Add smiley feedback collector with comment after a completed run (RBT-WP-0004-T12)
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com> Assistant: claude-code Assistant-Model: sonnet Assistant-Process: 295952@bnt-lap001 Assistant-Session: e93f64ad-516c-46eb-9666-aad8d300c477
This commit is contained in:
parent
7d0249ed51
commit
c17b43264d
6 changed files with 167 additions and 2 deletions
|
|
@ -163,6 +163,19 @@ Depends on RBT-WP-0007 T06-T07. Choose manual or autopilot per run (with timeout
|
|||
push-through controls). In manual mode, an override dialog lists unmet preconditions and
|
||||
the downstream risk before continuing; deviations show in the overview.
|
||||
|
||||
## Feedback collector
|
||||
|
||||
```task
|
||||
id: RBT-WP-0004-T12
|
||||
status: done
|
||||
priority: medium
|
||||
```
|
||||
|
||||
Done 2026-09-29: after "All steps done." the run view offers three smileys and a comment
|
||||
(what felt strange or unclear, ideas to optimize). Stored in the run record (history kept,
|
||||
latest wins, secrets refused); `rtut feedback <pack.yaml>` lists the latest per run.
|
||||
Follow-up: fold feedback into the overview and use it to prioritize pack refinements.
|
||||
|
||||
## Acceptance Criteria
|
||||
|
||||
- Bernd can complete the SSH tutorial pack in the UI without pasting outputs to an agent.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue