WP-0015 finished: coulomb org transfer completes 60/60 publish
After Gitea UI transfer of tegwick/whynot repos to coulomb, align workstation remotes and federation sources to coulomb/<slug>. Roster sweep 60/60 pass; compose has 0 fetch warnings. Mark workplan finished.
This commit is contained in:
parent
593738f209
commit
2b222d0bc8
7 changed files with 34 additions and 36 deletions
11
SCOPE.md
11
SCOPE.md
|
|
@ -82,9 +82,7 @@ index, CLI automation, and the production hub.
|
|||
|
||||
- **Automatic hub refresh** — federated compose is on-demand; no polling or
|
||||
webhooks
|
||||
- **Fully fetchable federation** — hub registers **60** workstation repos; **1**
|
||||
(`tegwick-control`) has no HTTP-visible Gitea repo. See
|
||||
`registry/federation/local-repo-roster.yaml`
|
||||
|
||||
- **Multi-domain federation** — all indexed capabilities remain `helix_forge`
|
||||
- **Planning analytics breadth** — `report gaps` shipped (REUSE-WP-0015-T03);
|
||||
no roadmap views or standardization tracker beyond `overlaps` and compose
|
||||
|
|
@ -104,10 +102,10 @@ See `tools/README.md` for command reference.
|
|||
`registry/capabilities/`.
|
||||
- **Workstation roster:** 60 local git repos at `~/<slug>/` tracked in
|
||||
`registry/federation/local-repo-roster.yaml` — all **established**, **60/60**
|
||||
hub-registered, **59/60** publish-check pass.
|
||||
hub-registered, **60/60** publish-check pass.
|
||||
- **Federation:** `registry/federation/sources.yaml` — **60** sources;
|
||||
`registry/indexes/federated.yaml` — **20** composed capability rows
|
||||
(0 duplicate-ID warnings; 1 optional fetch warning for `tegwick-control`).
|
||||
(0 duplicate-ID warnings; 0 fetch warnings).
|
||||
- **CLI / service:** `reuse_surface/` — validate, query, export, overlaps,
|
||||
catalog, federation, graph, hub client, establish/update/stats, `serve`
|
||||
(FastAPI hub).
|
||||
|
|
@ -121,8 +119,7 @@ See `tools/README.md` for command reference.
|
|||
- **Relation graph:** `docs/graph/capability-graph.mmd`, `docs/graph/index.html`.
|
||||
- **Searchable catalog:** `docs/catalog/search.html`.
|
||||
- **Workplans:** REUSE-WP-0001 through REUSE-WP-0014 finished (archived);
|
||||
**REUSE-WP-0015** active — T02/T03/T04/T05/T06 done; T01 blocked on
|
||||
`tegwick-control` Gitea repo creation.
|
||||
**REUSE-WP-0015** finished (federation polish, dedup, planning analytics).
|
||||
- **Assessment history:** `history/` — intent/scope assessments, rollout
|
||||
milestone, dedup plan, per-repo follow-up.
|
||||
- **Self-assessed vector:** `D5 / A4 / C5 / R3` (see `docs/IntentScopeGapAnalysis.md`).
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue