Add Control Plane + Development Effort Calculator concepts and workplan
specs/TargetRevenueControlPlaneConcept.md: an interactive UI over the hosted Trust Service for the binky tenant, prioritizing interactive Development Credit entry creation. Flags the actual new design gap WP-0006 didn't need to solve: one Licensor token vs. multiple human users needing individually attributable actions - recommends the Control Plane hold the Licensor token server-side and layer its own human-user auth/audit log in front, rather than requiring a WP-0006 auth schema change, while leaving the choice to a human gate (T02). specs/DevelopmentEffortCalculatorConcept.md: turns four metric families (human interaction time via commit-clustering, workplan/task volume, file/line complexity, AI token cost via the state hub's get_token_summary) into target_basis values feeding the framework's own existing Initial Target formula - not a new formula. Presents two combination strategies (labor-cost-anchored vs. composite-index) as alternatives for a human gate (T01) rather than picking one. workplans/TREV-WP-0009-control-plane-and-effort-calculator.md: 5 tasks (two human-gated formula/rights decisions, two implementation tasks, one task to apply the calculator to the real candidate repos already identified in WP-0008). Explicitly does not declare any real Phase - both deliverables feed WP-0008-T05's own gate, they don't bypass it.
This commit is contained in:
parent
dcf6de57a4
commit
b93a60442c
4 changed files with 478 additions and 0 deletions
|
|
@ -81,6 +81,7 @@ The concept's §13 now defines a **Global Contingency Share Determination Rule**
|
|||
| [TREV-WP-0006](workplans/TREV-WP-0006-trust-service-implementation.md) | Hosted Trust Service reference implementation (PRD Phase 4b) — **finished**, all 9 tasks done (Postgres-backed registries/ledger/metrics/attestation/breach-record, ADR-0002 accepted, onboarding CLI, hosted conformance suite) |
|
||||
| [TREV-WP-0007](workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md) | Degeneration policy + canonical monetization profile catalog — **finished**, all 4 tasks done. `trsl:policy:linear-longstop-v0` confirmed 2026-07-29 as the v1 norm for the first pilot cohort; `progress-paused-longstop-v1` named as the next iteration, not yet adopted |
|
||||
| [TREV-WP-0008](workplans/TREV-WP-0008-governance-and-pilot-rollout.md) | Governance formalization + pilot rollout — active; T01–T04 done. `info-tech-canon` dry-run onboarding routine exercised end-to-end 2026-07-29. **Org-wide TRSL license adoption executed 2026-07-30** across ~90 `coulomb`-org repos (`history/260730-TRSL-OrgWideLicenseRollout.md`) — a license-text adoption, not a Phase declaration. T05 (real Phase go-live gate) remains `todo` by design; no Phase exists yet for any repo |
|
||||
| [TREV-WP-0009](workplans/TREV-WP-0009-control-plane-and-effort-calculator.md) | Target Revenue Control Plane (interactive UI for the `binky` tenant, incl. interactive Development Credit entry creation) + Development Effort Calculator (turns human time/workplan-task volume/repo size/AI token cost into `target_basis` values) — active, concepts only so far (`specs/TargetRevenueControlPlaneConcept.md`, `specs/DevelopmentEffortCalculatorConcept.md`); T01/T02 human-gated formula/rights decisions not yet made |
|
||||
|
||||
Hub index: [`WORK-RECORDS.md`](WORK-RECORDS.md) · brief: [`.custodian-brief.md`](.custodian-brief.md)
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue