Accept WP-0012-T02: repo identification and Phase-provenance fields
Confirmed live against forgejo.coulomb.social before deciding rather than assuming: repo ids are real and stable (target-revenue is 103), but no instance-level hub identity exists (no nodeinfo endpoint), so the hub identifier has to be minted, not read from Forgejo. Decided: milestone_release gains required repo_hub/repo_hub_uri/ repo_id/repo_name; phase.base_phase_id is optional, absent for a first-ever Phase. The hub-to-URI mapping is hosted Trust Service data (a new table, parallel to licensor_identities), not a file in this framework repo, per the maintainer's steer that target-revenue must stay the generic framework rather than carry a specific deployment's repo list. Backfilling the three example manifests is deferred to after T03/T04/T05, since the schema change is shared across all three. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
This commit is contained in:
parent
53c5908e34
commit
2deddc3779
2 changed files with 44 additions and 2 deletions
|
|
@ -85,7 +85,7 @@ The concept's §13 now defines a **Global Contingency Share Determination Rule**
|
|||
| [TREV-WP-0009](workplans/TREV-WP-0009-target-revenue-control-plane.md) | Target Revenue Control Plane — interactive UI for the `binky` tenant, incl. interactive Development Credit entry creation (`specs/TargetRevenueControlPlaneConcept.md`) — **finished**, all 4 tasks done. **T04 (interactive UI, `src/target_revenue/service/control_plane_app.py`) built on vendored `whynot-design` web components** rather than from scratch, per an explicit feasibility check |
|
||||
| [TREV-WP-0010](workplans/TREV-WP-0010-development-effort-calculator.md) | Development Effort Calculator — **finished**, all 3 tasks done. Applied to the three real pilot candidates (`history/260730-EffortCalculator-CandidateApplication.md`) — every calculator-derived Initial Target came out materially lower than the earlier hand-picked placeholders, two of three carrying explicit warnings recommending manual review |
|
||||
| [TREV-WP-0011](workplans/TREV-WP-0011-railiance-reef-deployment.md) | Deploy Trust Service + Control Plane to the Railiance reef, fronted by `revenue.coulomb.social` — active; T01 (deployment-pattern decision, human gate) next. Deployment alone does not authorize a real Phase go-live — that remains WP-0008-T05 |
|
||||
| [TREV-WP-0012](workplans/TREV-WP-0012-phase-provenance-and-policy-modeling.md) | Phase provenance, ledger reference, and degeneration-policy modeling — active; T01 done (`specs/PhaseLifecycleUseCases.md`), T02 (repo/provenance fields, human gate) next. Modeling-only: produces a use-cases spec + a discussable spec addendum, no schema/UI changes yet |
|
||||
| [TREV-WP-0012](workplans/TREV-WP-0012-phase-provenance-and-policy-modeling.md) | Phase provenance, ledger reference, and degeneration-policy modeling — active; T01, T02 done. **T02 accepted 2026-07-30**: `milestone_release` gains required `repo_hub`/`repo_hub_uri`/`repo_id`/`repo_name`, `phase.base_phase_id` optional for successive Phases; hub↔URI mapping lives in the hosted Trust Service, not this repo. T03 (policy spec-file convention, human gate) next |
|
||||
| [TREV-WP-0013](workplans/TREV-WP-0013-remission-credit-automation.md) | Remission Credit automation (degeneration policy execution) — active; T01–T03 `wait` on WP-0012-T03's policy-spec-file decision. Nothing currently computes or writes `remission-credit` ledger entries |
|
||||
| [TREV-WP-0014](workplans/TREV-WP-0014-control-plane-extensions-breach-attestation-ui.md) | Control Plane UI: Extension Registry, Breach Records, Conversion Attestation — active; T01 next. Backend for all three already exists (WP-0006); UI-only work, not blocked on WP-0012 |
|
||||
|
||||
|
|
|
|||