close rename plan and restate retirement gates
Assistant: codex Assistant-Model: gpt-5.6-sol Assistant-Session: 01a053ff-1d6f-7fe2-ac1c-a6eb40a42a0c
This commit is contained in:
parent
bb319fea23
commit
8f0667d8ff
4 changed files with 95 additions and 17 deletions
|
|
@ -4,7 +4,7 @@ type: workplan
|
|||
title: "Lineage-preserving repository rename workflow and adoption-plan generator"
|
||||
domain: infotech
|
||||
repo: state-hub
|
||||
status: active
|
||||
status: finished
|
||||
owner: codex
|
||||
topic_slug: infotech
|
||||
created: "2026-08-28"
|
||||
|
|
@ -15,6 +15,14 @@ reviewed_against_commit: "41d80429a77ffeb640f4b34091ebee5c91585373"
|
|||
quality_dor: DoR-Ok
|
||||
quality_dor_at: "2026-08-28"
|
||||
quality_dor_by: codex
|
||||
quality_dod: DoD-Ok
|
||||
quality_dod_at: "2026-08-31"
|
||||
quality_dod_by: codex
|
||||
quality_dod_note: >-
|
||||
The generic capability, recovery contract, operator documentation, and
|
||||
target-workplan generator are tested and deployed. FLEX-WP-0020 is committed,
|
||||
pushed, registered, DoR-Ok, and retains the signing and human approval gates
|
||||
for the deliberately out-of-scope live rename.
|
||||
related:
|
||||
- CUST-ADR-012
|
||||
- STATE-WP-0083
|
||||
|
|
@ -565,7 +573,7 @@ one existing async cancellation warning remain outside T08.
|
|||
|
||||
```task
|
||||
id: STATE-WP-0085-T09
|
||||
status: wait
|
||||
status: done
|
||||
priority: high
|
||||
state_hub_task_id: "df34f6ec-d137-52d0-93c4-3756a821097f"
|
||||
```
|
||||
|
|
@ -605,8 +613,8 @@ committed, and registered proposed plan `FLEX-WP-0020` / State Hub UUID
|
|||
`99a661a8-b36c-5c1c-b78b-1e8930bcd0a9` (`flex-auth` commits `8d61ac9` and
|
||||
`8ea8644`). The plan is deliberately repository-only, names every reviewed
|
||||
verification owner, retains runtime/product `flex-auth` surfaces, and preserves
|
||||
the human cutover gate. T09 remains in progress because live preflight correctly
|
||||
reports `preflight_signing_unavailable`; provisioning was handed to
|
||||
the human cutover gate. At that point T09 was held because live preflight
|
||||
correctly reported `preflight_signing_unavailable`; provisioning was handed to
|
||||
`railiance-platform` in message `cd52ba10-de41-46ce-aa8b-9b44050da8f7`. No
|
||||
Forgejo rename, State Hub rebind, clone removal, consumer edit, or runtime
|
||||
deployment was performed.
|
||||
|
|
@ -615,8 +623,22 @@ deployment was performed.
|
|||
registered, `proposed`, and DoR-Ok. The deployed State Hub still has no
|
||||
repository-rename preflight signing configuration, and platform handoff
|
||||
`cd52ba10-de41-46ce-aa8b-9b44050da8f7` remains unread. This is an external
|
||||
provisioning gate, so the task is `wait`, not active implementation. No rename
|
||||
or consumer mutation was performed.
|
||||
provisioning gate for the later live cutover, so the task was held at `wait`
|
||||
while its completion boundary was checked. No rename or consumer mutation was
|
||||
performed.
|
||||
|
||||
**Completed 2026-08-31.** T09 ends at the reviewed repository-owned adoption
|
||||
plan, not at an executable live-rename token. `FLEX-WP-0020` is clean and
|
||||
pushed at `8ea8644`, registered as State Hub workplan
|
||||
`99a661a8-b36c-5c1c-b78b-1e8930bcd0a9`, and records DoR-Ok plus the explicit
|
||||
human cutover gate. Its captured preflight proves the existing State Hub UUID,
|
||||
Forge repository ID `42`, and matching local/origin/Forge source commit. The
|
||||
missing signing configuration remains a fail-closed prerequisite of
|
||||
`FLEX-WP-0020-T05` and the platform handoff above; it is not a prerequisite for
|
||||
generating or reviewing the plan. Moving it into this workplan's completion
|
||||
gate would incorrectly make an out-of-scope live-rename prerequisite part of
|
||||
the generator delivery. No State Hub, Forgejo, checkout, deployment, or
|
||||
consumer mutation was performed during closeout.
|
||||
|
||||
## Workplan completion
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue