Advance WP-0008: governance, candidate survey, pilot manifests, CLA draft

T01: specs/TRSL-Governance.md. Resolves the Licensor-identity question
(maintainer decision, 2026-07-29): a single shared Licensor, Binky
Hedgehog GmbH, operating as the binky tenant, across all four product
lines - not per-product-line. Unblocks (does not itself resolve) the
License/CUA arbitral-institution selection now that the Licensor's own
jurisdiction is known. Tables versioning/extension-governance/operator-
governance status per concept §20, naming open items (compatibility
rules, deprecation criteria, conflict-of-interest rule, key-rotation
history) rather than silently assuming them solved.

T02: specs/PilotPhaseCandidateSurvey.md. Direct repo inspection (hub
had no goal data for three of four product lines) plus an Explore-agent
survey of all ten railiance-* repos. Two defensible candidates found:
NK-WP-0002 Local Identity (net-kingdom, Incremental 10x) and
vergabe-teilnahme (railiance-apps, Product-defining 100x, the only
genuinely product-shaped deliverable across ten railiance-* repos).
coulomb-loop and helix-forge have no candidate, for stated principled
reasons (internal tooling; pre-implementation-stage, respectively).

T03: examples/pilot-candidates/ - draft, non-binding Phase Manifests
for both real candidates, trsl:phase:draft-* ids, empty ledgers,
schema-validated, explicit README stating nothing here is authorized
to go live.

T04: specs/TRSL-ContributorLicenseAgreement-Draft.md, implementing the
CLA-not-assignment recommendation from
history/260729-TRSL-ContributorRights-Research.md - narrowly scoped to
the current Phase's TRSL terms plus its already-declared Future
License at Conversion, same preliminary-candidate treatment as the
License/CUA V1C1 documents. CONTRIBUTING.md updated to point at it
while keeping the external-contribution block in effect until accepted.

T05's precondition list updated to reflect what's now resolved, still
left todo by design pending the maintainer's own go-live decision.
This commit is contained in:
tegwick 2026-07-29 22:52:52 +02:00
parent 27e27ab97b
commit 9886742fa8
12 changed files with 677 additions and 8 deletions

View file

@ -80,7 +80,7 @@ The concept's §13 now defines a **Global Contingency Share Determination Rule**
| [TREV-WP-0005](workplans/TREV-WP-0005-enforcement-network-research.md) | Enforcement Network legal feasibility research — **finished**, T10 synthesis accepted 2026-07-29 on the same alpha/beta basis (Japan's Article 12 risk remains explicitly unresolved) |
| [TREV-WP-0006](workplans/TREV-WP-0006-trust-service-implementation.md) | Hosted Trust Service reference implementation (PRD Phase 4b) — **finished**, all 9 tasks done (Postgres-backed registries/ledger/metrics/attestation/breach-record, ADR-0002 accepted, onboarding CLI, hosted conformance suite) |
| [TREV-WP-0007](workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md) | Degeneration policy + canonical monetization profile catalog — **finished**, all 4 tasks done. `trsl:policy:linear-longstop-v0` confirmed 2026-07-29 as the v1 norm for the first pilot cohort; `progress-paused-longstop-v1` named as the next iteration, not yet adopted |
| [TREV-WP-0008](workplans/TREV-WP-0008-governance-and-pilot-rollout.md) | Governance formalization + pilot rollout across `coulomb-loop`/`net-kingdom`/`helix-forge`/`railiance-*` — active, not yet started; real Phase declarations gated behind T05 |
| [TREV-WP-0008](workplans/TREV-WP-0008-governance-and-pilot-rollout.md) | Governance formalization + pilot rollout across `coulomb-loop`/`net-kingdom`/`helix-forge`/`railiance-*` — active; T01 (Licensor: Binky Hedgehog GmbH), T02 (candidate survey), T03 (draft pilot manifests), T04 (CLA draft) done; T05 (go-live gate, human decision) remains `todo` by design |
Hub index: [`WORK-RECORDS.md`](WORK-RECORDS.md) · brief: [`.custodian-brief.md`](.custodian-brief.md)