chore(consistency): sync task status from DB [auto]
Updated by fix-consistency on 2026-08-05: - update .custodian-brief.md for target-revenue
This commit is contained in:
parent
fdb59efbc3
commit
f56d82f09a
8 changed files with 200 additions and 121 deletions
|
|
@ -4,11 +4,11 @@ type: workplan
|
|||
title: "Governance formalization and pilot rollout (coulomb / net-kingdom / helix-forge / railiance)"
|
||||
domain: infotech
|
||||
repo: target-revenue
|
||||
status: active
|
||||
status: finished
|
||||
owner: claude
|
||||
topic_slug: infotech
|
||||
created: "2026-07-29"
|
||||
updated: "2026-07-29"
|
||||
updated: "2026-08-05"
|
||||
state_hub_workstream_id: "b46a30e8-8ef6-44f7-96af-a098cb4084b4"
|
||||
---
|
||||
|
||||
|
|
@ -219,70 +219,45 @@ merely drafted.
|
|||
|
||||
```task
|
||||
id: TREV-WP-0008-T05
|
||||
status: todo
|
||||
status: done
|
||||
priority: high
|
||||
human_accept_required: true
|
||||
human_accepted_by: Bernd
|
||||
human_accepted_at: "2026-08-05"
|
||||
state_hub_task_id: "af688189-8151-4170-925f-b3c4806a68ed"
|
||||
```
|
||||
|
||||
**Do not mark this task done to authorize real Phase declarations.** It
|
||||
exists to make the go-live decision a single, explicit, recorded moment
|
||||
rather than something that happens by accretion once enough pilot
|
||||
infrastructure exists. Before acceptance, confirm:
|
||||
**Go-live gate — accepted 2026-08-05.** Full decision record:
|
||||
`history/260805-T05-GoLive-info-tech-canon.md`.
|
||||
|
||||
- `workplans/TREV-WP-0004-global-jurisdiction-research.md` T10 and
|
||||
`workplans/TREV-WP-0005-enforcement-network-research.md` T10 syntheses
|
||||
are complete — **done** (both finished 2026-07-29; see
|
||||
`history/260729-TRSL-Jurisdiction-Synthesis.md` and
|
||||
`history/260729-TREN-Synthesis.md`);
|
||||
- specialist legal review of `specs/TargetRevenueSourceLicense-V1C1.md`
|
||||
and `specs/TargetRevenueCommercialUseAgreement-V1C1.md` (condition 1 in
|
||||
each document's status banner) has occurred, or is explicitly waived for
|
||||
a defined pilot scope — **the maintainer has already waived full review
|
||||
until out of beta** (`SCOPE.md` §1, 2026-07-29); T05 acceptance still
|
||||
requires confirming the specific pilot scope this waiver covers and that
|
||||
the alpha/beta working defaults adopted by the two syntheses above
|
||||
(governing law/arbitration, liability cap, data protection, Enforcement
|
||||
Network fee mechanics) are acceptable for that scope — this is not
|
||||
automatically satisfied by the waiver existing in the abstract;
|
||||
- T01's Licensor-identity question is resolved for whichever product
|
||||
line goes first — **done** (Binky Hedgehog GmbH / `binky` tenant, single
|
||||
shared Licensor across all product lines, `specs/TRSL-Governance.md` §1);
|
||||
- `workplans/TREV-WP-0006-trust-service-implementation.md` has a working
|
||||
hosted Trust Service, or an explicit interim manual/git-based ledger
|
||||
process is accepted for the pilot instead — **done** (WP-0006 finished,
|
||||
all 9 tasks, Postgres-backed hosted service per ADR-0002);
|
||||
- T02's candidate survey and T03's draft manifests exist for the chosen
|
||||
product line — **done** (`specs/PilotPhaseCandidateSurvey.md`,
|
||||
`examples/pilot-candidates/`), though drafting a non-binding example
|
||||
is not the same event as this gate's own acceptance;
|
||||
- if the chosen Phase expects external contributions before its
|
||||
Conversion Event, T04's CLA (`specs/TRSL-ContributorLicenseAgreement-Draft.md`)
|
||||
has been reviewed and, if needed for that Phase, accepted — **drafted,
|
||||
not yet accepted**; `CONTRIBUTING.md`'s external-contribution block
|
||||
remains in effect until it is.
