Complete SOUL-WP-0009: resolve RQ4 and publication pathway, deliver T02-T05
- T01 (RQ4): retain "Soul" - resolved with operator; Terminology.md, concepts/soul.md, OpenQuestions.md, Claims.md, paper/draft.md updated. - T02: lexicographic continuity-weighting procedure in concepts/identity.md, validated against TE-02/03/04/08. - T03: testable Being-vs-Social-Being boundary (three-part recognition test) in concepts/recognition.md and concepts/being.md, validated against TE-05/09. - T04: research/metrics-scoping-note.md - per-axis measurability scoping. - T05: research/law-governance/moral-legal-personhood-charter.md - bounded companion-line charter, explicitly not the mapping itself. - T06: publication pathway resolved with operator - internal circulation only, as paper-one for coulomb-research, following the same staged trajectory as coulomb-research's own paper-zero. Marks SOUL-WP-0009 finished. Opens SOUL-WP-0010 (proposed, not started) to carry forward the two multi-step residuals from T04/T05. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Assistant: claude-code Assistant-Model: sonnet Assistant-Process: 136745@bnt-lap001 Assistant-Session: 2e334b58-ed31-48ed-8156-d09f8ed0781f
This commit is contained in:
parent
adbfd1bab4
commit
bd79b100c2
12 changed files with 428 additions and 34 deletions
|
|
@ -4,7 +4,7 @@ type: workplan
|
|||
title: "Phase VIII — Paper research agenda and external review pathway"
|
||||
domain: agents
|
||||
repo: soul-frame
|
||||
status: active
|
||||
status: finished
|
||||
flavor: research
|
||||
owner: grok
|
||||
topic_slug: soul-frame
|
||||
|
|
@ -37,7 +37,7 @@ that should not be parked in `SCOPE.md` prose.
|
|||
|
||||
```task
|
||||
id: SOUL-WP-0009-T01
|
||||
status: todo
|
||||
status: done
|
||||
priority: medium
|
||||
state_hub_task_id: "3daca5cd-322f-5256-932d-1271f0c040a8"
|
||||
```
|
||||
|
|
@ -49,13 +49,17 @@ Phase I.
|
|||
**Done when:** decision recorded (`record_decision`/`resolve_decision`) with
|
||||
rationale, and `Terminology.md` + `paper/draft.md` updated to match.
|
||||
|
||||
**Resolved 2026-09-28:** retain "Soul" (decision `8429f2ce-5b8a-4d90-810e-f526ec2d0c05`).
|
||||
Updated: `Terminology.md`, `concepts/soul.md`, `OpenQuestions.md` RQ4,
|
||||
`Claims.md` H5, `paper/draft.md` §8/§16/§17.
|
||||
|
||||
---
|
||||
|
||||
### T02 — Continuity dimension weighting
|
||||
|
||||
```task
|
||||
id: SOUL-WP-0009-T02
|
||||
status: todo
|
||||
status: done
|
||||
priority: medium
|
||||
state_hub_task_id: "7acfed9e-cc8b-5283-a298-90b749a28ee7"
|
||||
```
|
||||
|
|
@ -69,13 +73,18 @@ TE-03, TE-04, TE-08.
|
|||
procedure) is documented in `concepts/identity.md` and validated against the
|
||||
four thought experiments above.
|
||||
|
||||
**Completed 2026-09-28:** lexicographic priority procedure (structural gate
|
||||
→ branch check → gradualness check → softer dimensions decide strength
|
||||
within the gate) added to `concepts/identity.md`; walked through TE-02,
|
||||
TE-03, TE-04, TE-08.
|
||||
|
||||
---
|
||||
|
||||
### T03 — Recognition's seat: Being vs. Social Being
|
||||
|
||||
```task
|
||||
id: SOUL-WP-0009-T03
|
||||
status: todo
|
||||
status: done
|
||||
priority: low
|
||||
state_hub_task_id: "223e14d8-7bdf-5c49-9650-6fba70840c3c"
|
||||
```
|
||||
|
|
@ -87,13 +96,18 @@ individual cross into Social Beinghood?
