chore(consistency): sync task status from DB [auto]

Updated by fix-consistency on 2026-08-05:
  - update .custodian-brief.md for target-revenue
This commit is contained in:
custodian-sync 2026-08-05 15:59:58 +02:00
parent fdb59efbc3
commit f56d82f09a
8 changed files with 200 additions and 121 deletions

View file

@ -4,11 +4,11 @@ type: workplan
title: "Governance formalization and pilot rollout (coulomb / net-kingdom / helix-forge / railiance)"
domain: infotech
repo: target-revenue
status: active
status: finished
owner: claude
topic_slug: infotech
created: "2026-07-29"
updated: "2026-07-29"
updated: "2026-08-05"
state_hub_workstream_id: "b46a30e8-8ef6-44f7-96af-a098cb4084b4"
---
@ -219,70 +219,45 @@ merely drafted.
```task
id: TREV-WP-0008-T05
status: todo
status: done
priority: high
human_accept_required: true
human_accepted_by: Bernd
human_accepted_at: "2026-08-05"
state_hub_task_id: "af688189-8151-4170-925f-b3c4806a68ed"
```
**Do not mark this task done to authorize real Phase declarations.** It
exists to make the go-live decision a single, explicit, recorded moment
rather than something that happens by accretion once enough pilot
infrastructure exists. Before acceptance, confirm:
**Go-live gate — accepted 2026-08-05.** Full decision record:
`history/260805-T05-GoLive-info-tech-canon.md`.
- `workplans/TREV-WP-0004-global-jurisdiction-research.md` T10 and
`workplans/TREV-WP-0005-enforcement-network-research.md` T10 syntheses
are complete — **done** (both finished 2026-07-29; see
`history/260729-TRSL-Jurisdiction-Synthesis.md` and
`history/260729-TREN-Synthesis.md`);
- specialist legal review of `specs/TargetRevenueSourceLicense-V1C1.md`
and `specs/TargetRevenueCommercialUseAgreement-V1C1.md` (condition 1 in
each document's status banner) has occurred, or is explicitly waived for
a defined pilot scope — **the maintainer has already waived full review
until out of beta** (`SCOPE.md` §1, 2026-07-29); T05 acceptance still
requires confirming the specific pilot scope this waiver covers and that
the alpha/beta working defaults adopted by the two syntheses above
(governing law/arbitration, liability cap, data protection, Enforcement
Network fee mechanics) are acceptable for that scope — this is not
automatically satisfied by the waiver existing in the abstract;
- T01's Licensor-identity question is resolved for whichever product
line goes first — **done** (Binky Hedgehog GmbH / `binky` tenant, single
shared Licensor across all product lines, `specs/TRSL-Governance.md` §1);
- `workplans/TREV-WP-0006-trust-service-implementation.md` has a working
hosted Trust Service, or an explicit interim manual/git-based ledger
process is accepted for the pilot instead — **done** (WP-0006 finished,
all 9 tasks, Postgres-backed hosted service per ADR-0002);
- T02's candidate survey and T03's draft manifests exist for the chosen
product line — **done** (`specs/PilotPhaseCandidateSurvey.md`,
`examples/pilot-candidates/`), though drafting a non-binding example
is not the same event as this gate's own acceptance;
- if the chosen Phase expects external contributions before its
Conversion Event, T04's CLA (`specs/TRSL-ContributorLicenseAgreement-Draft.md`)
has been reviewed and, if needed for that Phase, accepted — **drafted,
not yet accepted**; `CONTRIBUTING.md`'s external-contribution block
remains in effect until it is.
**First real Phase (named by this acceptance):**
Once accepted, this task's Result should name which specific repo and
Phase go live first — "governance and rollout infrastructure exists" is
not the same event as "a real Phase is declared," and this workplan should
not blur that line even after everything above is ready.
| | |
| --- | --- |
| Repo | `coulomb/info-tech-canon` (Forgejo id 47) |
| Phase id | `trsl:phase:info-tech-canon-service-surface` |
| Manifest (repo) | `info-tech-canon/trf/phase-service-surface.json` |
| Initial Target | 141,800 EUR |
| Future License | MIT |
| Longstop | 2029-01-01T00:00:00Z |
| Policy | `trsl:policy:linear-longstop-v0@1.0` |
**Sub-decision recorded 2026-07-30 (this task remains `todo` — no Phase
has been declared):** the maintainer separately and explicitly authorized
a distinct, narrower step — adopting `specs/TargetRevenueSourceLicense-V1C1.md`
as the preliminary governing `LICENSE` across every repository in the
`coulomb` Forgejo org (confirmed "every repo, no exceptions," including
`target-revenue` itself and internal tooling repos). This is a **license-
text adoption, not a Phase declaration** — see
`history/260730-TRSL-OrgWideLicenseRollout.md` for the full execution
record, including one explicitly flagged exception
(`the-custodian`, which carried a pre-existing proprietary/confidential
license and was deliberately not touched pending separate confirmation)
and two repos committed locally only (no git remote configured:
`executor-sandbox`, `executor-worker`). No Initial Target, Milestone
Release, degeneration policy, or Future License has been declared for any
repo; no Phase Manifest has been registered against the hosted Trust
Service; no Development Credit is being tracked anywhere. This task
(T05) itself remains `todo` and unaccepted — the license-rollout decision
does not by itself authorize a real Phase for any repo, per this task's
own instruction above.
**Pilot scope of the alpha/beta legal waiver (explicitly confirmed at
acceptance):** this Phase only under Binky Hedgehog GmbH / `binky`;
TRSL/CUA V1C1 as preliminary candidates under the 2026-07-29 jurisdiction
and Enforcement Network alpha/beta defaults; CLA still draft (external
contributions remain blocked); no other product line authorized by this
single acceptance.
**Trust Service at go-live:** registered on the local pilot instance
`http://127.0.0.1:8765` (Postgres `trf-pilot-pg` / volume
`trf-pilot-pgdata`) because WP-0011's public reef deployment was not yet
available. Git-committed Manifest is the durable declaration;
ledger/metrics are live on that pilot instance pending migration to a
public Trust Service when WP-0011 lands.
**Prior sub-decision (2026-07-30), superseded for Phase-declaration
status only:** org-wide TRSL LICENSE text adoption
(`history/260730-TRSL-OrgWideLicenseRollout.md`) remains a separate,
earlier act — it did not by itself declare any Phase. As of this T05
acceptance, one Phase is declared as above.