**Status:** Provisional (non-normative until promoted into core specs)
**Date:** 2026-07-28
**Authority:** Unblocks schema enums, golden fixtures, and draft legal skeleton. Does **not** finalize legal policy.
**Sources:** PRD §14, concept §24, SWOT I-09
**Promotion rule:** Moving a default into `TargetRevenueFrameworkCore.md` or TRSL draft requires human accept (SCOPE §4).
---
## How to read this document
| Label | Meaning |
| --- | --- |
| **Working default** | Use this in Stage 0 schemas, examples, and validators |
| **Blocked on research** | No default yet; do not invent in code as if normative |
| **Blocked on legal** | Needs specialist input; skeleton may mark `[LEGAL]` only |
Each item maps to PRD open question numbers in parentheses.
---
## Q1 — Noncommercial rights during protected Phase (1)
**Working default (documentation only):**
During a protected Phase, noncommercial users may view source, evaluate, test, and use for personal, research, and educational purposes consistent with a PolyForm-Noncommercial-style scope — exact clause text is **blocked on legal**.
**Schema impact:** No mandatory machine field beyond Future License and Phase status.
**Not decided:** Contractor-on-behalf-of-enterprise edge cases (see Q2).
Commercial Use is defined objectively as billing, invoicing, or otherwise charging any customer for or in connection with use of the Software before the Conversion Event — regardless of whether the resulting payment is registered with the Trust Service. This replaces the prior circular "use other than Noncommercial Use" framing with a mechanically checkable trigger (the act of billing), which substantially resolves the affiliate/contractor/mixed-purpose/public-sector ambiguity below, since classification no longer depends on who the customer is, only on whether they are billed.
**Still blocked on legal:** whether consumer-protection law in a given jurisdiction overrides this classification for an individual/sole-proprietor customer — see `history/260729-TRSL-Jurisdiction-StandardTerms.md` §4 item 2 and the recurring B2B/consumer pattern found across `workplans/TREV-WP-0004-global-jurisdiction-research.md` (Germany/EU, US via CCPA, Argentina).
**Stage 0 practice:** Golden examples assume a paying "commercial entitlement" for any company production use; do not encode a full classifier in the fold library — the License's billing-based trigger is a legal/contractual definition, not a Stage 0 schema field.
Both **MIT** and **Apache-2.0** are allowed `phase.future_license` enum values. Phase authors choose one at publication; default in examples is **MIT**.
**Patent treatment of pre-conversion phase:** Express patent license for permitted uses is **blocked on legal** (WP-0001-T03). Schemas allow Future License enum only; no separate patent field required in Stage 0.
---
## Q4 — Target Multiple classes (4)
**Working default:**
`target_multiple` is an **open decimal** ≥ 0. The 0x / 1x / 10x / 100x / 1000x labels are **guidance classes** (concept §7.4), not a closed enum.
**Stage 0 practice:** Examples use 100. Validators accept any non-negative decimal; may **warn** (not fail) if value is not in `{0,1,10,100,1000}`.
---
## Q5 — Development-cost components in target basis (5)
`Initial Target = (effort × rate + direct costs) × target_multiple` when basis is fully supplied.
**Excluded from Stage 0 basis by default:** Marketing, general overhead, unrelated R&D, opportunity cost, and speculative “market value” uplifts not expressed via Target Multiple.
**Blocked on research/legal:** Employee vs contractor rate disclosure norms; mandatory audit of direct costs.
---
## Q6 — Currency and FX (6)
**Working default:**
A Phase has **one native currency** (`phase.initial_target.currency`). All ledger entries for that Phase **must** use the same currency in Stage 0.
**Schema rule:** Reject entry currency mismatches. No FX conversion in the pure fold.
**Later:** Optional FX extension may be registered; until then multi-currency Phases are out of scope.
---
## Q7 — Progress-sensitive degeneration formula (7)
**Adopted 2026-07-29** (`workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md` T02, maintainer-accepted): `trsl:policy:linear-longstop-v0` is confirmed as the v1 norm for the first pilot cohort, not merely a Stage 0 pilot placeholder.
**The policy's own definition** (formula, schedule, and the not-yet-adopted `progress-paused-longstop-v1` candidate) lives at `specs/policies/linear-longstop-v0.md` (WP-0015-T02) — this entry is the *decision record* ("this is the accepted v1 norm, adopted 2026-07-29"), not the policy's content.
**Every Phase MUST declare a Longstop Date** (or equivalent full-remission instant) in the Phase Manifest for Stage 0 conformance.
**Schema:** Treat `phase.longstop_at` (ISO 8601) as **Required** for Stage 0 validators (extension of TSD §3.1 recommended fields → required under working defaults).
