Commit graph

4 commits

Author SHA1 Message Date
1fb7212e2d Implement WP-0015-T02: extract policy/profile spec files
specs/policies/linear-longstop-v0.md extracted from
OpenQuestions-WorkingDefaults.md Q7's prose, with policy_id/title
frontmatter -- Q7 now records only the adoption decision, pointing at
this file for the formula itself.

Six specs/profiles/*.md files extracted from
CanonicalMonetizationProfiles.md's per-profile sections (#1-6), each
with extension_id/title frontmatter matching the ids already used in
real Phase Manifests. CanonicalMonetizationProfiles.md keeps the
cross-profile summary and non-goals sections, now pointing at the
extracted files instead of containing their content.

DevelopmentEffortCalculatorConcept.md gets calculator_id/revision/title
frontmatter for consistency, no move (already conformed as one file per
model). Checked for stale cross-references before editing -- nothing
in the repo links to the removed section anchors.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-03 20:49:22 +02:00
2a176d9961 Implement WP-0015-T01/T04/T06: Phase provenance schema + ledger UI
Schema: phase.milestone_release gains required repo_hub/repo_hub_uri/
repo_id/repo_name; phase gains optional base_phase_id. Backfilled the
golden phase-001 fixture (placeholder values, it's synthetic) and the
three real pilot-candidate manifests with actual Forgejo repo ids
confirmed live (net-kingdom=67, vergabe-teilnahme=62,
info-tech-canon=47, all coulomb/*).

Discovered along the way: the schema change alone would have broken
the existing Control Plane registration form, since nothing collected
the four new fields. Fixed inline rather than leaving it broken
between tasks -- this also completes T04's ledger UI change (drop the
hand-typed ledger input, auto-compute /phases/{id}/ledger, add a
drill-down reference link on phase_detail.html) since both changes
touch the same form/route.

Full suite: 94 passing offline (was 84), 158 passing with Docker
(was 146).

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-03 20:43:30 +02:00
11800c7da1 chore(consistency): sync workstream/task IDs for TREV-WP-0015
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-03 20:33:01 +02:00
9c7576e8de Accept PhaseProvenanceSpecAddendum, file TREV-WP-0015 implementation
specs/PhaseProvenanceSpecAddendum.md accepted 2026-08-03. Implementation
filed as its own workplan (TREV-WP-0015), seven tasks mapping 1:1 to
the addendum's sections rather than repeating field shapes/rationale:
schema change, specs/policies/ + specs/profiles/ extraction, Control
Plane reference-rendering routes, ledger UI change, forgejo_hubs
migration, backfilling the three example manifests, and tests/closeout.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-03 20:31:52 +02:00