T02 inbox check, wired into make check and verified against the actual
2026-08-19 failure — replayed at that moment it surfaces all three
messages that were already waiting. T03 sweeps the rest of the
quietly-tolerated class: bad dates, cadence off the ladder, undefined
disclosure states, dangling constraint_on and related refs, embargoes
without conditions, escalations without triggers. T04 requests
verification of user-engine's tenant boundary — the first walk down the
on-request path, chosen as a consumer not already known to fail it. T05
established by trying what this register can verify: cluster yes, OpenBao
403. T06 puts regulatory records on the findings ladder.
T01 stays in progress: the procedure, make due and make checked exist,
but arming something that runs them on schedule is a standing compute
commitment and the operator's to make.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
The outstanding half of RISK-F-0008 that needed no authorisation. Grounds
stated per category rather than as a blanket exemption: Art 6(1)(f) with
Art 32 for operator and agent records, Art 17(3)(e) for counterparty
transaction evidence, Art 17(3)(b) only where a commercial or tax duty
independently applies. The weak part is named as duration rather than
existence, and audit-core's co-residency horizon is identified as the
most likely point of failure in the whole position. Not legal advice, and
the record says so.
Also opens docs/regulatory/ with the record format — dated, sourced, and
reviewed, because a regulatory answer expires.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>