Capability registry for planning and implementation reuse based on discovery and delivery maturity.
Find a file
tegwick e72966a658 REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge
T01: specs/PlanCheck.md design doc, plan-check-result.schema.json and
reuse-event.schema.json (the latter shared with WP-0019's reuse telemetry).

T02: reuse_surface/plan_check.py + 'reuse-surface plan-check' CLI command.
Deterministic token-Jaccard matching against registry/indexes/federated.yaml
(reuses overlaps.py's TOKEN_RE rather than a second scoring method), with
reuse/extend/new verdicts, markdown and --format json output, staleness
warning, and --record-outcome JSONL telemetry.

T04: reuse_surface/statehub_bridge.py bridges plan-check 'new' verdicts to
State Hub capability requests (--file-request) and surfaces open requests
with no matching capability (report gaps --check-capability-requests, opt-in
to stay offline-safe). Verified against the live local State Hub API;
status field (not catalog_entry_id presence) is the correct open/closed
signal, and the list endpoint needs a longer timeout than the health check
(~7s observed with 5 rows).

T06: docs (tools/README.md, RegistryFederation.md, SCOPE.md,
IntentScopeGapAnalysis.md priority 29) and an informational CI smoke step.

T03 (LLM rerank) not started -- llm-connect isn't running on this
workstation. T05 (ecosystem rollout) remains blocked: WP-0017 has drafted
entries for all 61 repos but they're still local-only pending its own T05
push/publish pass, so the federated index isn't yet worth rolling out
plan-check as ecosystem convention.

16 new tests, all mocked -- no network calls in the default test run.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-07 00:57:18 +02:00
.gitea/workflows REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
.kaizen Onboard coulomb-loop kaizen engagement (LOOP-WP-0005 expansion) 2026-06-18 17:24:34 +02:00
agents Onboard coulomb-loop kaizen engagement (LOOP-WP-0005 expansion) 2026-06-18 17:24:34 +02:00
docs REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
history REUSE-WP-0017: T05 review summary + fix stale seed_capability_ids 2026-07-06 20:02:06 +02:00
registry REUSE-WP-0017-T06: diagnose config-atlas publish blocker 2026-07-06 20:16:59 +02:00
reuse_surface REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
schemas REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
specs REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
templates REUSE-WP-0017-T01: explicit capability_status on roster + coverage split in report gaps 2026-07-06 18:36:05 +02:00
tests REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
tools REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
workplans REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
.custodian-brief.md chore(consistency): sync task status from DB [auto] 2026-07-06 20:18:12 +02:00
.gitignore Complete WP-0010: HTTP remote federation with cache 2026-06-15 02:28:44 +02:00
.repo-classification.yaml Human-review .repo-classification.yaml (CUST-WP-0050 follow-up) 2026-06-22 17:56:16 +02:00
AGENTS.md Normalize agent instructions and workplan frontmatter (STATE-WP-0067) 2026-06-22 23:16:28 +02:00
CLAUDE.md Normalize agent instructions and workplan frontmatter (STATE-WP-0067) 2026-06-22 23:16:28 +02:00
Dockerfile Fix K8s service env collision on REUSE_SURFACE_PORT 2026-06-15 10:08:54 +02:00
INTENT.md docs: refresh SCOPE and INTENT↔SCOPE gap analysis post WP-0014 2026-06-16 02:17:07 +02:00
LICENSE Initial commit 2026-06-14 20:58:40 +00:00
pyproject.toml Implement REUSE-WP-0013 registry establish, update, and stats 2026-06-16 01:21:01 +02:00
README.md Update README.md 2026-06-14 20:59:01 +00:00
SCOPE.md REUSE-WP-0018 T01/T02/T04/T06: plan-check deterministic matching + State Hub bridge 2026-07-07 00:57:18 +02:00
uv.lock WP-0016 finished: interactive registry maintain with llm-connect automation 2026-06-18 04:00:39 +02:00

Capability registry for planning and implementation reuse based on discovery and delivery maturity.