chore(consistency): sync task status from DB [auto]

Updated by fix-consistency on 2026-08-05:
  - update .custodian-brief.md for target-revenue
This commit is contained in:
custodian-sync 2026-08-05 15:59:58 +02:00
parent fdb59efbc3
commit f56d82f09a
8 changed files with 200 additions and 121 deletions

View file

@ -4,8 +4,8 @@
**Authority:** Describes what is actually in design or delivery *now*.
**Counterpart:** [`INTENT.md`](INTENT.md) is stable and aspirational. A gap between INTENT and this file is expected and is a maturity signal, not a defect.
**Last updated:** 2026-07-29
**Basis:** SWOT recommendations in `history/260728-SWOT-Assessment.md`; updated per §6's own trigger ("first hosted Trust Service pilot authorized") now that WP-0001/0002/0003 are finished and WP-0006/0007/0008 have started.
**Last updated:** 2026-08-05
**Basis:** SWOT recommendations in `history/260728-SWOT-Assessment.md`; first real Phase declared 2026-08-05 under WP-0008-T05 (`history/260805-T05-GoLive-info-tech-canon.md`).
---
@ -14,11 +14,12 @@
| Label | Meaning |
| --- | --- |
| **Stage 0 — finished** | Concept consolidated (WP-0003); Stage 0 schema/fold foundation finished (WP-0002); TRSL/CUA V1C1 accepted 2026-07-29 as counsel-briefing material (WP-0001) — not yet production legal text. |
| **Stage 1 — active** | Hosted Trust Service (WP-0006), degeneration/canonical-profile finalization (WP-0007), and governance + pilot rollout preparation (WP-0008) across the `coulomb` Forgejo org's product lines (`coulomb-loop`, `net-kingdom`, `helix-forge`, `railiance-*`). |
| **Stage 1 — pilot** | First real Phase declared 2026-08-05: `trsl:phase:info-tech-canon-service-surface` on `coulomb/info-tech-canon` (`history/260805-T05-GoLive-info-tech-canon.md`). Hosted Trust Service software finished (WP-0006); public reef deploy still WP-0011. |
| Trust Service federation | Stages 16 from concept §15 are **out of current delivery scope** (design readiness only) — unrelated to this document's "Stage 0/1" labels, which track this repo's own maturity, not the Trust Service's federation roadmap. |
| Legal TRSL/CUA | Accepted as counsel-briefing material, still **not production legal text** — specialist legal review (License/CUA Appendix A condition 1) remains required before any real Phase; see `workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T05. |
| Alpha/beta legal-review deferral | **Maintainer decision, 2026-07-29**: full specialist legal review of the TRSL/CUA (condition 1 above) is explicitly postponed until the framework moves out of beta, since legal and commercial exposure during build/alpha is limited and the License/CUA will be revised on stakeholder/customer feedback before the legal framework settles. This closed `workplans/TREV-WP-0004-global-jurisdiction-research.md` and `workplans/TREV-WP-0005-enforcement-network-research.md` with a synthesis of alpha/beta working defaults (governing law/arbitration, liability cap, data protection, Enforcement Network fee mechanics) rather than full resolution — see `history/260729-TRSL-Jurisdiction-Synthesis.md` §3 and `history/260729-TREN-Synthesis.md` for exactly what is and is not covered by this deferral. It does **not** waive WP-0008-T05's other preconditions (Licensor identity, hosted Trust Service), and it does **not** mean the legal framework is finished — only that it is judged sufficient to operate pilot-stage Phases under bounded, known risk. |
| Org-wide license adoption | **Maintainer decision, 2026-07-30**: TRSL V1C1 adopted as the preliminary `LICENSE` across every repo in the `coulomb` Forgejo org (see `history/260730-TRSL-OrgWideLicenseRollout.md`) — one flagged exception (`the-custodian`, pre-existing proprietary/confidential license, not touched pending separate confirmation). **This is a license-text adoption, not a Phase declaration** — no Initial Target, Trust Service registration, or Development Credit tracking exists for any repo as a result; `workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T05 remains unaccepted. |
| Legal TRSL/CUA | Accepted as counsel-briefing material, still **not production legal text**. Pilot Phases operate under the alpha/beta legal-review deferral with an **explicit pilot scope** recorded at T05 (`history/260805-T05-GoLive-info-tech-canon.md` §1). |
| Alpha/beta legal-review deferral | **Maintainer decision, 2026-07-29**: full specialist legal review of the TRSL/CUA is postponed until out of beta. **T05 (2026-08-05)** confirmed this waiver covers the first pilot Phase only (info-tech-canon service surface), under the jurisdiction/Enforcement Network alpha/beta working defaults — not all product lines forever. |
| Org-wide license adoption | **Maintainer decision, 2026-07-30**: TRSL V1C1 as preliminary `LICENSE` across the `coulomb` Forgejo org (`history/260730-TRSL-OrgWideLicenseRollout.md`). Distinct from Phase declaration. |
| First Phase declaration | **Maintainer decision, 2026-08-05**: WP-0008-T05 accepted; first Phase is `trsl:phase:info-tech-canon-service-surface`. |
---
@ -55,14 +56,14 @@
| Item | Status |
| --- | --- |
| Hosted Trust Service *implementation* | **In scope now**`workplans/TREV-WP-0006-trust-service-implementation.md`, active |
| Hosted Trust Service *accepting real production data* | Still out of scope until WP-0008-T05 |
| Finalized legal license text and commercial agreements | TRSL/CUA V1C1 accepted as counsel-briefing material (WP-0001); specialist legal review still outstanding |
| Final degeneration formula as irreversible norm | **In scope now**`workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md`, active |
| Hosted Trust Service *accepting pilot Phase data* | **In scope now** for the T05 pilot Phase (local pilot instance; public reef still WP-0011) |
| Finalized legal license text and commercial agreements | TRSL/CUA V1C1 still preliminary; pilot operates under alpha/beta waiver + T05 scope record |
| Final degeneration formula as irreversible norm | v1 norm `linear-longstop-v0` adopted (WP-0007); automation implemented (WP-0013) |
| Federation Stage 2+ (replication, multi-operator, multi-authority) | PRD Roadmap Phase 6 — still deferred |
| Governance formalization *document* | **In scope now**`workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T01, active |
| Governance formalization *document* | Done — `specs/TRSL-Governance.md` (WP-0008-T01) |
| Tax / statutory revenue recognition | Permanently out of framework core (INTENT boundaries) |
| Governing third-party product Phases in production (real Phase declarations, real Commercial Entitlements sold) | **Still out of scope** — gated behind `workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T05 (legal review + Licensor governance decision) |
| Accepting external code into a governed Milestone Release | Until contributor-rights instrument exists — draft in progress, `workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T04 |
| Additional product-line Phase declarations beyond the first pilot | **Not auto-authorized** — each further Phase is a deliberate declaration act; T05 named only `info-tech-canon` |
| Accepting external code into a governed Milestone Release | Until CLA is accepted — draft exists (WP-0008-T04); block remains in `CONTRIBUTING.md` |
---