target-revenue/examples/pilot-candidates/info-tech-canon-service-surface/manifest.json

29 lines
801 B
JSON
Raw Normal View History

{
"framework": "TRF-0.1",
"license": "TRSL-0.1",
"phase": {
"id": "trsl:phase:draft-info-tech-canon-service-surface",
"milestone_release": {
"name": "info-tech-canon-service-surface-v1 (ITC-WP-0001..0012)",
"source_revision": "f7ad73d"
},
"initial_target": {
Apply Development Effort Calculator to real pilot candidates (WP-0010-T03) Adds since/until date-range scoping to cluster_commit_hours() and workplan_task_counts() (threaded through calculate_target_basis()), needed whenever a candidate is one bounded workplan within a repo whose overall history spans much more (net-kingdom, railiance-apps) rather than the whole repo being the candidate (vergabe-teilnahme, info-tech-canon). Fixes a real bug found along the way: workplan_task_counts() only scanned the top level of workplans/, missing net-kingdom's workplans/archived/ convention entirely - silently reported zero finished workplans for NK-WP-0002, which lives there. Fixed to scan recursively; added a regression test. Updates all three draft pilot-candidate manifests with calculator- derived target_basis/initial_target values, replacing the hand-picked placeholders: net-kingdom-local-identity: 200,000 -> 10,000 EUR (floor + sanity warnings) railiance-vergabe-teilnahme: 3,500,000 -> 648,800 EUR (no warnings) info-tech-canon-service-surface: 2,500,000 -> 141,800 EUR (sanity warning) history/260730-EffortCalculator-CandidateApplication.md records full derivation, warnings, and the judgment calls made explicit rather than silently picked (date-scoping windows; measuring vergabe-teilnahme's own repo rather than railiance-apps' deployment-only wiring, with both figures shown). Still draft/non-binding - WP-0008-T05 unaffected. 5 new tests (20 -> now covering since/until scoping and the archived-subdirectory fix). Full suite: 84 passing offline.
2026-07-30 13:29:06 +02:00
"amount": 141800,
"currency": "EUR"
},
"target_basis": {
Apply Development Effort Calculator to real pilot candidates (WP-0010-T03) Adds since/until date-range scoping to cluster_commit_hours() and workplan_task_counts() (threaded through calculate_target_basis()), needed whenever a candidate is one bounded workplan within a repo whose overall history spans much more (net-kingdom, railiance-apps) rather than the whole repo being the candidate (vergabe-teilnahme, info-tech-canon). Fixes a real bug found along the way: workplan_task_counts() only scanned the top level of workplans/, missing net-kingdom's workplans/archived/ convention entirely - silently reported zero finished workplans for NK-WP-0002, which lives there. Fixed to scan recursively; added a regression test. Updates all three draft pilot-candidate manifests with calculator- derived target_basis/initial_target values, replacing the hand-picked placeholders: net-kingdom-local-identity: 200,000 -> 10,000 EUR (floor + sanity warnings) railiance-vergabe-teilnahme: 3,500,000 -> 648,800 EUR (no warnings) info-tech-canon-service-surface: 2,500,000 -> 141,800 EUR (sanity warning) history/260730-EffortCalculator-CandidateApplication.md records full derivation, warnings, and the judgment calls made explicit rather than silently picked (date-scoping windows; measuring vergabe-teilnahme's own repo rather than railiance-apps' deployment-only wiring, with both figures shown). Still draft/non-binding - WP-0008-T05 unaffected. 5 new tests (20 -> now covering since/until scoping and the archived-subdirectory fix). Full suite: 84 passing offline.
2026-07-30 13:29:06 +02:00
"estimated_effort_days": 1.418,
"daily_rate": 1000,
"approved_direct_costs": 0,
"target_multiple": 100
},
"future_license": "MIT",
"degeneration_policy": "trsl:policy:linear-longstop-v0@1.0",
"longstop_at": "2029-01-01T00:00:00Z",
"ledger": "examples/pilot-candidates/info-tech-canon-service-surface/ledger.json"
},
"extensions": [
"trsl:extension:development-license@1.0"
]
}