Implement Development Effort Calculator (WP-0010-T02)

src/target_revenue/effort_calculator.py implements Candidate A
(labor-cost-anchored, accepted T01): commit-timestamp session-gap
clustering for human interaction time, workplan/task-volume counts via
direct workplans/ directory parsing (no state-hub dependency, works
uniformly on any repo using this repo's own convention), file/line
counts with generated/vendored-path exclusion, and caller-supplied
token-cost pricing. estimate_target_basis() combines these and returns
a derivation dict (every input shown) plus a warnings list - never a
black-box dollar figure.

1-day manual-work floor, as requested: any raw commit-clustered
estimate below 1.0 day is floored and flagged with a warning that this
is very likely a measurement gap (commit-clustering is a floor
estimate by design) that should usually be compensated for by manual
override, not trusted at face value. A second, independent
sanity-check warning fires when finished-workplan/task volume is
substantial but the time estimate is still low, even above the floor -
demonstrated live against target-revenue's own history (7 finished
workplans, 57 tasks correctly flagged a 2.38-day estimate as
under-counted).

scripts/effort_calculator_cli.py: CLI wrapper printing JSON, following
the same offline-first, no-Phase-declaration pattern as
scripts/trf_onboard.py. tests/test_effort_calculator.py (15
deterministic tests, throwaway git repos/tmp_path fixtures) covers
commit clustering, workplan/task parsing, size-metric exclusion,
token-cost pricing, the floor-and-warning behavior, the sanity-check
warning, and an end-to-end smoke test. No new hard dependency.
This commit is contained in:
tegwick 2026-07-30 13:16:44 +02:00
parent 37ccee22ab
commit 9566e16a97
6 changed files with 720 additions and 2 deletions

View file

@ -82,7 +82,7 @@ The concept's §13 now defines a **Global Contingency Share Determination Rule**
| [TREV-WP-0007](workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md) | Degeneration policy + canonical monetization profile catalog — **finished**, all 4 tasks done. `trsl:policy:linear-longstop-v0` confirmed 2026-07-29 as the v1 norm for the first pilot cohort; `progress-paused-longstop-v1` named as the next iteration, not yet adopted |
| [TREV-WP-0008](workplans/TREV-WP-0008-governance-and-pilot-rollout.md) | Governance formalization + pilot rollout — active; T01T04 done. `info-tech-canon` dry-run onboarding routine exercised end-to-end 2026-07-29. **Org-wide TRSL license adoption executed 2026-07-30** across ~90 `coulomb`-org repos (`history/260730-TRSL-OrgWideLicenseRollout.md`) — a license-text adoption, not a Phase declaration. T05 (real Phase go-live gate) remains `todo` by design; no Phase exists yet for any repo |
| [TREV-WP-0009](workplans/TREV-WP-0009-target-revenue-control-plane.md) | Target Revenue Control Plane — interactive UI for the `binky` tenant, incl. interactive Development Credit entry creation (`specs/TargetRevenueControlPlaneConcept.md`) — active; **T01 accepted 2026-07-30** (four rights tiers confirmed; per-human sub-credentials at the Trust Service layer chosen over the concept's own simpler recommendation) — adds a real prerequisite: T02 extends WP-0006's finished auth layer before T03 (Control Plane backend) and T04 (interactive UI) can proceed |
| [TREV-WP-0010](workplans/TREV-WP-0010-development-effort-calculator.md) | Development Effort Calculator — turns human time/workplan-task volume/repo size/AI token cost into `target_basis` values feeding the framework's existing Initial Target formula (`specs/DevelopmentEffortCalculatorConcept.md`) — active; **T01 accepted 2026-07-30 (Candidate A, labor-cost-anchored)**; T02 (implementation) next. Split from TREV-WP-0009 2026-07-30 |
| [TREV-WP-0010](workplans/TREV-WP-0010-development-effort-calculator.md) | Development Effort Calculator — turns human time/workplan-task volume/repo size/AI token cost into `target_basis` values feeding the framework's existing Initial Target formula (`specs/DevelopmentEffortCalculatorConcept.md`) — active; T01 (Candidate A) and **T02 (implementation, `src/target_revenue/effort_calculator.py`, incl. a 1-day manual-work floor with warning) done**; T03 (apply to real candidates) next |
Hub index: [`WORK-RECORDS.md`](WORK-RECORDS.md) · brief: [`.custodian-brief.md`](.custodian-brief.md)