2026-07-30 01:29:13 +02:00
|
|
|
|
---
|
|
|
|
|
|
id: TREV-WP-0009
|
|
|
|
|
|
type: workplan
|
|
|
|
|
|
title: "Target Revenue Control Plane and Development Effort Calculator"
|
|
|
|
|
|
domain: infotech
|
|
|
|
|
|
repo: target-revenue
|
|
|
|
|
|
status: active
|
|
|
|
|
|
owner: claude
|
|
|
|
|
|
topic_slug: infotech
|
|
|
|
|
|
created: "2026-07-30"
|
|
|
|
|
|
updated: "2026-07-30"
|
2026-07-30 01:30:23 +02:00
|
|
|
|
state_hub_workstream_id: "0e8dfd43-a742-4458-9e9b-514a9284821b"
|
2026-07-30 01:29:13 +02:00
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
# Target Revenue Control Plane and Development Effort Calculator
|
|
|
|
|
|
|
|
|
|
|
|
Builds the two pieces the maintainer identified as needed to move from
|
|
|
|
|
|
"license text adopted org-wide" (`history/260730-TRSL-OrgWideLicenseRollout.md`)
|
|
|
|
|
|
toward actually declaring real Phases with defensible Initial Targets:
|
|
|
|
|
|
|
|
|
|
|
|
1. A **Control Plane** — an interactive UI over the hosted Trust Service
|
|
|
|
|
|
(`workplans/TREV-WP-0006-trust-service-implementation.md`, finished),
|
|
|
|
|
|
usable by a human user with appropriate rights acting as the `binky`
|
|
|
|
|
|
tenant, to interactively register Phases and — the specific,
|
|
|
|
|
|
named requirement — create Development Credit ledger entries
|
|
|
|
|
|
interactively rather than via raw API calls or the CLI.
|
|
|
|
|
|
2. A **Development Effort Calculator** — turns measurable repo activity
|
|
|
|
|
|
(human interaction time, workplan/task volume, file/line complexity,
|
|
|
|
|
|
AI token cost) into `target_basis` values
|
|
|
|
|
|
(`specs/PhaseManifestSpecification.md`), which combined with a human
|
|
|
|
|
|
Target Multiple classification (10x/100x/1000x) produces a proposed
|
|
|
|
|
|
Initial Target via the framework's own existing formula
|
|
|
|
|
|
(`specs/TargetRevenueFrameworkCore.md` §1.4) — not a new formula.
|
|
|
|
|
|
|
|
|
|
|
|
**Does not include:** declaring any real Phase for any repo. Both
|
|
|
|
|
|
deliverables here are inputs to that decision
|
|
|
|
|
|
(`workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T05), not a way
|
|
|
|
|
|
to bypass it.
|
|
|
|
|
|
|
|
|
|
|
|
## Development Effort Calculator — formula decision (human gate)
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: TREV-WP-0009-T01
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: high
|
|
|
|
|
|
human_accept_required: true
|
2026-07-30 01:30:23 +02:00
|
|
|
|
state_hub_task_id: "96ea1067-22f5-490b-8c42-5236a2193b1a"
|
2026-07-30 01:29:13 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
`specs/DevelopmentEffortCalculatorConcept.md` §3 presents two combination
|
|
|
|
|
|
strategies without choosing between them: Candidate A (labor-cost-
|
|
|
|
|
|
anchored — human time drives `estimated_effort_days`/`daily_rate`, token
|
|
|
|
|
|
cost becomes `approved_direct_costs`, workplan/file metrics are a sanity
|
|
|
|
|
|
check) or Candidate B (composite-index-anchored — all four metric
|
|
|
|
|
|
families scored into one complexity index, converted via a $-per-unit
|
|
|
|
|
|
rate). Confirm one as the adopted v0 approach (or propose a refinement),
|
|
|
|
|
|
per the same human-gate pattern already used for the degeneration policy
|
|
|
|
|
|
formula (`workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md` T02).
|
|
|
|
|
|
Agents may prepare a recommendation and leave this `todo`.
