Schema: phase.milestone_release gains required repo_hub/repo_hub_uri/
repo_id/repo_name; phase gains optional base_phase_id. Backfilled the
golden phase-001 fixture (placeholder values, it's synthetic) and the
three real pilot-candidate manifests with actual Forgejo repo ids
confirmed live (net-kingdom=67, vergabe-teilnahme=62,
info-tech-canon=47, all coulomb/*).
Discovered along the way: the schema change alone would have broken
the existing Control Plane registration form, since nothing collected
the four new fields. Fixed inline rather than leaving it broken
between tasks -- this also completes T04's ledger UI change (drop the
hand-typed ledger input, auto-compute /phases/{id}/ledger, add a
drill-down reference link on phase_detail.html) since both changes
touch the same form/route.
Full suite: 94 passing offline (was 84), 158 passing with Docker
(was 146).
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Delivers the offline runnable specification foundation for the Trust Layer
(TSD §3-§6), not a hosted Trust Service:
- JSON Schemas for Phase Manifest, Ledger Entry, Extension Contract, and
Conversion Attestation, encoding the Stage 0 working defaults (Q3 future
license enum, Q6 single-currency Phases, Q8 required longstop_at).
- src/target_revenue: pure Outstanding Target fold, SHA-256 hash-chain
verification, Ed25519 signing helpers, extension conformance checks
(including a core-term-redefinition heuristic), and conversion detection
that never requires an attestation document to determine conversion status.
- examples/phase-001: golden Phase package matching the concept doc's
worked example, generated via scripts/generate_golden_phase.py so the
hash chain is computed by the library itself, not hand-typed.
- 32 passing pytest tests covering manifest/ledger/extension conformance,
tamper/reorder detection, and the full lifecycle fold to conversion.
- docs/adr/ADR-0001: proposed (not accepted) Stage 0 stack choice, per the
WP-0002-T01 human-accept gate — implementation proceeded against the
proposal as the workplan note permits, but the task stays open.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>