613477b4d2 docs(STATE-WP-0079): cutover slice plan, close T02
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 2s
Assign all 425 SHR-INV-0001 items to 19 slices across five waves plus Keep,
each with adapter flag, owner API, and rollback. Coverage computed against
the inventory rather than hand-counted.

Only Wave A (repo-manager, 165 items) is executable; B/D1/D2 are gated on
owner-side contracts still at proposed. Flags two findings for T04/T05: the
9 ops_dependency items cannot be strangled behind a flag, and the
legacy-meter weekly review window is 8h, not a week.

Also corrects the workplan status from proposed to active.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-19 23:44:27 +02:00