# Pilot candidate Phase Manifests — DRAFT, NOT DECLARED These manifests are **draft, non-binding worked examples** (`workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T03), following the pattern established by `examples/phase-001/`. They are structurally valid and conformance-tested exactly like `examples/phase-001/`, but: - **No Commercial Entitlement is for sale under either manifest.** - **No Development Credit is being tracked for either candidate.** - **Neither repo's actual License header has been changed to TRSL.** - `phase.id` uses a `draft-` prefix specifically so it cannot be confused with a real, declared Phase. Built from the two candidates identified with a defensible rationale in `specs/PilotPhaseCandidateSurvey.md` (T02) — `coulomb-loop` and `helix-forge` produced no defensible candidate at survey time and are not represented here. **`info-tech-canon` (2026-07-29):** the maintainer chose `info-tech-canon` as the actual first repo to build up the practical Phase-declaration routine on, explicitly as a **dry run, not a go-live decision** (confirmed directly, not assumed) — see `specs/PilotPhaseCandidateSurvey.md` §5 for the candidate rationale. This repo was outside the original four product lines T02 surveyed; its candidate was added afterward as this specific, real routine-building exercise, not a T02 survey gap. **Nothing here is authorized to go live.** That remains gated behind `workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T05, regardless of how complete or plausible these examples look — including `info-tech-canon`, which was explicitly confirmed as dry-run-only. | Directory | Product line | Candidate deliverable | Indicative Target Multiple | |---|---|---|---| | `net-kingdom-local-identity/` | `net-kingdom` | `NK-WP-0002` Local Identity | Incremental (10x) | | `railiance-vergabe-teilnahme/` | `railiance-*` (`railiance-apps`) | `vergabe-teilnahme` (`RAILIANCE-WP-0002`/`-0014`) | Product-defining (100x) | | `info-tech-canon-service-surface/` | `info-tech-canon` | Cumulative service surface, `ITC-WP-0001`–`ITC-WP-0012` | Product-defining (100x) | All figures (`initial_target`, `target_basis`) are illustrative placeholders for this worked-example exercise, not a real costing or pricing proposal — see `specs/PilotPhaseCandidateSurvey.md` for the underlying candidate rationale.