Complete WP-0012-T05: Phase provenance spec addendum draft
specs/PhaseProvenanceSpecAddendum.md synthesizes T02-T04's accepted decisions into one reviewable document: the phase_manifest schema diff (repo_hub/repo_hub_uri/repo_id/repo_name, base_phase_id), the specs/policies/ + specs/profiles/ extraction with concrete file lists and frontmatter shapes, the ledger UI change, a forgejo_hubs migration sketch for the hosted hub registry, the three-example-manifest backfill plan, and a suggested implementation task breakdown. This is a proposal only, not yet accepted for implementation -- per the maintainer's own established sequencing, this is the document to discuss before any of it is filed as its own workplan. All five WP-0012 tasks are done; workplan marked finished. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
This commit is contained in:
parent
8aa04a1f05
commit
694b280a7e
3 changed files with 280 additions and 5 deletions
|
|
@ -39,6 +39,7 @@ Extracted and stabilized from the concept draft under `workplans/TREV-WP-0003-no
|
|||
| [`specs/TargetLedgerSpecification.md`](specs/TargetLedgerSpecification.md) | Ledger entry types, hash chain, Outstanding Target fold |
|
||||
| [`specs/MonetizationExtensionSpecification.md`](specs/MonetizationExtensionSpecification.md) | Six-field extension contract, registered vs. canonical |
|
||||
| [`specs/PhaseLifecycleUseCases.md`](specs/PhaseLifecycleUseCases.md) | Nine Phase-lifecycle use cases mapped to what's built, what's a real gap, and what has no UI by design (WP-0012-T01) |
|
||||
| [`specs/PhaseProvenanceSpecAddendum.md`](specs/PhaseProvenanceSpecAddendum.md) | Proposed schema/spec-file/UI changes from WP-0012-T02–T04's accepted decisions — repo provenance fields, `specs/policies/`/`specs/profiles/` extraction, ledger UI treatment. **Not yet accepted for implementation** (WP-0012-T05) |
|
||||
|
||||
**Forbidden synonyms:** do not treat undifferentiated "revenue captured" as equivalent to Development Credit (see `CONTRIBUTING.md` § Terminology); do not call pre-conversion software "Open Source" (see the guardrail table above).
|
||||
|
||||
|
|
@ -85,7 +86,7 @@ The concept's §13 now defines a **Global Contingency Share Determination Rule**
|
|||
| [TREV-WP-0009](workplans/TREV-WP-0009-target-revenue-control-plane.md) | Target Revenue Control Plane — interactive UI for the `binky` tenant, incl. interactive Development Credit entry creation (`specs/TargetRevenueControlPlaneConcept.md`) — **finished**, all 4 tasks done. **T04 (interactive UI, `src/target_revenue/service/control_plane_app.py`) built on vendored `whynot-design` web components** rather than from scratch, per an explicit feasibility check |
|
||||
| [TREV-WP-0010](workplans/TREV-WP-0010-development-effort-calculator.md) | Development Effort Calculator — **finished**, all 3 tasks done. Applied to the three real pilot candidates (`history/260730-EffortCalculator-CandidateApplication.md`) — every calculator-derived Initial Target came out materially lower than the earlier hand-picked placeholders, two of three carrying explicit warnings recommending manual review |
|
||||
| [TREV-WP-0011](workplans/TREV-WP-0011-railiance-reef-deployment.md) | Deploy Trust Service + Control Plane to the Railiance reef, fronted by `revenue.coulomb.social` — active; T01 (deployment-pattern decision, human gate) next. Deployment alone does not authorize a real Phase go-live — that remains WP-0008-T05 |
|
||||
| [TREV-WP-0012](workplans/TREV-WP-0012-phase-provenance-and-policy-modeling.md) | Phase provenance, ledger reference, and degeneration-policy modeling — active; T01–T04 done. **T02**: `milestone_release` gains required `repo_hub`/`repo_hub_uri`/`repo_id`/`repo_name`, `phase.base_phase_id` optional for successive Phases; hub↔URI mapping lives in the hosted Trust Service, not this repo. **T03**: `specs/policies/` + `specs/profiles/` subdirectories (one file per policy/profile, id+revision frontmatter), rendered read-only via a new lightweight server-side markdown route. **T04 accepted 2026-08-03**: registration form drops the `ledger` input (auto-computed), drill-down shows only the raw reference + live-data link. T05 (spec addendum draft) next |
|
||||
| [TREV-WP-0012](workplans/TREV-WP-0012-phase-provenance-and-policy-modeling.md) | Phase provenance, ledger reference, and degeneration-policy modeling — **finished**, all 5 tasks done. Decisions (T02–T04) synthesized into [`specs/PhaseProvenanceSpecAddendum.md`](specs/PhaseProvenanceSpecAddendum.md) (T05) — **not yet accepted for implementation**; that's the document to discuss before any schema/UI work is filed as its own workplan |
|
||||
| [TREV-WP-0013](workplans/TREV-WP-0013-remission-credit-automation.md) | Remission Credit automation (degeneration policy execution) — active; T01–T03 `wait` on WP-0012-T03's policy-spec-file decision. Nothing currently computes or writes `remission-credit` ledger entries |
|
||||
| [TREV-WP-0014](workplans/TREV-WP-0014-control-plane-extensions-breach-attestation-ui.md) | Control Plane UI: Extension Registry, Breach Records, Conversion Attestation — active; T01 next. Backend for all three already exists (WP-0006); UI-only work, not blocked on WP-0012 |
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue