Register SOUL-WP-0009: promote to active, fix section references

Reviewed against current repo state (draft.md section numbers,
concepts/*.md, SCOPE.md, research/law-governance/ all confirmed present)
and promoted proposed -> active to begin implementation. Corrected
"§16.x" subsection references to the actual numbered-list items in
draft.md §16.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: sonnet
Assistant-Process: 136745@bnt-lap001
Assistant-Session: 2e334b58-ed31-48ed-8156-d09f8ed0781f
This commit is contained in:
tegwick 2026-09-28 14:45:16 +02:00
parent d10e0fd6c2
commit a670406e6c

View file

@ -4,7 +4,7 @@ type: workplan
title: "Phase VIII — Paper research agenda and external review pathway"
domain: agents
repo: soul-frame
status: proposed
status: active
flavor: research
owner: grok
topic_slug: soul-frame
@ -42,7 +42,7 @@ priority: medium
state_hub_task_id: "3daca5cd-322f-5256-932d-1271f0c040a8"
```
Resolve retain-vs-rename for "Soul" (Terminology.md; draft §8, §16.1). Produce
Resolve retain-vs-rename for "Soul" (Terminology.md; draft §8, §16 item 1). Produce
a decision record, not just more discussion — this has been open since
Phase I.
@ -62,7 +62,7 @@ state_hub_task_id: "7acfed9e-cc8b-5283-a298-90b749a28ee7"
Develop a principled way to weigh conflicts between continuity dimensions
(causal, organizational, psychological, autobiographical/narrative,
normative, relational) for hard cases (draft §16.2). Test against TE-02,
normative, relational) for hard cases (draft §16 item 2). Test against TE-02,
TE-03, TE-04, TE-08.
**Done when:** a weighting scheme (or explicit non-arithmetic decision
@ -80,7 +80,7 @@ priority: low
state_hub_task_id: "223e14d8-7bdf-5c49-9650-6fba70840c3c"
```
Sharpen the boundary flagged in draft §16.3 and the TE-09 asymmetric-
Sharpen the boundary flagged in draft §16 item 3 and the TE-09 asymmetric-
recognition addition — when exactly does a recognized-but-autonomous
individual cross into Social Beinghood?
@ -99,7 +99,7 @@ state_hub_task_id: "81a4c87d-cff5-5448-acf2-8c170301a014"
```
Scope (not necessarily build) measurable proxies for the A-axis (B1–B8),
B-axis (P1–P12), and continuity profiles (draft §16.4). This is a scoping
B-axis (P1–P12), and continuity profiles (draft §16 item 4). This is a scoping
task — full metric development may become its own workplan.
**Done when:** a scoping note exists identifying which axes are plausibly