**Rationale:** Prevents indefinite restriction if the product hypothesis fails (PRD risk table; concept §13.3).
---
## Q9 — Public metrics mandatory set (9)
**Working default — mandatory public facts:**
- Initial Target, currency
- Cumulative Development Credit
- Cumulative Remission Credit
- Outstanding Target
- Conversion status
- Last ledger entry id / checkpoint hash
- Longstop timestamp
**Recommended:** Development Credit velocity; time since last material Development Credit; forecast conversion date **labeled as forecast only**.
## Q10 — Minimum evidence for Development Credit (10)
**Working default — tiered evidence references:**
| Tier | `evidence_reference` | When |
| --- | --- | --- |
| E0 | Opaque internal id (`confidential:…`) | Allowed in Stage 0 fixtures; insufficient for external audit claims |
| E1 | Settled payment reference (processor/id) | Minimum for any public claim of Development Credit in a pilot |
| E2 | Contract + invoice + settlement set | Recommended for disputed or high-value credits |
**Recognition event (see extension contract):** Working default **`payment-settled`** only. Invoice/order without settlement do not create Development Credit in Stage 0 fold inputs.
**Blocked on legal:** Audit rights wording and confidential evidence disclosure process.
---
## Q11 — First canonical extensions (11)
**Working default — Stage 0 catalog targets:**
1.`development-license` — default development_allocation 100% of settled development fee (net of tax/refunds per extension)
1. Ledger is append-only; disputes create compensating entries, not silent edits.
2. Conversion already triggered remains irrevocable (Rule 9) even if a later dispute reduces Development Credit — shortfall is a commercial/audit matter, not re-restriction.
3. When the Trust Service operator is also a Phase licensor, attestations must be independently re-computable offline; public metrics must not depend on private operator judgment.
4.**(Added 2026-07-29, TRSL V1C1 §7.4)** Breach notices, cure status, and termination determinations for a Phase are published by the Trust Service as a public conformity signal, distinguishing `alleged` from `determined`. Publication is a ministerial record of the Licensor's (or a dispute process's) determination — the Trust Service does not itself decide whether a breach occurred.
5.**(Revised 2026-07-29, TRSL V1C1 §7.4 / Appendix A item 10 — blocked on legal)** Whether a published breach record names the affected Commercial Entitlement holder is governed by the applicable Commercial Use Agreement, not a License-wide default — the License itself only guarantees an anonymized Phase-and-category fallback where no Commercial Use Agreement addresses it or none exists. The open item is now drafting the Commercial Use Agreement template's own naming/consent/data-protection clause, not a License-text decision.
**Blocked on governance:** Full dispute SLA and third-party auditor program (PRD Phase 7).
---
## Q13 — Trust Service discontinuity (13)
**Working default:**
- Conversion is a pure function of Manifest + Ledger; offline recompute must remain possible.
- Every Phase SHOULD be exportable as a **phase evidence package** (manifest, ledger chain, extension snapshots, optional attestation).
- Operator failure must not be interpretable as “not converted” if Outstanding Target is already zero.
**Stage 0 delivery:** Specify package layout in WP-0002 golden example; full archival SLA later.
---
## Q14 — Cryptography / federation protocol (14)
**Working default for Stage 0 library:**
- Hash chain: SHA-256 over a canonical serialization of the previous entry (canonicalization algorithm fixed in schema ADR).
- Signatures: **Ed25519** over the same canonical bytes; public keys in a simple key registry file for examples.
- Key rotation: append-only key history document; not a multi-party federation protocol.
**Blocked on research:** Full federation discovery, threshold attestation, multi-operator conflict resolution.
---
## Q15 — Governance path (15)
**Working default:**
Founder/maintainer-controlled experimentation under this SCOPE until `TRSL-Governance.md` exists. Core term changes require human accept; extensions may be registered as conformant without being canonical.
---
## Schema checklist derived from defaults
Stage 0 validators SHOULD enforce:
1. Phase native currency consistency on all entries.
2.`longstop_at` present on every Phase Manifest.
3. Development Credit entries only with `recognition` consistent with payment-settled inputs (when extension data present).
4.`future_license` ∈ {`MIT`, `Apache-2.0`}.
5. Closed ledger entry type enum from TSD §3.2.
6. Outstanding Target = `max(0, T0 - C - R)` pure fold.
7. Conversion Attestation never required to compute conversion status.
---
## Revision history
| Date | Change |
| --- | --- |
| 2026-07-28 | Initial working defaults from SWOT I-09 / Stage 0 unblocking |