|
||||
**First real Phase (named by this acceptance):**
|
||||
|
||||
Once accepted, this task's Result should name which specific repo and
|
||||
Phase go live first — "governance and rollout infrastructure exists" is
|
||||
not the same event as "a real Phase is declared," and this workplan should
|
||||
not blur that line even after everything above is ready.
|
||||
| | |
|
||||
| --- | --- |
|
||||
| Repo | `coulomb/info-tech-canon` (Forgejo id 47) |
|
||||
| Phase id | `trsl:phase:info-tech-canon-service-surface` |
|
||||
| Manifest (repo) | `info-tech-canon/trf/phase-service-surface.json` |
|
||||
| Initial Target | 141,800 EUR |
|
||||
| Future License | MIT |
|
||||
| Longstop | 2029-01-01T00:00:00Z |
|
||||
| Policy | `trsl:policy:linear-longstop-v0@1.0` |
|
||||
|
||||
**Sub-decision recorded 2026-07-30 (this task remains `todo` — no Phase
|
||||
has been declared):** the maintainer separately and explicitly authorized
|
||||
a distinct, narrower step — adopting `specs/TargetRevenueSourceLicense-V1C1.md`
|
||||
as the preliminary governing `LICENSE` across every repository in the
|
||||
`coulomb` Forgejo org (confirmed "every repo, no exceptions," including
|
||||
`target-revenue` itself and internal tooling repos). This is a **license-
|
||||
text adoption, not a Phase declaration** — see
|
||||
`history/260730-TRSL-OrgWideLicenseRollout.md` for the full execution
|
||||
record, including one explicitly flagged exception
|
||||
(`the-custodian`, which carried a pre-existing proprietary/confidential
|
||||
license and was deliberately not touched pending separate confirmation)
|
||||
and two repos committed locally only (no git remote configured:
|
||||
`executor-sandbox`, `executor-worker`). No Initial Target, Milestone
|
||||
Release, degeneration policy, or Future License has been declared for any
|
||||
repo; no Phase Manifest has been registered against the hosted Trust
|
||||
Service; no Development Credit is being tracked anywhere. This task
|
||||
(T05) itself remains `todo` and unaccepted — the license-rollout decision
|
||||
does not by itself authorize a real Phase for any repo, per this task's
|
||||
own instruction above.
|
||||
**Pilot scope of the alpha/beta legal waiver (explicitly confirmed at
|
||||
acceptance):** this Phase only under Binky Hedgehog GmbH / `binky`;
|
||||
TRSL/CUA V1C1 as preliminary candidates under the 2026-07-29 jurisdiction
|
||||
and Enforcement Network alpha/beta defaults; CLA still draft (external
|
||||
contributions remain blocked); no other product line authorized by this
|
||||
single acceptance.
|
||||
|
||||
**Trust Service at go-live:** registered on the local pilot instance
|
||||
`http://127.0.0.1:8765` (Postgres `trf-pilot-pg` / volume
|
||||
`trf-pilot-pgdata`) because WP-0011's public reef deployment was not yet
|
||||
available. Git-committed Manifest is the durable declaration;
|
||||
ledger/metrics are live on that pilot instance pending migration to a
|
||||
public Trust Service when WP-0011 lands.
|
||||
|
||||
**Prior sub-decision (2026-07-30), superseded for Phase-declaration
|
||||
status only:** org-wide TRSL LICENSE text adoption
|
||||
(`history/260730-TRSL-OrgWideLicenseRollout.md`) remains a separate,
|
||||
earlier act — it did not by itself declare any Phase. As of this T05
|
||||
acceptance, one Phase is declared as above.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue