable monthly backup forecast into canonical `ForecastEvidence` records. - `tools/financial_exchange.py reconcile` validates fin-hub booked-cost projections and compares attributable infrastructure cost by accounting period. Booked facts are referenced projections here, never a second ledger. - `schemas/monthly-resource-observation.schema.json` uses `usage_observation` for technical observations. “Booked actual” is reserved for fin-hub facts. Fin-hub owns its outbound `BookedCostEvidence` executable schema. This repository validates the contract fields and arithmetic it consumes, but does not redefine financial authority. ## Acceptance boundary The 12-row `platform:audit-storage` forecast can complete an idempotent planning-evidence preflight before procurement. `FIN-WP-0004-T05` and the operational round trip remain open until an attributable provider charge or credit exists. Fixture or synthetic money may test the seam but cannot satisfy that evidence gate.