Meter-gated removal (7 consecutive zero-usage windows reached). Deletes:
- MCP tools: create_workstream, list_workstreams, update_workstream,
update_workstream_status
- MCP resource: state://workstreams/{topic_slug}
- Dead helpers: _LEGACY_MCP_* maps, _legacy_mcp_deprecation,
_meter_legacy_mcp, _attach_legacy_deprecation, _update_workplan_legacy_impl
TOOLS.md keeps a retired→preferred migration map (per backlog). Removed the
now-dead STATEHUB_MCP_LEGACY_METER guard in conftest. Retargeted the
create_workplan error-skip test to the preferred tool; dropped alias-only tests.
Staged on branch state-wp-0070-legacy-retirement — do not merge until the 7th
documented zero-usage window is captured.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
_emit_progress_event strips legacy workstream_id from POST /progress/
payloads. Task and decision side-effect events now set workplan_id
explicitly so automatic progress logging stays workplan-first.
Legacy MCP tools and the workstreams resource now return _deprecation payloads
pointing to workplan-named replacements. get_domain_summary uses workplan-first
prose and exposes a workplans key alongside the legacy workstreams field.
Add C-25..C-30 fix-consistency checks for blocked-workplan inbox sweeps,
stale unread triage, workplan ID prefix/collision lint, and SCOPE freshness.
Extend brief generation and get_domain_summary with inbox hygiene warnings.
Complete workplan_id aliases on remaining MCP tools and retry transient
_api_get failures to reduce false stale-reference errors under load.