|
|
|
|
|
|
|
|
|
|
|
|
## Control Plane user rights model — decision (human gate)
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: TREV-WP-0009-T02
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: high
|
|
|
|
|
|
human_accept_required: true
|
2026-07-30 01:30:23 +02:00
|
|
|
|
state_hub_task_id: "9d3b2d3d-1a3c-4b63-8cd1-8e6c949ad8b8"
|
2026-07-30 01:29:13 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
`specs/TargetRevenueControlPlaneConcept.md` §2 proposes a four-tier rights
|
|
|
|
|
|
model (Viewer/Contributor/Operator/Admin) and recommends option (b) for
|
|
|
|
|
|
the auth-attribution question (Control Plane holds the one Licensor
|
|
|
|
|
|
token server-side, layers its own human-user auth/audit log in front of
|
|
|
|
|
|
it, rather than requiring a WP-0006 schema change for per-human
|
|
|
|
|
|
sub-credentials). Confirm the rights tiers and the (a)-vs-(b) choice, or
|
|
|
|
|
|
propose a refinement. Agents may prepare a recommendation and leave this
|
|
|
|
|
|
`todo`.
|
|
|
|
|
|
|
|
|
|
|
|
## Implement Development Effort Calculator
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: TREV-WP-0009-T03
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: high
|
2026-07-30 01:30:23 +02:00
|
|
|
|
state_hub_task_id: "fadaef32-0d6a-443f-8dde-9a85952c6d76"
|
2026-07-30 01:29:13 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
Using T01's confirmed formula, implement the calculator: data collection
|
|
|
|
|
|
(commit-timestamp clustering for human time; workplan/task counts via
|
|
|
|
|
|
state hub `list_tasks`/`list_workplans` or direct `workplans/` directory
|
|
|
|
|
|
inspection; file/line counts with generated/vendored-path exclusion per
|
|
|
|
|
|
`specs/DevelopmentEffortCalculatorConcept.md` §2c's flagged distortion;
|
|
|
|
|
|
token cost via `get_token_summary(scope="repo", id=...)`), and the
|
|
|
|
|
|
combination formula itself, producing `target_basis` field values ready
|
|
|
|
|
|
to drop into a Phase Manifest. Output must show its work (which inputs
|
|
|
|
|
|
produced which numbers) — a black-box dollar figure with no visible
|
|
|
|
|
|
derivation would undermine the "transparent, non-gameable" goal
|
|
|
|
|
|
(`specs/TargetRevenueLicenseConcept.md` §4.6) this whole framework is
|
|
|
|
|
|
built around.
|
|
|
|
|
|
|
|
|
|
|
|
## Implement Control Plane (backend + interactive UI)
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: TREV-WP-0009-T04
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: high
|
2026-07-30 01:30:23 +02:00
|
|
|
|
state_hub_task_id: "77b91435-780b-4360-8fe0-922d6483d549"
|
2026-07-30 01:29:13 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
Using T02's confirmed rights model, implement the Control Plane: human
|
|
|
|
|
|
user authentication, the rights-tiered action set from
|
|
|
|
|
|
`specs/TargetRevenueControlPlaneConcept.md` §3–§4 (interactive Development
|
|
|
|
|
|
Credit entry creation as the priority flow), and the Control Plane's own
|
|
|
|
|
|
audit log distinct from the Trust Service's signed records (§5). Reuses
|
|
|
|
|
|
the existing hosted Trust Service API (`service/app.py`) as its backend
|
|
|
|
|
|
without modification unless T02 specifically selects the
|
|
|
|
|
|
per-human-sub-credential option, in which case that WP-0006 auth
|
|
|
|
|
|
extension is this task's prerequisite, not an assumed given.
|
|
|
|
|
|
|
|
|
|
|
|
## Apply calculator to real candidate repos
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: TREV-WP-0009-T05
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: medium
|
2026-07-30 01:30:23 +02:00
|
|
|
|
state_hub_task_id: "3ee25a56-3cbb-4284-b240-d58e12622bf9"
|
2026-07-30 01:29:13 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
Once T03 is implemented, run it against the real candidates already
|
|
|
|
|
|
identified (`specs/PilotPhaseCandidateSurvey.md`: `net-kingdom`'s
|
|
|
|
|
|
`NK-WP-0002`, `railiance-apps`'s `vergabe-teilnahme`, and
|
|
|
|
|
|
`info-tech-canon`'s service surface) to produce **proposed**, calculator-
|
|
|
|
|
|
derived `target_basis` values, replacing the hand-picked illustrative
|
|
|
|
|
|
figures currently in `examples/pilot-candidates/*/manifest.json`. This
|
|
|
|
|
|
remains draft/non-binding — updating a draft manifest's numbers is not a
|
|
|
|
|
|
Phase declaration, and does not touch
|
|
|
|
|
|
`workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T05's own gate.
|