Add STATE-WP-0071 workplan for railiance01 caller migration deploy
Operational deploy plan for WSL baseline, ops-bridge tunnels, railiance01 git repair, activity-core k8s rollout, and legacy-meter verification. Links from STATE-WP-0070 T01; status proposed pending operator review.
This commit is contained in:
parent
19bd56854c
commit
3dd6ef87dd
2 changed files with 204 additions and 1 deletions
|
|
@ -58,7 +58,8 @@ dashboard loaders, cleanup_stale_tasks, validate_repo_adr. Local sweep attribute
|
|||
`state-hub.fix-consistency` on task-create metering. railiance01 still at
|
||||
`050cbbc`; `git pull` blocked (`.git/FETCH_HEAD` permission denied) — needs
|
||||
operator deploy. Hub message posted to `ops-warden` (2026-07-09); runbook at
|
||||
`docs/evidence/railiance01-state-hub-deploy-20260709.md`.
|
||||
`docs/evidence/railiance01-state-hub-deploy-20260709.md`. Operational deploy
|
||||
tracked in **`STATE-WP-0071`** (proposed — review before execution).
|
||||
|
||||
## Task: Retire remaining REST `/workstreams` routes per key
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue