Close WP-0007: confirm linear-longstop-v0 as adopted v1 norm (T02)

Maintainer (Bernd) accepted 2026-07-29: trsl:policy:linear-longstop-v0
is confirmed as the degeneration formula for the first pilot cohort,
per T01's recommendation - already implemented/tested, pilot-ready
today. progress-paused-longstop-v1 remains the named next iteration,
not required before WP-0008's pilot Phases proceed. Updates
OpenQuestions-WorkingDefaults.md Q7 from "working default" to
"Adopted 2026-07-29." All 4 WP-0007 tasks now done; workplan finished.
This commit is contained in:
tegwick 2026-07-29 22:37:08 +02:00
parent 685cdeca14
commit df3fdb5b64
3 changed files with 18 additions and 9 deletions

View file

@ -84,16 +84,15 @@ A Phase has **one native currency** (`phase.initial_target.currency`). All ledge
## Q7 — Progress-sensitive degeneration formula (7)
**Working default (pilot formula, not final norm):**
Publish a versioned policy id `trsl:policy:linear-longstop-v0` defined as:
**Adopted 2026-07-29** (`workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md` T02, maintainer-accepted): `trsl:policy:linear-longstop-v0` is confirmed as the v1 norm for the first pilot cohort, not merely a Stage 0 pilot placeholder. Defined as:
- Remission accrues **only** by time toward a declared **Longstop Date** (see Q8).
- Between Phase activation `t0` and Longstop `tL`,
\( R(t) = T_0 \times \mathrm{clamp}((t - t_0)/(t_L - t_0), 0, 1) \)
with discrete ledger `remission-credit` entries computed on a published schedule (e.g. daily or monthly UTC), **or** a single full remission at longstop for minimal implementations.
- Development Credit does not change the remission schedule in v0 (no progress-sensitive boost/pause yet).
- Development Credit does not change the remission schedule in v0 (no progress-sensitive boost/pause).
**Blocked on research:** Progress-sensitive pause when material Development Credit arrives; diversity-of-payers factors. Track in `TargetDegenerationPolicyResearch.md` (planned).
**Research complete, not adopted:** `specs/TargetDegenerationPolicyResearch.md` (T01) proposes a candidate `trsl:policy:progress-paused-longstop-v1` (a 90-day rolling "quiet period" pause on Remission Credit during active Development Credit periods) and explicitly recommends *not* adopting a diversity-of-payers factor (no gaming-resistant signal exists yet). v1 is the named next iteration, to be revisited once real pilot Development Credit data exists — not required before pilot Phases proceed under v0.
---