|
|||
**Done when:** `concepts/being.md` / `concepts/recognition.md` state a
|
||||
testable boundary condition, checked against TE-05 and TE-09.
|
||||
|
||||
**Completed 2026-09-28:** three-part test (intentional recognition +
|
||||
addressability + model persistence across episodes, on at least one side)
|
||||
added to `concepts/recognition.md`, cross-referenced from `concepts/being.md`;
|
||||
walked through TE-09 (asymmetric start) and TE-05 (per-level nested test).
|
||||
|
||||
---
|
||||
|
||||
### T04 — Empirical/operational metrics scoping
|
||||
|
||||
```task
|
||||
id: SOUL-WP-0009-T04
|
||||
status: todo
|
||||
status: done
|
||||
priority: low
|
||||
state_hub_task_id: "81a4c87d-cff5-5448-acf2-8c170301a014"
|
||||
```
|
||||
|
|
@ -105,13 +119,17 @@ task — full metric development may become its own workplan.
|
|||
**Done when:** a scoping note exists identifying which axes are plausibly
|
||||
measurable now vs. which require new instruments.
|
||||
|
||||
**Completed 2026-09-28:** `research/metrics-scoping-note.md` — per-code
|
||||
table for B1–B8 and the continuity profile; found the B-axis (P1–P12) is
|
||||
blocked on enumeration, not metrics, as a prerequisite gap.
|
||||
|
||||
---
|
||||
|
||||
### T05 — Moral/legal personhood companion line (explicitly separate)
|
||||
|
||||
```task
|
||||
id: SOUL-WP-0009-T05
|
||||
status: todo
|
||||
status: done
|
||||
priority: low
|
||||
state_hub_task_id: "42f2de8a-c9cd-5af5-b42d-3f6cac5eb301"
|
||||
```
|
||||
|
|
@ -126,13 +144,17 @@ do not attempt the mapping itself here.
|
|||
`research/law-governance/moral-legal-personhood-charter.md`) stating scope,
|
||||
non-goals, and the explicit boundary against the descriptive core.
|
||||
|
||||
**Completed 2026-09-28:** `research/law-governance/moral-legal-personhood-charter.md`
|
||||
— scope, four non-goals, and relationship to existing gap-sketch material;
|
||||
explicitly not opened as a workplan yet.
|
||||
|
||||
---
|
||||
|
||||
### T06 — External review / publication pathway decision
|
||||
|
||||
```task
|
||||
id: SOUL-WP-0009-T06
|
||||
status: todo
|
||||
status: done
|
||||
priority: medium
|
||||
state_hub_task_id: "38aa9a5a-552c-555d-a27d-c8f84a76128b"
|
||||
```
|
||||
|
|
@ -143,3 +165,23 @@ further revision cycles before either. This is a founder-gate decision.
|
|||
|
||||
**Done when:** decision recorded via `record_decision`/`resolve_decision`
|
||||
naming the chosen pathway and next concrete step.
|
||||
|
||||
**Resolved 2026-09-28:** internal circulation only, as paper-one for
|
||||
coulomb-research, following the same staged trajectory (internal →
|
||||
pre-print → journal target) as coulomb-research's own paper-zero (decision
|
||||
`cf950384-8bc6-4156-9caf-85b5d4a7ea25`). Recorded in `paper/draft.md` status
|
||||
header. Next concrete step: internal review inside coulomb-research once
|
||||
that facility is set up; no external action required yet.
|
||||
|
||||
---
|
||||
|
||||
## Closing note (2026-09-28)
|
||||
|
||||
All six tasks complete. T01 and T06 were founder-gate decisions (Soul
|
||||
naming affects the project's own name/mnemonic; publication pathway is a
|
||||
business decision) and were resolved with Bernd before implementation;
|
||||
T02–T05 were research/documentation tasks executed directly.
|
||||
|
||||
**Residual:** T04 and T05 each recommended follow-on work that is
|
||||
multi-step. Bundled as **SOUL-WP-0010**, left `proposed` for review rather
|
||||
than started.
|
||||
|
|
|
|||